Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Jul 29 17:04:42 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

RMM/Rameswaram (5 PFs)
रामेश्वरम
இராமேஸ்வரம்


Track: Construction - Single-Line Electrification

Updated: Feb 11 (17:47)
Show ALL Trains
Railway Feeder Road, Rameswaram, Ramanathapuram - 623526.
State: Tamil Nadu

Elevation: 3 m above sea level
Type: Terminus   Category: NSG-3
Zone: SR/Southern   Division: Madurai


Number of Platforms: 5
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
3 Follows
Rating: 3.6/5 (142 votes)
cleanliness - good (19)
porters/escalators - average (17)
food - average (17)
transportation - good (18)
lodging - good (18)
railfanning - good (18)
sightseeing - excellent (18)
safety - good (17)
Show ALL Trains

Station Forum

Page#    Showing 11 to 15 of 596 blog entries  <<prev  next>>
General Travel
3832 views
0

Jul 22 (19:49)   RMM/Rameswaram (5 PFs)
deepak.yerr~
deepak.yerr~   6435 blog posts
Entry# 6133282            Tags  
Rameswaram Pamban new railway bridge Civil and mechanical works are completed and load test is conducted last week in presence of RB members and senior divisional officers of Madurai division. Came across thos picture in reels and it shows electrification wiring is pending.
Credits to original post owner.
Translate to English
Translate to Hindi
Day 6 Trip 8 : Journey to Chennai After memorable darshan of Maa Meenakshi & Rameshwaram Jyotirling Temple ✅😍🫡🚦🚥

7 Posts

FmtBlog
2352 views
2

Jul 20 (16:45)
JudgeSahab^~
JudgeSahab^~   39672 blog posts
Re# 6131137-8            Tags  
1 compliments
_/\_

4 pics

had great darshan at Rameshwaram Jyotirling @RMM: Rameswaram
Translate to English
Translate to Hindi

FmtBlog
2308 views
0

Jul 20 (16:48)
JudgeSahab^~
JudgeSahab^~   39672 blog posts
Re# 6131137-9            Tags  

28 pics

@RMM: Rameswaram Our Stay at Venkateshwara Hotel outside RMM railway station... highly impressed 👍
Translate to English
Translate to Hindi

More Posts
General Travel
129925 views
4

Jul 10 (20:58)   07356/Rameswaram - SSS Hubballi Special Fare Special (PT) | RMD/Ramanathapuram (3 PFs)
sivaprakashofficial^~
sivaprakashofficial^~   7396 blog posts
Entry# 6120668            Tags  
3 compliments
Useful Useful Useful
Two Unreserved Coaches Reduced in 07355 / 07356 SSS Hubballi - Rameswaram Weekly Special, Without Any Notification.
Now Running with 2 Unreserved Coaches Only.
In 07355 , Front 2 UR
In 07356 , Back 2 UR.
...
more...

Attached pic from Railmadad.

Translate to English
Translate to Hindi

More Posts
General Travel
40219 views
5

Jul 03 (08:46)   22674/Mannargudi - Bhagat ki Kothi SF Express (PT) | RMM/Rameswaram (5 PFs)
Annoying
Annoying   62 blog posts
Entry# 6112646            Tags  
IRTTC 2024 PROPOSALS OF NORTH WESTERN RAILWAY ZONE.

TRAINS TO BE EXTENDED/INTRODUCED IN SOUTHERN RAILWAY ZONE BY NORTH WESTERN RAILWAY ZONE ARE DISCUSSED BRIEFLY UNDER AS FOLLOWS:


Extensions:
...
more...

1. HSR CBE to TPJ not feasible due to insufficient lie-over time at CBE (only 2 hours left after Secondary Maintenance). Additionally Monsoon TT is also there for this train

2. SGNR TPJ to RMM is most feasible option let's see what is with Railway Board

3. BGKT MQ to RMM is feasible if the PM is shifted to BGKT (like the same situation of CDG MDU Exp zonal rake transfer), then sufficient time is available at RMM for SM

4. BME YPR to CBE is most feasible option let's see what is with railway board

5. SGNR NED to RMM i don't have idea because of long distance extension, so we need to consider the corridor block conditions (subjected to change per section) of the prescribed path.


New Services:
1. Hisar Chennai (SMR, BLDI)

2. Jodhpur Chennai (SDLP, DIA, DNA, SMR, BLDI)

Frequency Increase = JU MS weekly to Triweekly


So rameswaram got 3 more trains in NWR's proposal. Let's wait and watch...

Translate to English
Translate to Hindi

More Posts
General Travel
35990 views
7

Jun 06 (11:05)   RMD/Ramanathapuram (3 PFs)
sivaprakashofficial^~
sivaprakashofficial^~   7396 blog posts
Entry# 6086222            Tags  
Railway Electrification of Ramanathapuram - Rameswaram Stretch.
Translate to English
Translate to Hindi

More Posts
Page#    Showing 11 to 15 of 596 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy