Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 6 17:58:08 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
no description available
Entry# 5650024-0

KDRI/Kendri (1 PFs)
केन्द्री

Track: Single Electric-Line

Station Address

Kendri
State: Chhattisgarh

Elevation: n/a
Type: Regular   Category: n/a
Zone: SECR/South East Central   Division: Raipur


No Recent News for KDRI/Kendri
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station Forum

Page#    Showing 1 to 5 of 40 blog entries  next>>
Rail News
28538 views
0

IR Affairs
SECR/South East Central
May 25 (12:03)   New Railway Station in Nava Raipur to Open Before Diwali, Connecting Key Cities

AdittyaaSharma^~   72978 news posts
Entry# 6075313   News Entry# 553598         Tags   Past Edits
read full article... CG News: नवा रायपुर में अगले महीने बन जाएगा रेलवे स्टेशन, दीवाली के पहले दौड़ेगी यात्री ट्रेन, ये होंगी विशेषताएं

A new railway station near the Ministry in Nava Raipur is expected to be completed by June, with train services from Raipur to Mandir Hasaud, Nava Raipur, and Kendri (Abhanpur) starting before Diwali. The 25 km railway track between Nava Raipur and Kendri has been laid, and three model stations are...
more...
being built in the Nava Raipur area. The station near the Ministry, part of a multi-modal transport (MMT) hub, will provide bus and auto connectivity. The project, initially planned for December 2022, was delayed due to the COVID-19 pandemic and issues with railway break-down availability. The new railway line will feature a shopping complex above the station, parking facilities for buses, autos, and taxis, entertainment options, restaurants, hotels, and cafes. The project cost has increased from 52 crores to 100 crores. The railway line is expected to be a significant turning point for Nava Raipur's development, connecting it to major cities like Bilaspur, Raipur, Durg, and Bhilai. The first station in Nava Raipur will be at Atal Nagar, located about 2 km from Mandir Hasaud.

Nava Raipur mein Ministry ke paas ek naya railway station June mein banke ready ho jaayega, aur Raipur se Mandir Hasaud, Nava Raipur aur Kendri (Abhanpur) tak train service Diwali se pehle shuru hone ki umeed hai. Nava Raipur aur Kendri ke beech 25 km railway track ban gaya hai, aur...
more...
Nava Raipur area mein teen model stations ban rahe hain. Ministry ke paas ban rahe multi-modal transport (MMT) hub mein station ke paas hi bus aur auto ki suvidha milegi. Project December 2022 mein complete hone wala tha, lekin COVID-19 pandemic aur railway break-down availability ki wajah se delay ho gaya. Naye railway line mein station ke upar ek shopping complex, parking facilities for buses, autos, taxis, entertainment options, restaurants, hotels aur cafes honge. Project ki cost 52 crore se badhkar 100 crore ho gayi hai. Railway line Nava Raipur ke development mein ek bada turning point banega, jisse Bilaspur, Raipur, Durg aur Bhilai jaise bada cities se connect karega. Nava Raipur mein pehla station Atal Nagar mein banega, jo Mandir Hasaud se lagabhag 2 km door hai.
Rail News
38059 views
0

IR Affairs
SECR/South East Central
May 08 (10:06)   Raipur Railway Plans Coaching Depot at Kendri Station for Improved Train Maintenance and Cleanliness

AdittyaaSharma^~   72978 news posts
Entry# 6056784   News Entry# 551387         Tags   Past Edits
read full article... Raipur: केंद्री में बनेगा रेलवे का कोचिंग डिपो, अब मरम्मत और रखरखाव के लिए दुर्ग-बिलासपुर नहीं ले जानी पड़ेंगी ट्रेनें

The South East Central Railway is planning to build a coaching depot at the Kendri station in Raipur to improve the cleanliness and maintenance of trains in the Raipur division. The depot is being planned because there is not enough space at the main Raipur station to park and clean the...
more...
trains. Currently, trains are maintained at Durg and Bilaspur depots. The coaching depot at Kendri will allow trains to be cleaned and maintained in a dedicated facility, improving the overall cleanliness of the trains. It will also allow trains to be dispatched directly to the Raipur station from Kendri, reducing travel time and benefiting passengers. The project is still in the planning stages, with a proposal being sent to the zonal headquarters for approval. Once approved, the construction will be expedited. The Naya Raipur station, which is part of this project, is expected to be operational in two years, as only 50% of the construction is complete. The project was initially planned to be completed by 2020 but faced delays due to funding issues and delays by the executing agency.

Raipur division ke trains ke saaf-safai aur marammat ke liye South East Central Railway, Raipur ke Kendri station pe ek coaching depot banane ki planning kar raha hai. Iska karan hai ki Raipur ke main station pe train ko park aur saaf karne ke liye jagah nahi hai. Abhi, trains ka...
more...
marammat aur maintenance Durg aur Bilaspur depots pe hota hai. Kendri pe coaching depot banne se trains ki saaf-safai aur behtar hogi. Isse trains ko sidha Kendri se Raipur station pe bheja ja sakega, jisse travel time kam hoga aur passengers ko fayda hoga. Project abhi planning stage me hai, aur zonal headquarters ko approval ke liye proposal bheja gaya hai. Approval milne ke baad construction jaldi shuru hoga. Naya Raipur station, jo is project ka part hai, do saal me operational hone ki ummid hai, kyunki sirf 50% construction pura hua hai. Project initially 2020 me complete hone wala tha, lekin funding issues aur executing agency ki late-lateefi ki wajah se delay ho gaya.

More Posts
Rail News
60064 views
6

IR Affairs
SECR/South East Central
Feb 07 (10:30)   पटरी बिछाने का काम पूरा:केंद्री से अभनपुर के बीच 115 किमी की रफ्तार से दौड़ी ट्रेन, हरी झंडी मिलते ही चलने लगेगी यात्री गाड़ी

SaurabhDubey^~   5521 news posts
Entry# 5963417   News Entry# 540427         Tags   Past Edits
1 compliments
Great
रेलवे ने केंद्री से अभनपुर तक पटरी बिछाने का काम पूरा कर लिया है। मंगलवार को कलकत्ता से कमिश्नर आफ रेलवे सेफ्टी (सीआरएस) की टीम ने...
read full article... पटरी बिछाने का काम पूरा:केंद्री से अभनपुर के बीच 115 किमी की रफ्तार से दौड़ी ट्रेन, हरी झंडी मिलते ही चलने लगेगी यात्री गाड़ी

More Posts
Rail News
32701 views
0

IR Affairs
SECR/South East Central
Feb 02 (10:36)   Railway Budget 2024: छत्तीसगढ़ में चल रही रेल परियोजनाएं अब बजट की कमी के कारण नहीं अटकेंगी

AdittyaaSharma^~   72978 news posts
Entry# 5959075   News Entry# 539734         Tags   Past Edits
अंतरिम बजट के बाद केंद्रीय रेल मंत्री अश्विनी वैष्णव भारतीय रेलवे के सभी जोन से वीडि़यो कांफ्रेंस के माध्यम से जुड़े और राज्यवार आवंटित बजट की...
read full article... Railway Budget 2024: छत्तीसगढ़ में चल रही रेल परियोजनाएं अब बजट की कमी के कारण नहीं अटकेंगी
Rail News
30454 views
0

Commentary/Human Interest
SECR/South East Central
Jan 28 (19:37)   Good News: अभनपुर से केन्द्री तक बड़ी रेल लाइन का काम पूरा, अब दौड़ेगी ट्रेन

SmallTownTraveller^~   5779 news posts
Entry# 5954845   News Entry# 539039         Tags   Past Edits
Abhanpur to Kendari rail line: 28 जनवरी से इसका परीक्षण एवं निरीक्षण के उद्देश्य से चलना शुरू हो जाएगा। कुछ दिन ट्रायल के बाद रिपोर्ट उच्चाधिकारियों...
read full article... Good News: अभनपुर से केन्द्री तक बड़ी रेल लाइन का काम पूरा, अब दौड़ेगी ट्रेन
Page#    Showing 1 to 5 of 40 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy