K-RIDE calls tenders for construction of 18 stations on Kanaka LineK-RIDE, the implementing agency for the Bengaluru Suburban Railway Project (BSRP), has awarded L&T Limited the contract for the construction of the Kanaka Line's viaduct. Now, K-RIDE has called tenders for the construction of 18 stations on the Kanaka Line, divided into two packages. Package C4A includes 9 stations (1 elevated...
more... and 8 at-grade) from Heelalige to Kaggadasapura, with a project cost of Rs 504.11 crore and a 24-month deadline. Package C4B also includes 9 stations (1 elevated and 8 at-grade) from Channasandra to Rajankunte, with a project cost of Rs 528 crore and a 24-month deadline. Both packages include civil, structural, and architectural works. Earlier, K-RIDE called tenders for stations on the Mallige Line, connecting Benniganahalli with Chikkabanavar.
Bengaluru Suburban Railway Project (BSRP) ke liye, K-RIDE ne Kanaka Line ke viaduct ke construction ka contract L&T Limited ko de diya hai. Ab, K-RIDE ne Kanaka Line pe 18 stations ke construction ke liye tenders maange hain, jinko do packages mein baanta gaya hai. Package C4A mein 9 stations (1...
more... elevated aur 8 at-grade) hai, Heelalige se Kaggadasapura tak, Rs 504.11 crore ka project cost aur 24 mahine ka deadline ke saath. Package C4B mein bhi 9 stations (1 elevated aur 8 at-grade) hain, Channasandra se Rajankunte tak, Rs 528 crore ka project cost aur 24 mahine ka deadline ke saath. Dono packages mein civil, structural, aur architectural kaam shamil hain. Pehle, K-RIDE ne Mallige Line pe stations ke liye tenders maange the, jo Benniganahalli ko Chikkabanavar se jodta hai.