Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 6 22:58:20 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

NRMH/Naya Raipur
नया रायपुर

Track: Double Electric-Line

Station Address

Unnamed Road, Sector 2, Nawagaon-1, Naya Raipur
State: Chhattisgarh

Elevation: n/a
Type: Regular   Category: n/a
Zone: SECR/South East Central   Division: Raipur


No Recent News for NRMH/Naya Raipur
Nearby Stations in the News
Number of Platforms: n/a
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station Forum

Page#    Showing 6 to 10 of 65 blog entries  <<prev  next>>
Rail News
23567 views
0

SECR/South East Central
May 26 (13:18)   New Railway Station in Nava Raipur to Open Before Diwali, Connecting City to Major Hubs

Chetan~   1202 news posts
Entry# 6076305   News Entry# 553682         Tags   Past Edits
read full article... CG News: नवा रायपुर में अगले महीने बन जाएगा रेलवे स्टेशन, दीवाली के पहले दौड़ेगी यात्री ट्रेन, ये होंगी विशेषताएं

A new railway station near the Secretariat in Nava Raipur is expected to be completed by June, with passenger train services commencing before Diwali. The railway line connecting Nava Raipur to Kendri (Abhanpur) via a 25 km track is already complete, and three model stations are being built in the area....
more...
The station near the Secretariat, part of a multi-modal transport hub, will be integrated with bus and auto services. Other stations near Atal Nagar, Udyog Nagar, and Muktang are expected to be finished by December 2024. The project, originally scheduled for completion in December 2022, was delayed due to the pandemic and delays in obtaining track access from the Railway for electrification work. The station near the Secretariat is 80% complete and features include a shopping complex, integrated parking with bus and auto services, restaurants, and a 250-meter long railway platform. The project cost has escalated from ₹52 crores to ₹100 crores. The railway line is expected to significantly impact the development of Nava Raipur, connecting it to major cities like Bilaspur, Raipur, Durg, and Bhilai. The first station in Nava Raipur will be located near Atal Nagar, about 2 km from Mandir Hasaud.

Nava Raipur mein Secretariat ke paas ek naya railway station June mein banke taiyaar ho jaayega aur Diwali se pehle passenger train services shuru hone ki ummeed hai. Nava Raipur se Kendri (Abhanpur) tak 25 km track ke saath railway line ban chuka hai aur area mein teen model station banaye...
more...
ja rahe hain. Secretariat ke paas bane multi-modal transport hub mein station ke paas se hi bus aur auto ki suvidha milegi. Atal Nagar, Udyog Nagar aur Muktang ke paas bane station December 2024 tak banke taiyaar honge. Project, jo ki December 2022 mein pura hone wala tha, pandemic aur electrification ke liye railway se track access milne mein der ki wajah se delay ho gaya. Secretariat ke paas bana station 80% complete hai aur ismein shopping complex, integrated parking bus aur auto services ke saath, restaurants aur 250 meter lamba railway platform bhi hai. Project ki cost ₹52 crore se badhkar ₹100 crore ho gayi hai. Railway line Nava Raipur ke development mein kaafi impact daalega, jo ki isse Bilaspur, Raipur, Durg aur Bhilai jaise major cities se connect karega. Nava Raipur mein pehla station Atal Nagar ke paas, Mandir Hasaud se 2 km door hoga.
Rail News
28944 views
0

IR Affairs
SECR/South East Central
May 25 (12:03)   New Railway Station in Nava Raipur to Open Before Diwali, Connecting Key Cities

AdittyaaSharma^~   72978 news posts
Entry# 6075313   News Entry# 553598         Tags   Past Edits
read full article... CG News: नवा रायपुर में अगले महीने बन जाएगा रेलवे स्टेशन, दीवाली के पहले दौड़ेगी यात्री ट्रेन, ये होंगी विशेषताएं

A new railway station near the Ministry in Nava Raipur is expected to be completed by June, with train services from Raipur to Mandir Hasaud, Nava Raipur, and Kendri (Abhanpur) starting before Diwali. The 25 km railway track between Nava Raipur and Kendri has been laid, and three model stations are...
more...
being built in the Nava Raipur area. The station near the Ministry, part of a multi-modal transport (MMT) hub, will provide bus and auto connectivity. The project, initially planned for December 2022, was delayed due to the COVID-19 pandemic and issues with railway break-down availability. The new railway line will feature a shopping complex above the station, parking facilities for buses, autos, and taxis, entertainment options, restaurants, hotels, and cafes. The project cost has increased from 52 crores to 100 crores. The railway line is expected to be a significant turning point for Nava Raipur's development, connecting it to major cities like Bilaspur, Raipur, Durg, and Bhilai. The first station in Nava Raipur will be at Atal Nagar, located about 2 km from Mandir Hasaud.

Nava Raipur mein Ministry ke paas ek naya railway station June mein banke ready ho jaayega, aur Raipur se Mandir Hasaud, Nava Raipur aur Kendri (Abhanpur) tak train service Diwali se pehle shuru hone ki umeed hai. Nava Raipur aur Kendri ke beech 25 km railway track ban gaya hai, aur...
more...
Nava Raipur area mein teen model stations ban rahe hain. Ministry ke paas ban rahe multi-modal transport (MMT) hub mein station ke paas hi bus aur auto ki suvidha milegi. Project December 2022 mein complete hone wala tha, lekin COVID-19 pandemic aur railway break-down availability ki wajah se delay ho gaya. Naye railway line mein station ke upar ek shopping complex, parking facilities for buses, autos, taxis, entertainment options, restaurants, hotels aur cafes honge. Project ki cost 52 crore se badhkar 100 crore ho gayi hai. Railway line Nava Raipur ke development mein ek bada turning point banega, jisse Bilaspur, Raipur, Durg aur Bhilai jaise bada cities se connect karega. Nava Raipur mein pehla station Atal Nagar mein banega, jo Mandir Hasaud se lagabhag 2 km door hai.
Rail News
38342 views
0

IR Affairs
SECR/South East Central
May 08 (10:06)   Raipur Railway Plans Coaching Depot at Kendri Station for Improved Train Maintenance and Cleanliness

AdittyaaSharma^~   72978 news posts
Entry# 6056784   News Entry# 551387         Tags   Past Edits
read full article... Raipur: केंद्री में बनेगा रेलवे का कोचिंग डिपो, अब मरम्मत और रखरखाव के लिए दुर्ग-बिलासपुर नहीं ले जानी पड़ेंगी ट्रेनें

The South East Central Railway is planning to build a coaching depot at the Kendri station in Raipur to improve the cleanliness and maintenance of trains in the Raipur division. The depot is being planned because there is not enough space at the main Raipur station to park and clean the...
more...
trains. Currently, trains are maintained at Durg and Bilaspur depots. The coaching depot at Kendri will allow trains to be cleaned and maintained in a dedicated facility, improving the overall cleanliness of the trains. It will also allow trains to be dispatched directly to the Raipur station from Kendri, reducing travel time and benefiting passengers. The project is still in the planning stages, with a proposal being sent to the zonal headquarters for approval. Once approved, the construction will be expedited. The Naya Raipur station, which is part of this project, is expected to be operational in two years, as only 50% of the construction is complete. The project was initially planned to be completed by 2020 but faced delays due to funding issues and delays by the executing agency.

Raipur division ke trains ke saaf-safai aur marammat ke liye South East Central Railway, Raipur ke Kendri station pe ek coaching depot banane ki planning kar raha hai. Iska karan hai ki Raipur ke main station pe train ko park aur saaf karne ke liye jagah nahi hai. Abhi, trains ka...
more...
marammat aur maintenance Durg aur Bilaspur depots pe hota hai. Kendri pe coaching depot banne se trains ki saaf-safai aur behtar hogi. Isse trains ko sidha Kendri se Raipur station pe bheja ja sakega, jisse travel time kam hoga aur passengers ko fayda hoga. Project abhi planning stage me hai, aur zonal headquarters ko approval ke liye proposal bheja gaya hai. Approval milne ke baad construction jaldi shuru hoga. Naya Raipur station, jo is project ka part hai, do saal me operational hone ki ummid hai, kyunki sirf 50% construction pura hua hai. Project initially 2020 me complete hone wala tha, lekin funding issues aur executing agency ki late-lateefi ki wajah se delay ho gaya.

More Posts
Rail News
32974 views
0

IR Affairs
SECR/South East Central
Feb 02 (10:36)   Chhattisgarh Receives Significant Budget Boost for Railway Projects and Station Development

AdittyaaSharma^~   72978 news posts
Entry# 5959075   News Entry# 539734         Tags   Past Edits
read full article... Railway Budget 2024: छत्तीसगढ़ में चल रही रेल परियोजनाएं अब बजट की कमी के कारण नहीं अटकेंगी

The Indian Railway Minister, Ashwini Vaishnaw, announced the budget allocation for various railway zones across India via a video conference after the presentation of the interim budget. Chhattisgarh received a significant budget allocation of 6,896 crores, which is a significant increase from the previous year's allocation of 6,008 crores. This will...
more...
accelerate ongoing projects like the fourth railway line between Jharsuguda and Bilaspur, the doubling of lines, and the development of stations. 32 stations in the zone are being redeveloped under the Amrit Bharat Yojana, with 1,665 crores dedicated to this initiative. Major stations like Bilaspur, Raipur, and Durg are being planned to be upgraded with world-class facilities. The budget increase signifies a focus on expanding rail infrastructure and improving passenger facilities.

Interim budget aane ke baad, Central Railway Minister Ashwini Vaishnaw ne video conference ke through, saare Railway zones ko budget allocation ki jaankari di. Chhattisgarh ko 6,896 crore rupees ka budget mila, jo ki last saal ke 6,008 crore rupees se bahut zyada hai. Isse Jharsuguda aur Bilaspur ke beech fourth...
more...
railway line, double lines aur station development jaise projects tez honge. Zone ke 32 stations ko Amrit Bharat Yojana ke under 1,665 crore rupees se upgrad kiya ja raha hai. Bilaspur, Raipur aur Durg jaise bada stations world-class facilities se upgrad kiye jaayenge. Budget increase railway infrastructure aur passenger facilities ko improve karne pe focus dikhata hai.
Rail News
45383 views
0

IR Affairs
SECR/South East Central
Jan 18 (16:59)   Naya Raipur Railway Line Completed, Station Construction Underway, Train Services Expected by Diwali 2024

AdittyaaSharma^~   72978 news posts
Entry# 5945966   News Entry# 537993         Tags   Past Edits
read full article... नई सरकार के बाद एक बार फिर नवा रायपुर में रेल की उम्मीद बढ़ी, दीवाली तक चल सकती है ट्रेन

The railway has laid 21 kilometers of track in Naya Raipur, but the previous Congress government failed to construct a station during its five-year term, delaying train operations until 2023. However, the current BJP government has revived hopes for train services in Naya Raipur. The Naya Raipur Development Authority (NRDA) has...
more...
been instructed to expedite the construction of four railway stations: Atalnagar, Udyog Nagar, CBD, and Muktangam. The project includes a smart station and three regular stations, with construction 40-50% complete. The NRDA chief engineer expects train services to commence by Diwali 2024. The track is designed with long rail patches to minimize jerks during travel. The track was tested in February 2023, and the line can handle trains running at 120 kilometers per hour. Budgetary constraints and tender cancellations have been blamed for construction delays, which also hampered the planned inauguration before the state assembly elections. The 21-kilometer line from Naya Raipur to Mandir Hasaud was completed in October 2023. A survey has been conducted for running MEMU trains from Raipur to Kendri.

Naya Raipur mein railway ne 21 kilometer ka track bichiya hai, lekin Congress sarkar apna panch saal ka kaal mein station nahi bana payi, isse 2023 mein train chalne ka plan fail ho gaya. Ab BJP sarkar ke aane ke baad Naya Raipur mein train chalne ki umeed badh gayi hai....
more...
NRDA ko station banane ka kaam jaldi karne ka order mila hai. Atalnagar, Udyog Nagar, CBD, aur Muktangam - yeh char stations banae ja rahe hain. Ek smart station aur teen normal stations hain, jinka 40-50% kaam ho chuka hai. Diwali tak train chalne ki umeed hai. Track mein lamba rail patch use kiya gaya hai, isse train mein jhatke nahi ayenge. February 2023 mein track ki test hui thi, aur 120 km/h speed se train chalane ki permission mili hai. Budget ka issue aur tender cancel hone ki wajah se construction mein der ho gayi, isse election se pehle train start karne ka plan fail ho gaya. Naya Raipur se Mandir Hasaud tak 21 km line October 2023 mein complete ho gayi. Raipur se Kendri tak MEMU train chalane ka survey ho chuka hai.
Page#    Showing 6 to 10 of 65 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy