ईसीआर ने वित्तीय वर्ष 2023-24 में 18.54 लाख यूनिट बिजली उत्पादन कर बचाए 77.81 लाख रुपएEast Central Railway is actively working towards a zero-carbon emission mission by reducing reliance on traditional energy and promoting solar power. They have installed 2197.52 kW of solar power on railway buildings at 52 stations across all five divisions, including 8 in Dhanbad division. Additionally, they are installing solar plants with...
more... a total capacity of 9432 kW across 260 stations, 120 buildings, and 116 level crossings in all five divisions. In Dhanbad division alone, 3760 kW capacity solar plants are being installed at 91 stations and 39 buildings. The Chief Public Relations Officer of East Central Railway, Saraswati Chandra, emphasized the need to minimize traditional energy consumption for a cleaner environment.
East Central Railway zero-carbon emission mission pe kaam kar raha hai. Unhone traditional energy ka use kam karke solar energy ko promote kiya hai. 5 divisions me 52 stations pe, jisme Dhanbad division ke 8 stations bhi hain, railway buildings pe 2197.52 kW capacity ka solar plant laga diya gaya...
more... hai. Iske alawa, 260 stations, 120 buildings aur 116 level crossings pe 9432 kW capacity ka solar plant lagane ka kaam chal raha hai. Dhanbad division me 91 stations aur 39 buildings pe 3760 kW capacity ka solar plant lagaaya ja raha hai. East Central Railway ke Chief Public Relations Officer, Saraswati Chandra ne kaha ki swachch paryavaran ke liye traditional energy ka kam se kam use karna zaruri hai.