Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 6 19:16:54 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

SAGOR/Sagore
सागौर

Track: Construction - New Line

Updated: Apr 02 2020 (20:44) by Jayashree^

Station Address

Sagore , Dist. - Dhar
State: Madhya Pradesh

Elevation: 546 m above sea level
Type: Regular   Category: n/a
Zone: WR/Western   Division: Ratlam


No Recent News for SAGOR/Sagore
Nearby Stations in the News
Number of Platforms: n/a
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 3.8/5 (8 votes)
cleanliness - good (1)
porters/escalators - good (1)
food - good (1)
transportation - good (1)
lodging - good (1)
railfanning - good (1)
sightseeing - good (1)
safety - good (1)

Station Forum

Page#    Showing 1 to 5 of 6 blog entries  next>>
Rail News
28730 views
1

IR Affairs
WR/Western
Jun 23 (12:15)   Indore-Dahod Railway Line Project Nears Completion with Tunnel Blast

AdittyaaSharma^~   72978 news posts
Entry# 6103762   News Entry# 557353         Tags   Past Edits
read full article... Indore Dahod Railway Line: सुरंग के अंदर हुआ एक ब्लास्ट इंदौर-दाहोद रेल लाइन की राह कर देगा आसान

The Indore-Dahod railway line project is nearing completion, with the Indore-Dhar section expected to be finished soon. The 2.9 km long tunnel near Pithampur is almost complete, with only 2.5 meters remaining. The remaining portion will be blasted on Sunday, connecting the two portals of the tunnel. This will pave the...
more...
way for laying tracks and connecting Indore to Dhar by December. The project, which began in 2013, aims to connect Indore to Dahod via 22 railway stations. The project has seen significant progress, with the track laying completed on the Pithampur-Sagour section (9.3 km) and new railway stations being constructed in Sagour, Gunawad, Naugaon, Jhabua, and Pitol. The tunnel construction was particularly challenging due to the presence of hard rock and the emergence of a population in the area after the survey. The project encountered delays due to water removal and blasting permissions. A total of 1200 blasts were conducted to remove 234,000 cubic meters of rock, with 200 personnel working daily. The project has utilized 300 tons of explosives and various machines, including boomers, shotcrete machines, and telehandlers. To overcome the challenge of water ingress, 10 million liters of water were pumped out of the tunnel.

Indore-Dahod railway line project ka kaam jaldi hi khatam hone wala hai. Indore se Dhar tak ka section jaldi hi complete ho jaayega. Pithampur ke paas 2.9 km lambi tunnel almost ready hai, bas 2.5 meter bacha hai. Sunday ko baki ka portion blast kiya jaayega, jisse tunnel ke dono portal...
more...
ek doosre se jude jaayenge. Isse track laying ka rasta khul jaayega aur December tak Indore se Dhar tak rail connect ho jaayega. 2013 mein shuru hua yeh project Indore se Dahod tak 22 railway stations ko connect karega. Project mein kaafi progress hua hai. Pithampur-Sagour section (9.3 km) mein track laying khatam ho chuka hai, aur Sagour, Gunawad, Naugaon, Jhabua, aur Pitol mein naye railway stations ban rahe hain. Tunnel ka construction bahut mushkil tha kyunki hard rock tha aur survey ke baad area mein aabadi aa gayi. Project mein water removal aur blasting permissions ki wajah se delay aaya. 234,000 cubic meter rock ko hataane ke liye 1200 blasts hue, aur har din 200 log kaam karte the. Project mein 300 ton explosives aur boomers, shotcrete machines, telehandlers jaise machines ka use hua. Tunnel mein paani aaane ki problem ko dur karne ke liye, 10 million litre paani ko pump karke bahar nikala gaya.

More Posts
General Travel
59142 views
0

Apr 22 (22:26)   INDB/Indore Junction (6 PFs)
SGRFC^~
SGRFC^~   2699 blog posts
Entry# 6040399            Tags   Past Edits
See this video ,how Railways are taking this project casually
Translate to English
Translate to Hindi
General Travel
12835 views
1

Apr 05 (09:17)   PTMPR/Pithampur
guest
Entry# 6019726            Tags   Past Edits
1 compliments
Great
Pithampur sagor railway line completed
Translate to English
Translate to Hindi
Rail News
32538 views
1

IR Affairs
WR/Western
Jan 11 (10:55)   अंडर पास बनाने का ग्रामीण कर रहे विरोध, एक माह से रुका है काम

SmallTownTraveller^~   5779 news posts
Entry# 5938478   News Entry# 537128         Tags   Past Edits
धार | जिले में इंदौर-दाहोद रेल परियोजना का कार्य तेज गति से चल रहा है लेकिन पीथमपुर तहसील के ग्राम खेड़ा और जामोदी के ग्रामीणों द्वारा...
read full article... अंडर पास बनाने का ग्रामीण कर रहे विरोध, एक माह से रुका है काम
General Travel
166715 views
1

Dec 03 2023 (21:42)   TIHI/Tihi (1 PFs)
guest
Entry# 5900612            Tags   Past Edits
इंदौर-दाहोद वाया धार-झाबुआ नई लाइन के निर्माण कार्य के तहत टनल निर्माण एवम टनल में जलियाँ लगाने का कार्य आधुनिक मशीनों के द्वारा तीव्र गति से किया जा रहा है।
Translate to English
Translate to Hindi

More Posts
Page#    Showing 1 to 5 of 6 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy