Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 05:26:24 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 1834050-0
Large Station Board;
Entry# 2880855-0

PPRH/Piprahan (1 PFs)
पिपराहाँ
پپراہاں

Track: Double Electric-Line

Updated: Mar 25 2020 (10:52) by Jammu_Mail^
Piprahan railway station (PPRH) is a small station located in the Piprahan town of Deoria district, Uttar Pradesh. It has a single platform and offers basic amenities like ticket counters and waiting rooms. The station is well-connected to nearby towns and villages, making it an important transportation hub for the region.

Tourism

The Hanuman Temple is a popular pilgrimage site known for its ancient history.
The Shiva Temple is a revered temple dedicated to Lord Shiva.
The Radha Krishna Temple is a beautiful temple dedicated to Lord Krishna and Radha.
The Durga Temple is a local temple dedicated to Goddess Durga.
The Mosque is a prominent religious site for the Muslim community in Piprahan.

Food

The Dhaba serves delicious North Indian vegetarian dishes at affordable prices.
The Restaurant offers a variety of vegetarian meals and snacks.
The Cafe provides a cozy atmosphere with a selection of vegetarian snacks and beverages.
The Sweets Shop offers a wide variety of Indian sweets and snacks.
The Street Food stalls offer a range of affordable vegetarian street food options.

Station Address

Piprahan
State: Bihar

Elevation: 59 m above sea level
Type: Regular   Category: n/a
Zone: ECR/East Central   Division: Samastipur


No Recent News for PPRH/Piprahan
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 8
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station Forum

Page#    Showing 1 to 5 of 17 blog entries  next>>
Rail News
41692 views
0

IR Affairs
ECR/East Central
Apr 22 (23:20)   Doubling Work on Muzaffarpur-Valmikinagar Rail Line Nears Completion, Overbridge Delays Remain

AdittyaaSharma^~   73037 news posts
Entry# 6040431   News Entry# 549419         Tags   Past Edits
read full article... जल्द पूरा होगा कपरपुरा-पिपराहां के बीच दोहरीकरण का कार्य

The doubling work between Kaparpura and Piprahan on the Muzaffarpur-Valmikinagar rail line will be completed soon. Electrification work on this section is scheduled to be completed by April 29th. Doubling work between Motipur and Narkatiaganj has already been completed and trains are operating on this section. However, the Muzaffarpur-Valmikinagar doubling project...
more...
is facing a delay due to the construction of Sanjay Cinema and Mardipur overbridges, which has been stalled. The railway cannot lay the double line until the width of the overbridges is increased.

Muzaffarpur-Valmikinagar railway line pe Kaparpura aur Piprahan ke beech mein doubling ka kaam bahut jaldi complete ho jaayega. Is section pe 29 April tak electrification ka kaam bhi complete ho jaayega. Motipur se Narkatiaganj ke beech doubling ka kaam already complete ho chuka hai aur trains operate bhi kar rahi hai....
more...
Lekin, Muzaffarpur-Valmikinagar doubling project Sanjay Cinema aur Mardipur overbridges ke construction mein delay ki wajah se stuck hai. Overbridges ki width badhaane ke baad hi railway double line lay sakti hai.
Rail News
39476 views
0

IR Affairs
ECR/East Central
Feb 27 (07:17)   Intercity Express Resumes Operations After Four-Day Suspension Due to Doubling Commissioning

AdittyaaSharma^~   73037 news posts
Entry# 5980069   News Entry# 543055         Tags   Past Edits
read full article... नरकटियागंज इंटरसिटी का परिचालन शुरू

The Muzaffarpur-Narkatiaganj Intercity Express, which had been suspended for four days, resumed operations on Monday. The 15215 Muzaffarpur-Narkatiaganj Intercity departed from Muzaffarpur at its scheduled time of 7:35 AM, arriving in Narkatiaganj four minutes late. The 15216 Narkatiaganj-Muzaffarpur Intercity departed from Narkatiaganj at 1:51 PM, one minute late, reaching Muzaffarpur Junction...
more...
at 5:59 PM, nine minutes behind schedule. The suspension was due to the commissioning of doubling between Narkatiaganj, Chamua, Mahwal, Motipur, and Pipraha, which necessitated changes in train operations.

Jo Muzaffarpur-Narkatiaganj Intercity Express chaar din se band thi, usne Monday ko apna chalana shuru kar diya. 15215 Muzaffarpur-Narkatiaganj Intercity subah 7:35 AM pe apne samay pe Muzaffarpur se chali, aur Narkatiaganj pe chaar minute late pahunchi. 15216 Narkatiaganj-Muzaffarpur Intercity Narkatiaganj se 1:51 PM pe, ek minute late, chali aur Muzaffarpur...
more...
Junction pe sham 5:59 PM pe, nau minute late, pahunchi. yeh bandh Narkatiaganj, Chamua, Mahwal, Motipur, aur Pipraha ke beech doubling commission karne ki wajah se thi, jiske wajah se train operations mein changes laane pade.
Rail News
39318 views
0

IR Affairs
ECR/East Central
Feb 25 (22:59)   Train Operations Resume on Champaran Route After Double-Line Commissioning

AdittyaaSharma^~   73037 news posts
Entry# 5979135   News Entry# 542887         Tags   Past Edits
read full article... चंपारण रूट पर ट्रेनों का परिचालन शुरू

Train operations resumed on the Champaran route on Sunday after the completion of double-line commissioning between Narkatiaganj to Chamua and Mahwal-Motipur-Pipraha on the Muzaffarpur-Gorakhpur railway line. Due to ongoing track work, 22 trains, including the Saptakranti, had their schedules adjusted. The Muzaffarpur-Narkatiaganj-Muzaffarpur 15215-16 Intercity Express will begin operations on Monday. Trains...
more...
including the Muzaffarpur-Anand Vihar Saptakranti, Howrah-Raxaul Mithila Express, Gorakhpur-Kolkata Express, Raxaul-Anand Vihar, Raxaul-LTT, and Saharsa-Anand Vihar, will now operate on their regular routes.

Muzaffarpur-Gorakhpur railway line pe Narkatiaganj se Chamua aur Mahwal-Motipur-Pipraha ke beech double line ka commissioning ka kaam pura hone ke baad, Sunday ko Champaran route se trains chalna shuru ho gaya. Naye track ka kaam chalne ki wajah se 16 passenger aur mail-express trains, Saptakranti sahit 22 trains ke chalne ka...
more...
time change kiya gaya tha. Sirf Muzaffarpur-Narkatiaganj-Muzaffarpur 15215-16 Intercity Express ka chalna Monday se shuru hoga. Muzaffarpur-Anand Vihar Saptakranti, Howrah-Raxaul Mithila Express, Gorakhpur-Kolkata Express, Raxaul-Anand Vihar, Raxaul-LTT, Saharsa-Anand Vihar sahit 22 trains ab apne regular route se chalengi.
Rail News
38380 views
0

IR Affairs
ECR/East Central
Feb 25 (08:41)   Double Line Commissioning Completed on Muzaffarpur-Gorakhpur Rail Section: Train Operations Resume

AdittyaaSharma^~   73037 news posts
Entry# 5978596   News Entry# 542767         Tags   Past Edits
read full article... एनआई वर्क खत्म, चंपारण रूट पर आज से नियमित होंगी ट्रेनें

The double line commissioning work between Narkatiaganj and Chamua on the Muzaffarpur-Gorakhpur rail section and between Mahwal-Motipur-Pipraha has been completed. The operation of 22 trains, including Saptakranti, was changed due to this, but will be back to normal starting Sunday. The 15215-16 Intercity Express, however, will remain cancelled on Sunday and...
more...
will resume operation from Monday. The operation of 22 other trains, including Muzaffarpur-Anand Saptakranti, Howrah-Raxaul Mithila Express, Gorakhpur-Kolkata Express, Raxaul-Anand Vihar, Raxaul-LTT, Saharsa-Anand Vihar, will now be on the regular route, providing relief to passengers travelling on the Champaran route.

Muzaffarpur-Gorakhpur rail section ke Narkatiaganj se Chamua aur Mahwal-Motipur-Pipraha ke beech double line ki commissioning ka kaam pura ho gaya hai. Iske liye 16 passenger aur mail-express trains ke sath Saptakranti sahit 22 trains ka operation badala gaya tha, jo Sunday se regular ho jaayega. Wahi, 15215-16 Intercity Express Sunday ko...
more...
bhi cancel rahegi. Iska operation Monday se hoga. Wahi, Muzaffarpur-Anand Saptakranti, Howrah-Raxaul Mithila Express, Gorakhpur-Kolkata Express, Raxaul-Anand Vihar, Raxaul-LTT, Saharsa-Anand Vihar sahit 22 trains ka operation ab regular route se hoga. Isse Champaran route ke passengers ko bada rahat milega.
Rail News
16887 views
0

IR Affairs
ECR/East Central
Feb 24 (23:17)   New Railway Line Between Pipraha, Motipur and Mahwal in Muzaffarpur-Narkatiaganj Section Ready for Operations

AdittyaaSharma^~   73037 news posts
Entry# 5978484   News Entry# 542752         Tags   Past Edits
read full article... स्पीड ट्रायल : नई रेललाइन पर 130 किमी की रफ्तार से दौड़ी ट्रेन

The commissioning of the railway line between Pipraha, Motipur and Mahwal stations on the Muzaffarpur-Narkatiaganj rail section is complete. A speed trial of the newly constructed railway line was conducted on Saturday. The train was run at a speed of 130 km/h during the trial, which was overseen by the Commissioner...
more...
of Railway Safety (CRS) for the Eastern Circle, Kolkata, Suvomoay Mitra. Once the fitness report is received, train operations will begin on the new track. Officials from the Samastipur Railway Division were present during the trial. The doubling of the railway line between Pipraha and Mahwal will increase the speed of trains on the Narkatiaganj rail section, eliminating the need for passengers to stop at crossings during their journey. This will enable faster travel times. Following the commencement of operations on the new railway line, long-distance trains will also start running on this section. This rail section will benefit not only Muzaffarpur, but also the Mithilanchal region.

Muzaffarpur-Narkatiaganj rail section pe Pipraha, Motipur aur Mahwal station ke beech ki railway line ka commissioning ho gaya hai. Saturday ko newly built railway line ka speed trial hua. Train ko 130 km/h ki speed pe daurana ke saath trial kiya gaya. Eastern Circle Kolkata ke Commissioner of Railway...
more...
Safety (CRS), Suvomoay Mitra ke presence mein trial hua. Fitness report aane ke baad new track se train ka operation start ho payega. Iske during mein Samastipur Rail Mandal ke officers present the. Pipraha se Mahwal ke beech railway line doubling hone se Narkatiaganj rail section ke train ki speed badh jaayegi. Passengers ko apni journey ke during mein crossing ke liye rukna nahin padega. Time pe journey puri ho payegi. New railway line pe operation start hone ke baad is rail section pe long distance ki new train ka bhi operation start kiya jaayega. Is rail section se nahin sirf Muzaffarpur balki Mithilanchal ko bhi fayda milega.
Page#    Showing 1 to 5 of 17 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy