Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Wed Oct 23 11:11:11 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 544702
Mar 11 (20:50) CEG Selected as Design Verification Engineer for Bhopal and Indore Metro Phase 1 Projects
1436 views
0

Entry# 5994333   
  Past Edits
This is a new feature showing past edits to this News Post.
CEG Bags Design Verification Engineer Contract for Bhopal and Indore Metro Projects

Consulting Engineers Group Ltd. (CEG) has been selected as the Design Verification Engineer (DVE) for the Phase 1 projects of both Bhopal and Indore Metros. CEG will meticulously verify architectural, civil, geotechnical, and structural designs alongside water supply, sewage, and drainage systems for elevated and underground stations, including all associated temporary...
more...
and permanent structures. This includes the 5.34 km elevated and 3.39 km underground segments for the Bhopal Metro and similar sections for the Indore Metro. CEG's bid of Rs. 16.30 crore, significantly under MPMRCL’s budget, was selected after a rigorous technical evaluation. The metro projects are steadily advancing with financial bids for packages like BH-03, BH-04, and IN-04 already unveiled and contractor selection underway. A key infrastructural link in the Indore Metro project is package IN-O5, set to connect the Indore Railway Station with the Indore Airport via seven underground stations. CEG's role as DVE is crucial in ensuring safety, efficiency, and sustainability in constructing these metro systems, which are poised to redefine urban mobility in Bhopal and Indore.

Consulting Engineers Group Ltd. (CEG) ko Bhopal aur Indore Metros ke Phase 1 projects ke liye Design Verification Engineer (DVE) banaya gaya hai. CEG elevated aur underground stations ke liye architectural, civil, geotechnical aur structural designs ke saath-saath water supply, sewage aur drainage system ko bhi meticulously verify karega. Isme...
more...
Bhopal Metro ke 5.34 km elevated aur 3.39 km underground segments aur Indore Metro ke similar sections bhi include hain. CEG ka Rs. 16.30 crore ka bid, jo MPMRCL ke budget se kaafi kam tha, rigorous technical evaluation ke baad select kiya gaya. Metro projects steadily advance kar rahe hain, BH-03, BH-04, aur IN-04 jaise packages ke liye financial bids already unveil ho gaye hain aur contractor selection bhi chal raha hai. Indore Metro project mein package IN-O5 ek key infrastructural link hai, jo Indore Railway Station ko Indore Airport se seven underground stations ke through connect karega. CEG ka DVE ka role in metro systems ko construct karne mein safety, efficiency aur sustainability ensure karne ke liye bahut important hai, jo Bhopal aur Indore mein urban mobility ko redefine karne ke liye taiyar hain.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy