Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 19:03:52 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 1019469-0

GUB/Gularbhoj (1 PFs)
गूलरभोज
گولربھوج

Track: Single Electric-Line

Gularbhoj railway station (GUB) is located in the Pipal Parao Range area of Gularbhoj, Udham Singh Nagar district, Uttarakhand. The station has a single platform and serves as a vital connection for local residents and travelers heading towards the foothills of the Himalayas. While amenities are limited, visitors can find basic refreshments and transportation options nearby.

Tourism

**Gularbhoj Temple:** A revered temple dedicated to the goddess Durga, attracting pilgrims from far and wide.
**Shree Hanuman Mandir:** A local temple dedicated to Lord Hanuman, known for its serene atmosphere.
**Baba Bhootnath Mandir:** A popular temple dedicated to a local deity, offering breathtaking views of the Himalayas.
**The Shiva Temple:** A quiet and peaceful temple dedicated to Lord Shiva, a perfect spot for meditation.
**The Gurudwara:** A Sikh place of worship, known for its welcoming atmosphere and religious significance.

Food

**The Dhaba:** Known for its traditional Indian vegetarian dishes and thalis.
**The Veggie Hut:** Offers a variety of vegetarian snacks, sandwiches, and juices.
**Shanti Sweets:** Specializes in delicious sweets and savories, perfect for a quick bite.
**The Green Leaf Cafe:** Serves healthy and flavorful vegetarian meals in a cozy setting.
**The Punjabi Dhaba:** Renowned for its flavorful vegetarian curries and breads.

Station Address

Pipal Parao Range, Gularbhoj, Distt - Udham Singh Nagar, 263401
State: Uttarakhand

Elevation: n/a
Type: Regular   Category: n/a
Zone: NER/North Eastern   Division: Izzatnagar


No Recent News for GUB/Gularbhoj
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 11
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 3.8/5 (20 votes)
cleanliness - excellent (3)
porters/escalators - average (2)
food - good (3)
transportation - poor (2)
lodging - poor (2)
railfanning - excellent (3)
sightseeing - excellent (3)
safety - excellent (2)

Station Forum

Page#    Showing 6 to 10 of 17 blog entries  <<prev  next>>
Info Update
82111 views
0

Sep 30 2022 (16:05)   KPV/Kashipur Junction (3 PFs)
sparshsinghal2110
sparshsinghal2110   650 blog posts
Entry# 5493909            Tags   Past Edits
Wap4 just departed kashipur with speed trial train for lalkuan.
Translate to English
Translate to Hindi
Info Update
136535 views
1

Sep 30 2022 (14:30)   KPV/Kashipur Junction (3 PFs)
sparshsinghal2110
sparshsinghal2110   650 blog posts
Entry# 5493708            Tags   Past Edits
#update
Today is the Trial of Kashipur - lalkuan electrifiction. if anybody is theer than can share the schedule of the same.
Translate to English
Translate to Hindi

More Posts
Info Update
57129 views
0

Sep 23 2022 (14:18)   KPV/Kashipur Junction (3 PFs)
sparshsinghal2110
sparshsinghal2110   650 blog posts
Entry# 5485201            Tags   Past Edits
#update3
Electrification progress on Lalkuan - kashipur route
Lalkuan - Gularbhoj outer :- Foundation work complete, Poles erected, brackets placed and wiring not done. I’m not update with the electrification of that area because of jungle area.
Gularbhoj outer - Kashipur outer :- Foundation work complete, Poles erected, brackets placed and wiring done.
Kashipur
...
more...
:- Foundation work complete, Poles erected, brackets placed and wiring done only at pf 2 and 3 finalising is going on.

Lalkuan - Kashipur route SSP details:-
Gularbhoj SSP completed
Bazpur SSP completed.
Kashipur SSP work has not started.

Note :-
I don’t know about the status of Lalkuan to Gularbhoj wether wiring has done or not. If anyone from that side can tell than update here about the status than all the work of electrification is completed in section.
Soon CRS and Eloco speed trial news can come from this section by this week.

Translate to English
Translate to Hindi
Info Update
33217 views
1

Sep 21 2022 (15:58)   KPV/Kashipur Junction (3 PFs)
sparshsinghal2110
sparshsinghal2110   650 blog posts
Entry# 5482949            Tags   Past Edits
#update2
Electrification progress on Lalkuan - kashipur route
Lalkuan - Gularbhoj outer :- Foundation work complete, Poles erected, brackets placed and wiring not done. I’m not update with the electrification of that area because of jungle area.
Gularbhoj outer - Kashipur outer :- Foundation work complete, Poles erected, brackets placed and wiring done.
Kashipur
...
more...
:- Foundation work complete, Poles erected, brackets placed and wiring not done.

Lalkuan - Kashipur route SSP details:-
Gularbhoj SSP completed
Bazpur SSP completed.
Kashipur SSP work has not started.

Note :-
I don’t know about the status of Lalkuan to Gularbhoj wether wiring has done or not l. If anyone from that side can tell than update here about the status than all the work of electrification is completed in this section

Translate to English
Translate to Hindi
Info Update
14092 views
1

Sep 20 2022 (13:42)   KPV/Kashipur Junction (3 PFs)
sparshsinghal2110
sparshsinghal2110   650 blog posts
Entry# 5481791            Tags   Past Edits
#update
Electrification progress on Lalkuan - kashipur route
Lalkuan - Gularbhoj outer :- Foundation work complete, Poles erected, brackets placed and wiring not done.
Gularbhoj outer - Kashipur outer :- Foundation work complete, Poles erected, brackets placed and wiring done.
Kashipur
...
more...
:- Foundation work complete, Poles erected, brackets placed and wiring not done.

Lalkuan - Kashipur route SSP details:-
Gularbhoj SSP completed
Bazpur SSP completed.
Kashipur SSP work has not started.

Note :-
I don’t know about the status of Lalkuan to Gularbhoj wether wiring has done or not l. If anyone from that side can tell than update here about the status test all the work of electrification is completed in this section

Translate to English
Translate to Hindi
Page#    Showing 6 to 10 of 17 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy