Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Wed Oct 16 16:56:23 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

JPQ/Jhapandanga (3 PFs)
झापानडांगा
ঝাপানডাঙ্গা

Track: Triple Electric-Line

Jhapandanga railway station (JPQ) is situated in Abujhati Gram Panchayat, Purba Bardhaman district of West Bengal. The station boasts 3 platforms and is well-connected to major cities in the region. While basic amenities like waiting rooms and restrooms are available, the station is primarily known for its charming rural setting and peaceful atmosphere.

Tourism

The 'Jhapandanga Kali Temple' is a revered temple dedicated to Goddess Kali.
The 'Sri Ram Mandir' is a popular Hindu temple dedicated to Lord Rama.
The 'Masjid-e-Azam' is a historic mosque with beautiful architecture.
The 'Durga Mandir' is known for its vibrant Durga Puja celebrations.
The 'Shiva Temple' is a peaceful temple dedicated to Lord Shiva.

Food

The 'Shanti Restaurant' is popular for its delicious vegetarian thalis and snacks.
The 'Annapurna Bhojanalay' offers a wide variety of vegetarian dishes at reasonable prices.
The 'Chaat Corner' serves tasty chaat items, samosas, and other street food.
The 'Biryani House' offers vegetarian biryani and other rice dishes.
The 'Dosa Point' is known for its crispy dosas and south Indian delicacies.

Station Address

Abujhati Gram Panchayet, Dist - Purba Bardhaman
State: West Bengal

Elevation: 21 m above sea level
Type: Regular   Category: n/a
Zone: ER/Eastern   Division: Howrah


No Recent News for JPQ/Jhapandanga
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station Forum

Page#    Showing 16 to 20 of 69 blog entries  <<prev  next>>
Rail Fanning
173213 views
13

★★
Mar 06 2020 (00:35)   BWN/Barddhaman Junction (8 PFs) | HWH/WAP-7/30494
SAPTARSHI^~
SAPTARSHI^~   26796 blog posts
Entry# 4584953            Tags   Past Edits
GM's Annual Inspection of Khana-Howrah section of Howrah division.
.
💠All u need to know about " GM's Inspection "
This is my first experience of live GM's Inspection of a "section" (Previously, I had an experience of GM Inspection of Loco shed). So before I share my experience, u need to know a little basics.
...
more...
GM's Annual Inspection in ER takes place generally during December-March period.
•GM inspects a section of every division (HWH, SDAH, ASN & MLDT). He may also inspect any Carshed, Loco Shed, Workshop, Hospital, Museum, Coaching yard, etc.
•Senior divisional officers propose to GM for visiting any section of their division / Hospital / working place.
•A tentative schedule is chalked out. Atleast 8-10 months ahead, it is decided which section/ place GM shall visit. Developments are made in that way.
•GM usually inspects according to a pre-planned schedule of things (like TRD depot, station building, railway colony, RRI, running room, food plaza, bridge, curve, etc.)
.
💠Now,I am only aware & interested about GM Inspection in HWH & SDAH divisions. Taking live experience of Inspection at SDAH div is Not possible by me, as every year, GM's Inspection occur at MID-NIGHT at SDAH division (This happens to get a free path for the train, which may stop anywhere, take speed trials & there is no EMU blocking the path/path of EMU being blocked)
.
•GM is supposed to be the most important person of a Railway zone & GM's Inspection is a very very serious event
•It is not that only GM inspects everything, lots of higher officers also inspect along with him.
•Every department should make everything proper. Everything means everything. GM can stop anywhere, inspect anything on his path. He may not always follow the pre-determined "stoppages of visit" , but will definitely follow the "scheduled route". So upgradation of "everything" occurs only the stations/buildings,etc lying in his path where he is supposed to inspect, NOT the whole division.
•The station building, platforms, tracks are cleaned & painted from top to bottom. No dirt should be there. Water taps should be running. Enough lights should be provided. Seating arrangement & sheds should be appropriate.
•No plastic & waste should be along the tracks. Railways burn them down. All unwanted plants & bushes are cleared out.
•Tracks, switches, points, joints, guard rails should be painted, in different colors. Each color has a meaning ( which we Railfans can't identify without manual)
•Tracks should be smooth. Engineering department needs to ensure GM's train should not get any bumpy ride.
•Every sign board, indicator should be in proper order.
•GM's train should be provided the highest priority. A relief engine should run after GM's train or run attached to GM's train for emergency in case the leading loco fails.
•GM's train may have any instrument or track recording equipment in it. Every officer should prepare a project report related to his department/team & show it to GM on demand, any time
•GM generally takes Speed trial in a stretch of his alloted section.
•GM generally inaugurates atleast 1 project during his Inspection (it may be children's park, seating area, water cooler, waiting hall, running room, any technological equipment, etc)
•GM also interacts with field staffs & other staffs. They should be ready for any question.
•Now u will compare, what of the above "expected items of Inspection" actually happened.
.
.
💠Now lets come to the topic, "GM's Annual Inspection over KAN (incl.) - BWN - HWH via-HBC (120 Kms.)
•U can get from the heading, the Inspection is to start from Khana & come to Howrah (not the opposite)
•Shri Suneet Sharma, GM/ER's train left Howrah at 07:45 powered by 30494 WAP7 (at DLI end) & idle 30557 WAP7 (at HWH end ) [Picture provided]. It is a long train with many coaches with atleast 100 officers,staffs,security travelling along. Shri Ishaq Khan,DRM/HWH was along.
•The train reached Khana PF1A at 09:30. GM inspected Khana station, Point No.60A,Curve No.11 & LC-60/T/Spl. His train went to the next station, Jhapater Dhal for train reversal after dropping him at Khana. 30494 detached there. 30557 was now leading loco. 30494 was the reliever loco, and followed the GM's train till Howrah. The train came back to Khana & started at 09:55 to Barddhaman with GM & others.
.
•The train arrived Barddhaman PF5 at 10:08 (2 mins ahead of TT). GM got down & was greeted by officers. A lot of officers & security staff got down. GM went to the FOB to PF1, inspected the Crew lobby. BA test was shown & other items was displayed to him. He then inspected the waiting hall, food stalls, running room,health unit,RRI.
•Meanwhile, his team of senior officers started inspecting themselves, water taps, FOB, cleanliness of parked trains, functioning of display boards, escalators, water coolers, toilets, etc.
The team was just like surveying,with pen & papers, noting everything in an autonomous manner.
•On the other hand, GM visited the renovated station building, a part of which colasped in First week of January. He had a press conference & went straight to the Diesel Shed.
•He inspected the diesel shed & its sections. DLS/BWN was celebrating its Golden Jubilee (1970-2020). The DLS was officially converted to DLS cum ELS by GM, by flagging off First Electric Locomotive of DLS/BWN named "KAVIGURU". It is a WAG9 & is also the First Comissioned 3ph Goods Loco of ER.
•GM then inspected the RPF barrack, Loco Colony & inaugurated a Children Park
•After all these, his train left Barddhaman at 13:00.
.
•His train stopped at LC-47/E for Inspection at 13:08. He also interacted with Gang No.4. The train left at 13:25.
.
•He conducted a speed trial on 33Km. stretch between Palla Road & Belmuri.
.
•He arrived at Belmuri at 13:40. After lunch break, he again started his Inspection. He & other officers visited the Railway colony, interacted with the dewllers, inaugurated a Reading room & Yoga room. He inspected Belmuri station & TRD depot.
His train left Belmuri at 15:25
.
•His train arrived Chandanpur at 15:35. He inspected the Julka river bridge and also inspected the under construction brigde for 4th line. He left at 15:55
.
GM's train arrived Dankuni at 16:10. He inspected the station & RRI. His train left for Howrah at 16:50
.
GM arrived Howrah at 17:10. He inaugurated a Stimulator Room at Howrah.
.
This is how, GM Inspection is carried out.
.
.
💠Now, one may think, what is the purpose of such Inspection?
•GM ensures every division is working properly and providing amenities to passengers through this Inspection.
•The section which GM inspects gets hugely developed for his Inspection.From tracks to stations everything is renovated! As u know, he may stop wherever he wishes.
•I remember HBC had TSRs imposed over various places,rails & sleepers being changed, etc. from 7-8 months ago. These were indications that the section shall have GM Inspection.
💠The most important drawback of this Inspection is -- GM does not inspect PUNCTUALITY of running trains during this Inspection.
•The Inspection is like an eye wash to the GM, but his team of officers independently check the passenger amenities in more detailed way.
•GM rarely interacts with Passengers during his Inspection as he has very tight schedule
•U will find station staffs extremely helpful & well dressed this day, this is no lesser than an Annual Function being held. Even I was surprised by the extremely helpful behaviour of the RPF... as if the tea had excessive sweetness that day.
.
Date: 04.03.20

#lightgoods #LGspl

Translate to English
Translate to Hindi
Rail Fanning
38355 views
9

Mar 08 2020 (16:31)   12042/New Jalpaiguri - Howrah Shatabdi Express | JPQ/Jhapandanga (3 PFs) | HWH/WAP-7/39111
SAPTARSHI^~
SAPTARSHI^~   26796 blog posts
Entry# 4587508            Tags   Past Edits
12024 Patna - Howrah Janshatabdi Express & 12042 New Jalpaiguri - Howrah Shatabdi Express passing Jhapandanga powered by Pushpull enabled WAP7s
Translate to English
Translate to Hindi
General Travel
152737 views
0

Jan 08 2020 (09:50)   36830/Barddhaman - Howrah Chord Line Super Local | BLAE/Balarambati (4 PFs)
SAPTARSHI^~
SAPTARSHI^~   26796 blog posts
Entry# 4534307            Tags  
Due to All India Bandh/Strike & obstruction at different places & subsequent non-availability of rake, Chord Line Super was made "All Stop" today. It faced an Overtake by Dn Asansol Sealdah Intercity Express at Belmuri.
•The other trains diverted via-HBC Line were Up Bhagalpur Kaviguru Express, Up Howrah Prantik Siuri Express, Dn Rajgir Howrah Passenger #emuER
Translate to English
Translate to Hindi
Rail Fanning
14536 views
4

Apr 27 2019 (12:34)   12317/Akal Takht Express (PT) | JPQ/Jhapandanga (3 PFs)
Arindam~
Arindam~   181 blog posts
Entry# 4302894            Tags  
A summer morning show with LHB's,Alco,Rajdhanis- The variety of trains spotted were-
12314 NewDelhi Sealdah Rajdhani Express with HWH WAP7#30529
12317 Kolkata Amritsar Akal Takht Express with HWH WAP4#22289
13006 Amritsar Howrah Mail with MGS WAP4
12381
...
more...
Howrah NewDelhi Poorva Express with HWH WAP7 #30492
12340 Dhanbad Howrah Coalfield Express with HWH WAP7#30295
BWN WDM3A with Varanasi Sealdah Upper India Express
12302 NewDelhi Howrah Rajdhani Express with HWH WAP7#30525
Location- Jhapandanga along Howrah Burdwan Chord section of Eastern Railways.

Translate to English
Translate to Hindi
Rail Fanning
131268 views
10

Feb 27 2019 (17:37)   KQU/Kamarkundu (5 PFs) | TATA/WAG-9/31476
SAPTARSHI^~
SAPTARSHI^~   26796 blog posts
Entry# 4244045            Tags   Past Edits
#MetroRailwayKolkata
#MetroKamarkunduStation
➡️The 5th ICF-Medha Metro Rake which is glitch-free compared to the previous ones.
➡️After hours of waiting,it was possible to get this train passing through Chord line after traffic load was minimised (Date-26/02/19; Time-21:51 Hrs.)
➡️Watch
...
more...
the metro smoothly passing the night stations.
➡️Other pics taken at BARN loop (Date-27/02/19)
➡️Link for 3rd rake capture /blog/post/3353459
#mymemories #lifetimecapture

Translate to English
Translate to Hindi

More Posts
Page#    Showing 16 to 20 of 69 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy