Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 6 21:59:45 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 487843-0
Medium; Platform Pic; Large Station Board;
Entry# 2995118-0


SZB/Sarona (2 PFs)
सरोना
सरोना

Track: Triple Electric-Line

Sarona Railway Station (SZB), located in Raipur, Chhattisgarh, is a small station with 2 platforms. It offers basic amenities like ticket counters, waiting rooms, and restrooms. The station serves as a vital link for locals traveling between Sarona and nearby villages.

Tourism

Shri Mahamaya Devi Temple: A revered Hindu temple dedicated to Goddess Mahamaya Devi.
Shri Hanuman Temple: A popular temple dedicated to Lord Hanuman.
Shri Ram Mandir: A temple dedicated to Lord Rama.
Masjid-e-Aqsa: A historic mosque known for its architectural beauty.
Gurudwara Sahib: A Sikh temple known for its peaceful atmosphere and community service.

Food

Shree Ram Restaurant: A popular vegetarian restaurant known for its delicious North Indian dishes.
The Dhaba: A local eatery offering a variety of vegetarian snacks and street food.
Annapurna Sweets: A renowned sweets shop offering a wide range of traditional Indian sweets and snacks.
Sagar Restaurant: A popular vegetarian restaurant known for its South Indian dishes and thalis.
Sai Bhojanalaya: A budget-friendly vegetarian restaurant serving simple and tasty meals.

Station Address

Sarona Railway Station, Raipur
State: Chhattisgarh

Elevation: 282 m above sea level
Type: Regular   Category: n/a
Zone: SECR/South East Central   Division: Raipur


No Recent News for SZB/Sarona
Nearby Stations in the News
Number of Platforms: 2
Number of Halting Trains: 28
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 2.7/5 (7 votes)
cleanliness - average (1)
porters/escalators - poor (1)
food - poor (1)
transportation - average (1)
lodging - n/a (0)
railfanning - excellent (1)
sightseeing - good (1)
safety - average (1)

Station Forum

Page#    Showing 1 to 5 of 122 blog entries  next>>
Rail News
292682 views
3

IR Affairs
SECR/South East Central
Apr 27 (12:13)   Automatic Signaling System Improves Train Efficiency on South East Central Railway

AdittyaaSharma^~   72978 news posts
Entry# 6045597   News Entry# 550067         Tags   Past Edits
1 compliments
Useful
read full article... अच्‍छी खबर: रेलवे के इस सिस्‍टम से अब ट्रेनें नहीं होंगी लेट, आने वाले दिनों में रेल यात्रियों की परेशानी होगी दूर

The South East Central Railway has installed an automatic signaling system on the Kumhari-Sarona and Bilaspur-Gatora sections to enhance train efficiency and reduce delays and accident risks. This system allows multiple trains to operate on the same track, decreasing passenger train delays and improving traffic management. The system enables more trains...
more...
to operate on the same track segment, accommodating up to four, five, or six trains based on the distance between stations. This approach eliminates the need for new stations and reduces maintenance costs. The railway completed the installation of 14 kilometers of automatic signaling in April 2024, including Kumhari-Sarona (7 km) and Bilaspur-Gatora (7 km). With this project, the automatic signaling system from Nagpur to Sarona is fully operational. The system between Sarona and Raipur is expected to be completed within the next three months. This automation will benefit the South East Central Railway by reducing passenger train delays caused by heavy freight traffic, enabling multiple trains to operate within a single block section, and enhancing the implementation of safety systems like Kavach and the centralized traffic control system.

South East Central Railway ne Kumhari-Sarona aur Bilaspur-Gatora sections pe automatic signaling system laga diya hai, jisse train ka efficiency badhega aur delay aur accidents ka risk kam hoga. Is system se ek hi track pe multiple trains aasani se chal sakengi, jisse passenger trains ki delay kam hogi aur traffic...
more...
management badhega. Ye system ek hi track section pe zyada trains chala sakta hai, jisme do stations ke beech ki distance ke hisab se 4, 5 ya 6 trains chal sakti hain. Isse new stations banane ki zaroorat nahi hai aur maintenance ka kharcha bhi kam hota hai. Railway ne April 2024 me 14 kilometers automatic signaling ka kaam pura kiya hai, jisme Kumhari-Sarona (7 km) aur Bilaspur-Gatora (7 km) shamil hain. Is project se Nagpur se Sarona tak automatic signaling system fully operational ho gaya hai. Sarona se Raipur tak ka system next three months me complete ho jayega. Ye automation South East Central Railway ko benefit dega kyunki heavy freight traffic ki wajah se passenger trains ki delay kam hogi, ek hi block section me multiple trains chal sakengi, aur safety system like Kavach aur centralized traffic control system ko implement karne me madad milegi.

More Posts
Rail News
118099 views
0

IR Affairs
SECR/South East Central
Feb 26 (10:28)   PM Modi to Inaugurate Over 2,000 Railway Infrastructure Projects Under Amrit Bharat Station Scheme

AdittyaaSharma^~   72978 news posts
Entry# 5979393   News Entry# 542929         Tags   Past Edits
read full article... Amrit Bharat Station Scheme: छत्‍तीसगढ़ के इन 17 रेलवे स्‍टेशनों का होगा कायाकल्‍प, PM मोदी आज वीसी के जरिये करेंगे शिलान्‍यास

Prime Minister Narendra Modi will dedicate nearly 2,000 railway infrastructure projects worth over ₹41,000 crore to the nation on Monday, February 26th, at 12:30 PM via video conferencing. The event will be held at Raipur Railway Station, with Raipur MP Sunil Soni and other MLAs in attendance. The event will include...
more...
the groundbreaking ceremony for the redevelopment of 553 railway stations under the Amrit Bharat Station Scheme, including the redevelopment of 17 stations in Chhattisgarh, which will cost approximately ₹2,700 crore. The 17 stations being redeveloped are: Sarona, Mandir Hasaud, Hathbandh, Nipania, Bhatapara, Dongargarh, Korba, Raigarh, Rajnandgaon, Bhilai Nagar, Bilha, Baikunthpur Road, Ambikapur, Uslapur, Pendra Road, Janjgir Naila, Champa, Baradwar, Dallirajhara, Bhanupratappur, and Bhilai. In addition to these stations, 21 other stations will be developed, along with 83 Road Over Bridges and Road Under Bridges, offering modern passenger amenities like rooftop plazas, landscaping, intermodal connectivity, modern facades, children's play areas, kiosks, food courts, and eco-friendly and disabled-friendly facilities.

PM Modi 26 February ko, dopahar 12.30 baje, video conferencing se 41000 crore se zyada ki 2000 railway infrastructure projects ko nation ko dedicate karenge. Raipur Railway Station pe yeh program hoga. Raipur MP Sunil Soni aur MLAs bhi honge. Amrit Bharat Station Scheme ke under 553 railway stations ka redevelopment...
more...
shuru hoga. Chhattisgarh mein 2700 crore ki cost se 17 stations ka redevelopment hoga. Yeh stations hain: Sarona, Mandir Hasaud, Hathbandh, Nipania, Bhatapara, Dongargarh, Korba, Raigarh, Rajnandgaon, Bhilai Nagar, Bilha, Baikunthpur Road, Ambikapur, Uslapur, Pendra Road, Janjgir Naila, Champa, Baradwar, Dallirajhara, Bhanupratappur, aur Bhilai. 21 aur stations aur 83 Road Over Bridges aur Road Under Bridges bhi banenge. Yaha modern facilities honge jaise ki roof top plaza, landscaping, intermodal connectivity, modern facade, kids play area, kiosks, food courts, aur eco-friendly and disabled-friendly facilities.
0
updating ...
6 wishes
Happy Journey HJ Happy Journey Forever MPS HJ ज़रा संभल के
by mistake closed last trip ...

245 Posts

FmtBlog
35131 views
0

Feb 10 (10:25)
AAM_INSAAN^~   17201 blog posts
Re# 5965795-246            Tags  
Sarona  
@SZB: Sarona 1 km <--> 5 km @KMI: Kumhari   35km/h   1h 25m late
@SZB: Sarona &35 km/h crawling
Translate to English
Translate to Hindi

FmtBlog
34412 views
0

Feb 10 (10:25)
AAM_INSAAN^~   17201 blog posts
Re# 5965795-247            Tags  
Sarona  
@SZB: Sarona 2 km <--> 5 km @KMI: Kumhari   50km/h   1h 25m late
@SZB: Sarona &50 km/h .
Translate to English
Translate to Hindi

FmtBlog
36052 views
0

Feb 10 (10:25)
AAM_INSAAN^~   17201 blog posts
Re# 5965795-248            Tags  
Sarona  
@SZB: Sarona 2 km <--> 5 km @KMI: Kumhari   50km/h   1h 24m late
@SZB: Sarona &50 km/h .
Translate to English
Translate to Hindi

FmtBlog
35698 views
0

Feb 10 (10:26)
AAM_INSAAN^~   17201 blog posts
Re# 5965795-249            Tags  
Sarona  
@SZB: Sarona 2 km <--> 4 km @KMI: Kumhari   51km/h   1h 24m late
@SZB: Sarona &53 km/h started gaining speed
Translate to English
Translate to Hindi

FmtBlog
35647 views
0

Feb 10 (10:26)
AAM_INSAAN^~   17201 blog posts
Re# 5965795-250            Tags  
Sarona  
@SZB: Sarona 3 km <--> 3 km @KMI: Kumhari   57km/h   1h 24m late
@SZB: Sarona &53 km/h xing with BOXN powered by wag9
Translate to English
Translate to Hindi

More Posts
0
updating ...
9 wishes
Happy Journey HJ আপনার যাত্রা শুভ হোক Happy Journey Happy Journey शुभ यात्रा Happy Journey Happy Journey May you witness many, many overtakings.
Now it's time to return home after spending a week in Gujrat.

261 Posts

FmtBlog
34372 views
0

Jan 28 (23:07)
Deepanjan^~
Deepanjan^~   16547 blog posts
Re# 5953631-262            Tags  
Sarona  
@KMI 3 km <--> 3 km @SZB   2m late
@SZB: Sarona &110 km/h over Karun River
Translate to English
Translate to Hindi

FmtBlog
41490 views
0

Jan 28 (23:09)
Deepanjan^~
Deepanjan^~   16547 blog posts
Re# 5953631-263            Tags  
Sarona  
@SZB   1m late
@SZB: Sarona &108 km/h skipped
Translate to English
Translate to Hindi

More Posts
Info Update
567432 views
9

Apr 05 2021 (13:08)   ET/Itarsi Junction (8 PFs)
Anmol^~
Anmol^~   346 blog posts
Entry# 4929797            Tags   Past Edits
1 compliments
Hamesa ki tarah Useless
Must check this document : sanction of final location survey for works under doubling plan head of various locations in ECR, ECoR, SCR, SECR, WCR.
Translate to English
Translate to Hindi

More Posts
Page#    Showing 1 to 5 of 122 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy