Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Aug 3 21:18:54 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

BKN/Bikaner Junction (6 PFs)
बीकानेर जंक्शन


Track: Single Electric-Line

Updated: Mar 10 2023 (08:38)
Show ALL Trains
Junction Point for PLCJ/SOG/MTD/RTGH, PH No. 0151-2523131/2523132/2523134, Station Road, Bikaner. Pincode - 334001.
State: Rajasthan

Elevation: n/a
Type: Junction   Category: NSG-3
Zone: NWR/North Western   Division: Bikaner


No Recent News for BKN/Bikaner Junction
Nearby Stations in the News
Number of Platforms: 6
Number of Halting Trains: 40
Number of Originating Trains: 24
Number of Terminating Trains: 24
2 Follows
Rating: 4.1/5 (121 votes)
cleanliness - excellent (16)
porters/escalators - good (14)
food - good (16)
transportation - good (16)
lodging - good (13)
railfanning - good (14)
sightseeing - excellent (16)
safety - good (16)
Show ALL Trains

Station Forum

Page#    Showing 1 to 5 of 1253 blog entries  next>>
Info Update
12509 views
0

Yesterday (13:23)   14717/Bikaner - Haridwar Express | BKN/Bikaner Junction (6 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   521 blog posts
Entry# 6143766            Tags   Past Edits
Railways should make rsa or rake sharing arrangements between 14707/08 Lalgarh (Bikaner) Dadar Western Ranakpur express and 14717/18 Bikaner Haridwar gita ganga express and should also give 2 lhb rakes to 14717/18 to make it daily between Bikaner and Haridwar and after doing rake sharing arrangements or rsa of both trains railways should do primary maintenance of 5 lhb rakes (3 lhb rakes of 14707/08 and 2 lhb rakes of 14717/18) at Lalgarh jn and rsa pattern of both trains should be like this 14717-14718-14708-14707 then primary maintenance at Lalgarh jn. And for speeded up time table of both trains please refer to these blogs -

...
more...
(6031458 , 6031428) ranakpur express, (6023738, 6023737) gita ganga express. Or refer to the links given below.

/train/224818

/train/224820

/train/225349

/train/225346

Translate to English
Translate to Hindi
Info Update
80047 views
1

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   521 blog posts
Entry# 6143019            Tags   Past Edits
1 compliments
Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that i can save my post from getting archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can get see that whether this coach composition for train sets will become a successful idea or will become waste idea.

Translate to English
Translate to Hindi

More Posts
Info Update
13342 views
3

Jul 30 (20:26)   22497/Shri Ganganagar - Tiruchchirappalli Humsafar Express | BKN/Bikaner Junction (6 PFs)
debjitkarmakar8492
debjitkarmakar8492   60 blog posts
Entry# 6140873            Tags  
Update the locomotive this train runs with electric locomotive between bikaner and pune.Video is given as proof
Translate to English
Translate to Hindi

More Posts
Info Update
6528 views
1

Jul 30 (19:59)   22474/Bandra Terminus - Bikaner SF Express (PT) | BKN/Bikaner Junction (6 PFs)
debjitkarmakar8492
debjitkarmakar8492   60 blog posts
Entry# 6140828            Tags  
Update the locomotive of this train. This train runs end to end with electric loco. This video is given as proof.
Translate to English
Translate to Hindi

More Posts
Info Update
29060 views
1

Jul 29 (09:09)   12463/Delhi Sarai Rohilla - Jodhpur Rajasthan Sampark Kranti Express | BKN/Bikaner Junction (6 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   521 blog posts
Entry# 6139252            Tags   Past Edits
In my opinion railways should permanently cancel 22463/64 Bikaner Delhi Sarai Rohilla express and should also cancel 12463/64 Jodhpur Delhi Sarai Rohilla express and should give rake of this train to Northern Railway division to make 14713/14 Delhi Sarai Rohilla Sikar Express daily instead of bi weekly between Sikar and Delhi Sarai Rohilla and railways should also extend 14713/14 upto Ringas jn and should run this train as 14713/14 Delhi Sarai Rohilla Ringas Intercity express and this train will only need bi weekly or tri weekly primary maintenance at Delhi Sarai Rohilla and for further information refer to these blogs- 6023339 , 6023632
Translate to English
Translate to Hindi

More Posts
Page#    Showing 1 to 5 of 1253 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy