मुंबई : ‘मेट्रो २ अ’ आणि ‘मेट्रो ७’ मार्गिका : दोन्ही मार्गिकेच्या दैनंदिन प्रवासी संख्येत वाढ, आता ‘इतकी’ दैनंदिन प्रवाशी संख्याThe daily ridership on the ‘Dahisar – Andheri West Metro 2A’ and ‘Dahisar – Gundavali Metro 7’ lines in Mumbai has finally increased. The daily ridership has reached 260,471. The first phase of the 20 km long Dahisar – Dhanukarwadi – Aare line between these two lines was commissioned in April...
more... 2022 by the Mumbai Metropolitan Region Development Authority (MMRDA). The second phase was commissioned in January 2023, making the ‘Dahisar – Andheri West Metro 2A’ and ‘Dahisar – Gundavali Metro 7’ lines operational. Initially, the daily ridership was in the thousands, but it gradually increased to lakhs. Earlier, around 230,000 passengers used these lines every day, but now the daily ridership has increased to 260,471, as per the Mumbai Metro One Corporation Limited (MMMOCL). Meanwhile, the total ridership on these two lines has reached 10 crore in the past week.
Mumbai mein ‘Dahisar – Andheri West Metro 2A’ aur ‘Dahisar – Gundavali Metro 7’ lines par daily ridership mein finally increase aa gaya hai. Daily ridership 260,471 tak pahunch gaya hai. Mumbai Metropolitan Region Development Authority (MMRDA) ne April 2022 mein in dono lines ke beech 20 km lambi Dahisar –...
more... Dhanukarwadi – Aare line ka pahla phase commission kiya tha. January 2023 mein dusra phase commission hua aur ‘Dahisar – Andheri West Metro 2A’ aur ‘Dahisar – Gundavali Metro 7’ lines operational ho gayi. Starting mein daily ridership hazaar mein thi, par yeh gradually lakh mein pahunch gayi. Pehle har din around 230,000 passengers in lines ka use karte the, par ab daily ridership badhkar 260,471 ho gayi hai, yeh jankari Mumbai Metro One Corporation Limited (MMMOCL) ne di hai. Iske saath, pichle hafte in dono lines par total ridership 10 crore tak pahunch gaya hai.