Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 07:52:06 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 1396332-0

UNA/Una (1 PFs)
ऊना
ઉના

Track: Metre Gauge

Updated: Oct 26 2023 (18:44) by Padmakant

Station Address

NH 8E, Una
State: Gujarat

Elevation: 28 m above sea level
Type: Regular   Category: NSG-6
Zone: WR/Western   Division: Bhavnagar Para


No Recent News for UNA/Una
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 4
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station Forum

Page#    Showing 1 to 5 of 28 blog entries  next>>
Rail News
14974 views
0

IR Affairs
NR/Northern
May 16 (19:50)   Una Railway Station Loop Line Construction Progress Slow, Completion Uncertain

SmallTownTraveller^~   5779 news posts
Entry# 6066012   News Entry# 552467         Tags   Past Edits
read full article... Una News: ऊना रेलवे स्टेशन पर लूप लाइन का कार्य कछुआ गति से चल रहा

The construction of the third line and loop line at Una railway station is progressing slowly. The target for completion of the loop line, crucial for crossing of a third train when two trains are already present, was set for May. However, the current pace of work makes it uncertain if...
more...
the project will be finished by the end of the month. Electrification work between the platforms is underway, with teams installing cables for signals, gates, and points. The laying of the third line will begin after the installation of these signal equipment, which may take another two months. The loop line was proposed by the Railway Board two and a half years ago, but the delay in completion suggests it will be delayed again. The DRM, Ambala, assures that the signal and electrification work is progressing and the line laying will start soon. The loop line will be available to passengers soon.

Una railway station pe teesri aur loop line ka kaam bahut slow chal raha hai. Do train aane pe teesri train crossing ke liye bohot zaroori loop line ka kaam May maah tak complete karne ka lakshya tha, lekin kaam ka speed dekhte hue yeh nahin lag raha ki woh May...
more...
maah ke end tak complete ho paayega. Platforms ke beech electrification ka kaam chal raha hai, aur teams signals, gates, aur points ke liye wires laga rahi hai. In sab signal equipment lagne ke baad teesri line lay karne ka kaam shuru hoga, aur isme aur do maah lag sakte hain. Loop line ko Railway Board ne do saal pehle propose kiya tha, lekin uski delay se completion dekhte hue yeh lag raha hai ki woh fir se late hoga. Ambala ke DRM ne bataya ki signal aur electrification ka kaam chal raha hai aur line lay karne ka kaam jaldi shuru hoga. Loop line jaldi passengers ke liye available hogi.
Rail News
21710 views
1

Mar 03 (13:59)   Direct Train Connection Between Una and Indore Announced

scsharma1986   3207 news posts
Entry# 5985701   News Entry# 543691         Tags   Past Edits
read full article... ऊना से इंदौर तक ट्रेन सुविधा की हुई घोषणा : सुमीत

The Indian Railways has approved the extension of the Indore-Chandigarh Express train to Una, Himachal Pradesh, providing a direct train connection between Una and Indore. The train will operate as the Indore-Chandigarh Express (train number 19307/08), departing Indore at 5:30 am and arriving in Una at 8:35 am. The return journey...
more...
will depart Una at 1:50 pm and arrive in Indore at 3:05 pm the next day. This new service will benefit the residents of Una, especially those working in the Indian Army and paramilitary forces, by providing a direct train connection to major cities. The announcement was made by BJP state secretary Sumit Sharma, who attributed the achievement to the efforts of Union Minister Anurag Thakur.

Indian Railways ne Una, Himachal Pradesh tak Indore-Chandigarh Express train ko extend karne ki approval de di hai, isse Una aur Indore ke beech direct train connection mil gaya hai. Train Indore-Chandigarh Express (train number 19307/08) ke roop mein chalegi, aur Indore se subah 5:30 am par chalegi aur Una mein...
more...
8:35 am par pahunchegi. Return journey Una se dopahar 1:50 pm par chalegi aur agle din dopahar 3:05 pm par Indore pahunchegi. Yeh new service Una ke residents ko benefit degi, khass kar unko jo Indian Army aur paramilitary forces mein kaam karte hain, kyunki isse unko major cities tak direct train connection milega. Ye announcement BJP state secretary Sumit Sharma ne kiya, aur unhone is achievement ka credit Union Minister Anurag Thakur ke efforts ko diya.
Rail News
12081 views
0

Feb 28 (21:24)   Una-Saharanpur Train Extended to Haridwar, Travel Time Reduced to 7 Hours

scsharma1986   3207 news posts
Entry# 5982034   News Entry# 543281         Tags   Past Edits
read full article... ऊना से हरिद्वार जाने वाली ट्रेन की समयसारिणी जारी

A train currently running from Una to Saharanpur will be extended to Haridwar, taking around 7 hours to complete the journey. Starting from Una at 1:50 PM, the train will arrive in Haridwar around 9:00 PM and depart at 4:00 AM for its return trip to Una. It will pass...
more...
through Sirhind, Ambala, and Jagadhri on its way to Haridwar. The train’s timetable from Una to Saharanpur remains unchanged, although the train will now travel to Haridwar before returning to Saharanpur. The extension to Haridwar was approved by Railway Minister Ashwini Vaishnaw at the request of Union Minister Anurag Thakur.

Una se Haridwar tak chalne wali train ka time table aagaya hai. Ab yah train 7 ghante mein Haridwar pahunch jayegi. Una se 1:50 PM par chalne wali train Haridwar raat 9:00 PM tak pahunch jayegi aur subah 4:00 AM par Una ke liye vapasi karegi. Is train ka sirhind, ambala...
more...
aur jagadhri se hokar guzarna hai. Una se Saharanpur tak ka time table wahi hai, halanki train ab Haridwar tak jayegi aur phir Saharanpur vapas aayegi. Railway Minister Ashwini Vaishnaw ne Union Minister Anurag Thakur ke request par yeh Haridwar extension approve kiya hai.
Rail News
25906 views
0

New Facilities/Technology
NR/Northern
Feb 24 (08:48)   Una Himachal-Saharanpur MEMU Train Extended to Haridwar, Rs 1838 Crore Approved for Railway Expansion in Himachal Pradesh

karbang~   1795 news posts
Entry# 5977693   News Entry# 542625         Tags   Past Edits
read full article... Good News For Travelers, Himachal Pradesh to Haridwar Direct Train To Start Soon

Union Minister Anurag Thakur announced the extension of the Una Himachal-Saharanpur MEMU train to Haridwar, which will benefit passengers traveling to the religious destination. This decision comes with the approval of Rs 1838 crore for railway expansion in Himachal Pradesh for the financial year 2023-24. The government is also investing in...
more...
other railway projects in the state, including the Bhanupalli-Bilaspur-Beri railway line, Chandigarh-Baddi railway line, and Nangal-Talwara railway line.

Union Minister Anurag Thakur ne Una Himachal se Saharanpur tak chalne wali MEMU train ko Haridwar tak badhaane ka announcement kiya hai, jisse religious destination tak jaane wale passengers ko faayda hoga. Is decision ke saath, Himachal Pradesh mein railway expansion ke liye financial year 2023-24 ke liye Rs 1838 crore...
more...
approve kiya gaya hai. Government state mein aur bhi railway projects mein investment kar raha hai, jaise ki Bhanupalli-Bilaspur-Beri railway line, Chandigarh-Baddi railway line, aur Nangal-Talwara railway line.

More Posts
Rail News
40253 views
0

WCR/West Central
Feb 14 (20:20)   Western Central Railway's Regional Rail Users Consultative Committee Holds 21st Meeting

SGRFC^~   162 news posts
Entry# 5969695   News Entry# 541321         Tags   Past Edits
read full article... जबलपुर: नई रेलगाड़ियाँ चलाने, ट्रेनों के फेरे बढ़ाने के साथ शुरू की जाएँ कोरोना में बंद हुईं गाड़ियाँ

The 21st meeting of the Western Central Railway's Regional Rail Users Consultative Committee was held on Tuesday, chaired by General Manager Shobhana Bandopadhyay. Members of the committee, including Dheeraj Gupta, Nishant Vishwakarma, and Sunil Acharya, proposed suggestions related to their respective areas. These suggestions included introducing new trains, increasing train frequencies,...
more...
resuming trains that were halted due to the COVID-19 pandemic, providing stopovers at stations, and improving passenger amenities.

Western Central Railway ke Headquarter mein Tuesday ko 21st Regional Rail Users Consultative Committee ki meeting hui. General Manager Shobhana Bandopadhyay ji ne meeting ki chairmanship ki. Committee ke members jaise ki Dheeraj Gupta, Nishant Vishwakarma, aur Sunil Acharya ne apne apne areas se related important suggestions diye. Unhone new trains...
more...
start karne, trains ki frequencies badhane, Corona kaal mein band hui trains ko fir se start karne, stations pe stoppages dene, aur passenger facilities ko improve karne ke bare mein suggestions diye.

More Posts
Page#    Showing 1 to 5 of 28 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy