CEG Bags Design Verification Engineer Contract for Bhopal and Indore Metro ProjectsConsulting Engineers Group Ltd. (CEG) has been selected as the Design Verification Engineer (DVE) for the Phase 1 projects of both Bhopal and Indore Metros. CEG will meticulously verify architectural, civil, geotechnical, and structural designs alongside water supply, sewage, and drainage systems for elevated and underground stations, including all associated temporary...
more... and permanent structures. This includes the 5.34 km elevated and 3.39 km underground segments for the Bhopal Metro and similar sections for the Indore Metro. CEG's bid of Rs. 16.30 crore, significantly under MPMRCL’s budget, was selected after a rigorous technical evaluation. The metro projects are steadily advancing with financial bids for packages like BH-03, BH-04, and IN-04 already unveiled and contractor selection underway. A key infrastructural link in the Indore Metro project is package IN-O5, set to connect the Indore Railway Station with the Indore Airport via seven underground stations. CEG's role as DVE is crucial in ensuring safety, efficiency, and sustainability in constructing these metro systems, which are poised to redefine urban mobility in Bhopal and Indore.
Consulting Engineers Group Ltd. (CEG) ko Bhopal aur Indore Metros ke Phase 1 projects ke liye Design Verification Engineer (DVE) banaya gaya hai. CEG elevated aur underground stations ke liye architectural, civil, geotechnical aur structural designs ke saath-saath water supply, sewage aur drainage system ko bhi meticulously verify karega. Isme...
more... Bhopal Metro ke 5.34 km elevated aur 3.39 km underground segments aur Indore Metro ke similar sections bhi include hain. CEG ka Rs. 16.30 crore ka bid, jo MPMRCL ke budget se kaafi kam tha, rigorous technical evaluation ke baad select kiya gaya. Metro projects steadily advance kar rahe hain, BH-03, BH-04, aur IN-04 jaise packages ke liye financial bids already unveil ho gaye hain aur contractor selection bhi chal raha hai. Indore Metro project mein package IN-O5 ek key infrastructural link hai, jo Indore Railway Station ko Indore Airport se seven underground stations ke through connect karega. CEG ka DVE ka role in metro systems ko construct karne mein safety, efficiency aur sustainability ensure karne ke liye bahut important hai, jo Bhopal aur Indore mein urban mobility ko redefine karne ke liye taiyar hain.