Please wait...
PNR: 264-xxxxxxx
Latest Status as of: Sep 03 (21:40)
Passenger 1:
Cancelled: CAN (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 2053772/Puneri_Railfan^~ Show Full PNR Status History (15 statuses) Status as of: Sep 03 (21:40)
Passenger 1:
Cancelled: CAN (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 2053772/Puneri_Railfan^~ Status as of: Sep 01 (16:35)
Passenger 1:
RAC: RAC:25 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 1243573/Siddharth98^~ Status as of: Aug 30 (12:05)
Passenger 1:
RAC: RAC:25 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 2141220/Chintu_5^~ Status as of: Aug 27 (22:10)
Passenger 1:
RAC: RAC:27 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 42126/Jayashree^ Status as of: Aug 26 (12:20)
Passenger 1:
RAC: RAC:27 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 1243573/Siddharth98^~ Status as of: Aug 24 (16:00)
Passenger 1:
RAC: RAC:27 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 2053772/Puneri_Railfan_^~ Status as of: Aug 24 (14:32)
Passenger 1:
RAC: RAC:27 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 2141220/Chintu_5^~ Status as of: Aug 21 (21:23)
Passenger 1:
RAC: RAC:27 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 2053772/CivilEngineer_cum_Railfan^~ Status as of: Aug 20 (22:36)
Passenger 1:
RAC: RAC:27 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 42126/Jayashree^ Status as of: Aug 18 (21:55)
Passenger 1:
RAC: RAC:27 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 2053772/CivilEngineer_cum_Railfan^~ Status as of: Aug 18 (16:05)
Passenger 1:
RAC: RAC:27 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 1243573/Siddharth98^~ Status as of: Aug 16 (18:26)
Passenger 1:
RAC: RAC:27 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 1931755/Railfan_NF^~ Status as of: Aug 16 (06:35)
Passenger 1:
RAC: RAC:27 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 2053772/CivilEngineer_cum_Railfan^~ Status as of: Aug 15 (17:40)
Passenger 1:
RAC: RAC:27 (Booking Status:
RAC:27:GN )
Total Fare: 400 Chart NOT Prepared refreshed by: 1831952/Somanko_ELST^~ Status as of: Aug 15 (15:27)
The Shortest Route between Gorakhpur Jn and Anand Vihar Terminal is 32 km (4%) shorter. Travel Time: 13h 45m 6 halts Distance: 748 km Avg Speed: 54 km/hr Max Permissible Speed: 110 km/hr
Type: Mail/Express
Rake Zone: NER/North Eastern
Departs @ 20:55 Platform# 3
GKP/Gorakhpur Jn Arrives @ 10:40 +1 night Platform# 4
ANVT/Anand Vihar Terminal
6 halts. 120 intermediate Stations between Gorakhpur Junction and Anand Vihar Terminal 6 halts. 120 intermediate Stations between Gorakhpur Junction and Anand Vihar Terminal
#
Trk
Code
Station Name
X/O
Note
Arrives
Avg
Departs
Avg
Halt
PF
Day#
Km
Speed
Elev
Zone
Address
1
%≡≡%
-
20:55
-
3
1
0.0
60
84m
NER
Gorakhpur 273012, Uttar Pradesh
5 intermediate stations
00:34
33.9
2
/==/
21:29
-
21:31
-
2m
1
1
33.9
71
84m
NER
Khalilabad. Pin - 272175., Uttar Pradesh
3 intermediate stations
00:25
29.6
3
/==/
21:56
-
21:59
-
3m
1
1
63.5
70
99m
NER
Basti - 272 002, Uttar Pradesh
13 intermediate stations
01:16
88.4
4
/==/
X
23:15
-
23:20
-
5m
1
1
151.9
42
105m
NER
Gonda - 271 002, Uttar Pradesh
18 intermediate stations
02:50
117.6
5
%≡≡%
X O
02:10
-
02:20
-
10m
4
2
269.5
62
124m
NR
Lucknow 226004, Uttar Pradesh
51 intermediate stations
05:15
325.1
6
/==/
07:35
-
07:43
-
8m
3
2
594.6
59
193m
NR
Moradabad - 244 001, Uttar Pradesh
23 intermediate stations
02:23
140.8
7
/==/
X O
10:06
-
10:08
-
2m
3,4
2
735.4
24
217m
NR
Ghaziabad - 201 009, Uttar Pradesh
1 intermediate stations
00:32
12.6
8
/==/
10:40
-
-
4
2
748.0
-
207m
NR
Anand Vihar pincode 110092, Delhi NCT
Scroll to Top
Scroll to Bottom
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has
NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.