Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 6 16:08:55 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

TPNR/Transport Nagar (Lucknow) (3 PFs)
ट्रांसपोर्ट नगर
ٹرانسپورٹ نگر

Track: Double Electric-Line

Station Address

8/277, Rajni Khand, Sharda Nagar, Lucknow
State: Uttar Pradesh

Elevation: 127 m above sea level
Type: Regular   Category: n/a
Zone: NR/Northern   Division: Lucknow Charbagh NR


No Recent News for TPNR/Transport Nagar (Lucknow)
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 4.8/5 (6 votes)
cleanliness - good (1)
porters/escalators - n/a (0)
food - n/a (0)
transportation - excellent (1)
lodging - excellent (1)
railfanning - excellent (1)
sightseeing - excellent (1)
safety - excellent (1)

Station Forum

Page#    Showing 1 to 5 of 61 blog entries  next>>
Info Update
119537 views
3

Apr 30 (18:25)   TPNR/Transport Nagar (Lucknow) (3 PFs)
PrakharYadav^~
PrakharYadav^~   14705 blog posts
Entry# 6048927            Tags   Past Edits
1 compliments
Useful
उतरेटिया, मानकनगर ट्रांसपोर्टनगर पर बढ़ेंगे ट्रेनों के स्टॉपेज

चारबाग व जंक्शन पर लोड घटाने की है तैयारी

लखनऊ। चारबाग व लखनऊ जंक्शन पर ट्रेनों एवं यात्रियों के लोड को कम करने के लिए
...
more...
उतरेटिया, मानकनगर, ट्रांसपोर्टनगर स्टेशनों पर ट्रेनों के स्टॉपेज बढ़ाए जाएंगे।
चारबाग व लखनऊ जंक्शन पर करीब 210 से अधिक ट्रेनों व सवा लाख यात्रियों की रोजाना आवाजाही है। इससे चारबाग में जाम की स्थिति रहती है । यहां ट्रेनों व यात्रियों का लोड घटाने के लिए आसपास के स्टेशनों को अपग्रेड किया गया है। आलमनगर सेटेलाइट स्टेशन बन चुका है।

उतरेटिया व ट्रांसपोर्टनगर स्टेशन का विकास हो रहा है। ऐसे में इन स्टेशनों पर चारबाग आने वाली ट्रेनों के स्टॉपेज बढ़ाकर लोड घटाने की योजना है। रेलवे अधिकारी ट्रेनों की सूची तैयार कर रहे हैं कि वाराणसी, प्रयागराज, प्रतापगढ़, गोरखपुर रूट से आने वाली किन ट्रेनों के स्टॉपेज यहां किए जाएं। यह फैसला अगले दो महीने में होने की उम्मीद है। ऐसा होने से यात्रियों को खासी राहत हो जाएगी। (माई सिटी रिपोर्टर)

29 ट्रेनें बाईपास पर होंगी शिफ्ट
■ उतरेटिया से ट्रांसपोर्टनगर के बीच रेलवे प्रशासन ने वाईपास की डबलिंग की गई है। रेलवे अफसर 29 नॉन प्रीमियम ट्रेनों को इस बाईपास के जरिये चलाने की तैयारी कर रहे हैं। ऐसा होने पर इन ट्रेनों को चारबाग लाने की जरूरत नहीं होगी।

Amar Ujala LKO edition dated 30 Apr' 24

Translate to English
Translate to Hindi
General Travel
12910 views
0

Jun 20 (17:25)   TPNR/Transport Nagar (Lucknow) (3 PFs)
c21h30o2~
c21h30o2~   169 blog posts
Entry# 6101129            Tags  
Does anyone have an idea, what is the future of TPNR (Transport Nagar Railway Station)
Translate to English
Translate to Hindi
Rail News
10243 views
0

Metro
UPMRC/Lucknow Metro
Jun 03 (22:50)   UPMRC Saves Millions in Electricity Through Solar Energy and Energy Exchange Model

AdittyaaSharma^~   72978 news posts
Entry# 6084738   News Entry# 554675         Tags   Past Edits
read full article... मेट्रो ने सोलर ऊर्जा से डेढ़ वर्ष में बचाये साढ़े तीन करोड़

The Uttar Pradesh Metro Rail Corporation (UPMRC) has saved over 3.5 crore rupees in electricity over the past 18 months by using solar energy and an energy exchange model. This model allows UPMRC to save an average of 45 lakh rupees per month in energy costs. The Managing Director of UPMRC,...
more...
Sushil Kumar, stated that the metro is committed to environmental protection and is utilizing green corridors, water conservation, and energy sources for this purpose. The metro covers 65,000 square meters of greenery and has installed solar plants in various locations, including the Transport Nagar Metro Depot, five metro stations, and RSS buildings. These plants generate around 4 million units of electricity annually. The metro purchases its electricity through an open access model from the Indian Energy Exchange (IEX), with prices determined every 15 minutes for each 24-hour block.

UPMRC ne solar energy aur energy exchange model ka use karke last 18 months mein 3.5 crore rupees se zyada electricity bachaayi hai. Is model se, UPMRC ek mahine mein average 45 lakh rupees ki energy bacha raha hai. UPMRC ke Managing Director, Sushil Kumar ne kaha ki metro environment protection...
more...
ke liye committed hai aur green corridors, water conservation, aur energy sources use kar raha hai. Metro 65,000 square meters ki greenery cover karta hai aur different locations mein solar plants lagaaye hain, jaise ki Transport Nagar Metro Depot, panch metro stations, aur RSS buildings. Ye plants har saal 4 million units electricity generate karte hain. Metro open access model ke through Indian Energy Exchange (IEX) se electricity kharidi hai, jisme prices har 15 minute mein 24 hour block ke liye decide ki jati hain.
Rail News
18097 views
1

IR Affairs
NR/Northern
May 31 (20:07)   DRM Inspects Ajgain and Transport Nagar Stations to Ensure Safe Train Operations During Summer Heat

Exynos9611~   18602 news posts
Entry# 6080922   News Entry# 554283         Tags   Past Edits
read full article... डीआरएम ने गर्मी में रेल कर्मचारियों का हौसला बढ़ाया

The DRM of the North Railway Lucknow Division, Sachindra Mohan Sharma, conducted an inspection of Ajgain and Transport Nagar railway stations on Thursday night to ensure safe and efficient train operations during the scorching heat. He provided safety and security instructions to the railway staff and also listened to their concerns....
more...
Senior DCM Rekha Sharma explained that the inspection was part of a measure to ensure safe and protected train operations during the intense summer heat, with a focus on passenger and staff welfare. The DRM spoke with the train guards, loco pilots, and assistant loco pilots, boosting their morale and urging them to remain alert and cautious for safe and secure rail operations during the summer.

North Railway Lucknow Division ke DRM Sachindra Mohan Sharma ne Thursday raat Ajgain aur Transport Nagar railway station ka inspection kiya, yeh bhiषण गर्मी mein train operations safe aur efficient ho, iske liye. Unhone railway staff ko safety aur security ke instructions diye aur unki problems bhi suni. Senior DCM Rekha...
more...
Sharma ne bataya ki yeh inspection intense summer heat mein safe aur protected train operations ensure karne ke liye kiya gaya, passenger aur staff welfare pe focus ke saath. DRM ne train guards, loco pilots aur assistant loco pilots se baat ki, unka haunsla badhaya aur unhe summer mein safe aur secure rail operations ke liye alert aur cautious rehne ka instruction diya.
Rail News
27526 views
0

IR Affairs
NR/Northern
Apr 28 (23:19)   Indian Railways to Reduce Congestion at Lucknow Stations

AdittyaaSharma^~   72978 news posts
Entry# 6047224   News Entry# 550237         Tags   Past Edits
read full article... चारबाग में जाम से बचने 29 ट्रेनें उतरेटिया बाईपास पर शिफ्ट होंगी

The Indian Railways is taking steps to reduce congestion at Charbagh and Lucknow Junction railway stations in Lucknow. To alleviate traffic congestion in the city, the railways plans to increase the number of train stops at nearby stations like Utretia, Manaknagar, and Transportnagar. Additionally, 29 non-premium trains will be diverted to...
more...
a bypass track, eliminating the need for them to stop at Charbagh. These initiatives are aimed at reducing the passenger load at the main stations, which currently handle over 150 trains and over 125,000 passengers daily. The railway officials are finalizing a list of trains on the Varanasi, Prayagraj, Pratapgarh, and Gorakhpur routes that will be rerouted, with the changes expected to be implemented within the next two months. This plan is part of a larger effort to upgrade nearby stations, including the recently completed Alamnagar satellite station and the upcoming completion of Utretia and Transportnagar stations.

Lucknow ke Charbagh aur Lucknow Junction railway stations pe traffic jam kam karne ke liye, Indian Railways bada action le raha hai. Charbagh aur Lucknow Junction pe train aur passengers ka load kam karne ke liye, Utretia, Manaknagar aur Transportnagar jaise stations pe train stoppage badhaye jaayenge. Iske saath...
more...
hi, 29 non-premium trains ko bypass track pe shift kiya jaayega, jisse Charbagh pe unka stop nahi hoga. Ye sab karke, railway stations pe load kam karne ki koshish ki ja rahi hai, kyunki abhi har din 150 se zyada trains aur 125,000 se zyada passengers aate hain. Varanasi, Prayagraj, Pratapgarh aur Gorakhpur route se aane wali trains ko kaunsi station pe stop dene hai, iski list railway officials bana rahe hain, aur ye next two months mein final ho jaayegi. Iske alawa, Alamnagar satellite station already ban chuka hai aur Utretia aur Transportnagar stations bhi jaldi hi complete hone wale hain.
Page#    Showing 1 to 5 of 61 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy