Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Sep 9 19:27:10 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Medium; Platform Pic; Large Station Board;
Entry# 4382350-0
no description available
Entry# 4420925-0


TGT/Tinai Ghat (1 PFs)
तिनै घाट
ತಿನೈ ಘಾಟ್

Track: Construction - Electric-Line Doubling

Updated: Nov 13 2018 (11:14) by SteelCityRF^~

Station Address

National Highway 4A
State: Karnataka

Elevation: 666 m above sea level
Type: Regular   Category: n/a
Zone: SWR/South Western   Division: SSS Hubballi (Hubli)


No Recent News for TGT/Tinai Ghat
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 2
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station Forum

Page#    Showing 1 to 5 of 23 blog entries  next>>
General Travel
69356 views
8

May 28 2023 (12:00)   12779/Goa Express (PT) | LD/Londa Junction (3 PFs) | PUNE/WDP-4D
LHB_for_18047~
LHB_for_18047~   11166 blog posts
Entry# 5736363            Tags   Past Edits
4 compliments
Great Great Great Great
Last few remaining ICF days of Goa express 😍
Pune WDP4D cruising with the ICF rake of 12779 Goa express through the scenic Tinaighat Londa section.
Please like share and subscribe my channel 🙏
Translate to English
Translate to Hindi

More Posts
General Travel
207210 views
13

★★
Apr 17 2023 (11:30)   12779/Goa Express (PT) | SVM/Sanvordem (Kudchade) (3 PFs)
LHB_for_18047~
LHB_for_18047~   11166 blog posts
Entry# 5696672            Tags   Past Edits
5 compliments
Useful Great Useful Useful Useful
Few updates from my recent trip in 12779 on 13.04.2023.
1. 12779 CC is exactly reversed by SWR except the 2 parcel vans.
2. Spotted 8 brand new LHB coaches consisting of 6 GS and 2 3ACE coaches most probably for Goa express at Kalem.
3. SVM to Kalem FEDL updates Total 10 kms. SVM outers ground works going on at good pace and
...
more...
the bridge outside SVM ready too, ground works at good progress for around 1km, further around 2 kms no works done most probably some land issue, then for around 7kms double line fully laid till Kalem. Regarding electrification the existing line is electrified and on the new line poles are laid. If the work on the middle 2 kms start immediately now the section can be doubled in next 6 months.
4. Kalem to Kulem existing single line already electrified and doubling works have just begun from Kulem railway station.
5. Kulem to Castle Rock no doubling work, but electric poles have been or are being put up at all places except the tunnels.
6. Castle Rock to Tinaighat doubling update: from CLR for around 30% of the section no work but for remaining around 70% ground fully levelled now ballast laying to commence. Electric poles have but put up besides the area levelled for double line. At CLR I think only the mainline is under wires (not fully sure) but other tracks only poles have been put up wiring still left.
7. LD to Kudachi if fully doubled now and Kudachi to Vijaynagar doubling almost done can be commissioned in next 2 to 3 months. could not notice electrification coz of darkness but poles are definitely there entire route could not or did not see the wiring though.
8. Vijaynagar to MRJ doubling going at slower pace compared to Kudachi Vijaynagar. My trip ended at MRJ.

Translate to English
Translate to Hindi

More Posts
Info Update
76669 views
13

★★
Sep 05 2022 (17:41)   MAO/Madgaon Junction (6 PFs)
sparshsinghal2110
sparshsinghal2110   650 blog posts
Entry# 5468774            Tags   Past Edits
Got some update about the electrification of Madgaon to kulem and Castle rock to tinahai ghat the CRS has been completed today. If anybody can confirm the news its correct or not. And share soem pics of the trial.
Translate to English
Translate to Hindi

More Posts
Rail Fanning
46539 views
5

May 07 2022 (12:15)   18047/Shalimar - Vasco-da-Gama Amaravati Express (PT) | TGT/Tinai Ghat (1 PFs) | GY/WDG-3A/14627
NanduKrishnan19^~
NanduKrishnan19^~   1671 blog posts
Entry# 5337156            Tags   Past Edits
Vasco-da-gama bound Amaravati Express at a level crossing between Tinhai Ghat and Londa Junction.

Do watch and subscribe for more...!!!
Translate to English
Translate to Hindi
Info Update
31060 views
5

May 30 2017 (01:08)   SVTN/Shivathan (1 PFs)
Manoj Sinha on IRI~
Manoj Sinha on IRI~   1405 blog posts
Entry# 2299273            Tags   Past Edits
Doubling Shivathan-Londa -Tinaighat on Hospet - Tinaighat-Vasco route ocommissioned
today.
Source- twitter
Translate to English
Translate to Hindi

More Posts
Page#    Showing 1 to 5 of 23 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy