पटना जंक्शन पर जाम से मिलेगी मुक्ति; मल्टी लेवल पार्किंग, सब-वे का निर्माण जल्द, सीएम नीतीश ने लिया जायजाChief Minister Nitish Kumar inspected the under-construction subway from the multi-level parking lot to Patna Junction. He emphasized the need for this project to address traffic congestion near the junction. The multi-level parking hub and subway are nearing completion. It will offer passengers a direct connection from the parking lot to...
more... the junction via the subway, easing traffic congestion and improving access to the junction, Hanuman Temple, and nearby areas. The facility will include 32 bus and 225 car parking spaces, and will be connected to the existing parking lot near Buddha Smriti Park. The 440-meter long subway features four travelators (total length of 148 meters), two escalators, two underground box area lifts, and ventilation and air conditioning. The subway will have three entry/exit points: near the multi-level parking, near Buddha Smriti Park, and near Hanuman Temple.
Chief Minister Nitish Kumar ne Patna Junction ke ban rahe sub-way ka multi-level parking se inspection kiya. Unhone kaha ki junction ke paas traffic jam ki problem ko dekhte hue yeh banaya ja raha hai. Multi-level parking hub aur sub-way jaldi pura hone wala hai. Isse passengers ko parking se junction...
more... tak direct connection milega sub-way ke through, traffic jam kam hoga aur junction, Hanuman Temple, aur aas-paas ke jagah tak jaane mein aasaan hoga. Facility mein 32 bus aur 225 car parking spaces hongi, aur yeh Buddha Smriti Park ke paas wali parking se connected hoga. 440 meter lamba sub-way mein chaar travelator (total length 148 meter), do escalator, do underground box area lifts, aur ventilation aur air conditioning bhi hoga. Sub-way mein teen entry/exit points honge: multi-level parking ke paas, Buddha Smriti Park ke paas, aur Hanuman Temple ke paas.