ECR Major Projects :
#Budget 2021-22
1. Saharsa Forbesganj GC : 100 Cr.
2. Jhanjharpur Laukahabazar Nirmali GC : 150 Cr.
3. Koshi Bridge : 60 Cr.
4. Samastipur Darbhanga Doubling : 45 Cr.
5. Jaynagar Narkatiyaganj GC : 25 Cr.
6. Jaynagar Bardivas : 100 Cr.
7. Darbhanga Bypass : 100 Cr.
8. Patliputra Pahleza Doubling, Elec. : 50 Cr.
9. Giridih Koderma : 181 Cr.
10. Koderma Ranchi : 148 Cr.
11. Neura Biharsharif Barbigha Sheikhpura New Line : 150 Cr.
12. Koderma Tilaiya : 296 Cr.
13. Son nagar Dankuni DFC : 2959 Cr.
14. GC Work MNE SHC PRNA : 15 Cr.
15. Kursela Bridge Doubling : 20 Cr.
16. Garhwa Road-Ramna Doubling : 50 Cr.
17. Danea-Ranchi Road - Patch doubling : 10 Cr.
18. Jarangdih-Danea - Patch doubling : 75 Cr.
19. Hajipur-Ramdaualu Nagar doubling : 10 Cr.
20. Renukut-Chopan Doubling : 20 Cr.
21. Karaila Road-Shaktinagar Doubling : 200 Cr.
22. Ranchi Road-Patratu - Patch doubling : 20 Cr.
23. Rajendra Bridge Doubling : 300 Cr.
24. Ramna-Singrauli Doubling : 340 Cr.
25. Dhanbad-Sonnagar (Patratu-Sonnagar) - 3rd line : 950 Cr.
26. Hajipur-Bachwara Doubling : 180 Cr.
27. Kiul - Gaya (124 km) : 250 Cr.
28. Pradhankhunta Jn-Patherdih Bazar-Bhojudih : 5 Cr.
29. Gomoh - Flyover for down trains : 100 Cr.
30. Garwa Road - Rail over rail : 60 Cr.
31. Muzaffarpur - Sagauli Doubling : 125 Cr.
32. Sagauli - Valmikinagar Doubling : 125 Cr.
33. Karota Patner-Mankatha - Surface triangle line : 50 Cr.