Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 18:51:16 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

DIT/Dohrighat (1 PFs)
दोहरी घाट
دوہری گھاٹ

Track: Single Electric-Line

Updated: Apr 26 2023 (10:24)

Station Address

Dohrighat, Mau
State: Uttar Pradesh

Elevation: 78 m above sea level
Type: Regular   Category: HG-2
Zone: NER/North Eastern   Division: Varanasi


No Recent News for DIT/Dohrighat
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 0
Number of Originating Trains: 1
Number of Terminating Trains: 1
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station Forum

Page#    Showing 1 to 5 of 108 blog entries  next>>
Rail News
9638 views
0

Commentary/Human Interest
NER/North Eastern
Sep 01 (23:38)   UP Focuses on Railway Connectivity: New Track to Connect Sahjanwa and Dohrighat, Magahar Station to be Upgraded

ProRF.^~   452 news posts
Entry# 6175795   News Entry# 567614         Tags   Past Edits
read full article... UP का ये रेलवे स्टेशन बनेगा जंक्शन, वाई कनेक्शन से जुड़ेगी लाइन, मिली मंजूरी

The Yogi government in Uttar Pradesh is focusing on improving railway connectivity along with road infrastructure. A new railway track is being laid from Sahjanwa to Dohrighat. This will create a direct route for trains to and from Lucknow. The Magahar station in Gorakhpur will be upgraded to a junction by...
more...
connecting it to the Sahjanwa-Dohrighat railway line through a Y-shaped connection. This will eliminate the need for engine reversal at Sahjanwa for trains travelling towards Gorakhpur, saving time and improving efficiency. A separate track will be built between Sahjanwa and Magahar for this Y-connection, ensuring smoother flow of traffic and avoiding delays caused by engine reversal.

UP mein road infrastructure ke saath saath railway connectivity ko bhi behtar banane mein Yogi Sarkar ka dhyan de rahi hai. Sahjanwa se Dohrighat tak ek nayi railway track bichi jaani hai. Isse Lucknow se aane jaane wali trains ke liye ek direct route banega. Gorakhpur ke Magahar station ko ek...
more...
junction banaya jaayega, jisko Sahjanwa-Dohrighat railway line se Y-connection ke through connect kiya jaayega. Isse Gorakhpur ki taraf jaane wali trains ko Sahjanwa mein engine reversal karne ki jarurat nahi hogi, jisse samay ki bachat hogi aur efficiency badhegi. Is Y-connection ke liye Sahjanwa aur Magahar ke beech ek alag track banaya jaayega, jisse traffic smooth rahega aur engine reversal se hone wale delays se bacha ja sakega.
finally ab gaon ki taraf

25 Posts

FmtBlog
3045 views
0

Aug 15 (08:25)
TouristerDivyanshu^~
TouristerDivyanshu^~   174270 blog posts
Re# 6157872-26            Tags  
1 km from @IAA: Indara Jn   36km/h   14m late
@IAA: Indara Jn &61 km/h meeting with @DIT: Dohrighat line
Translate to English
Translate to Hindi

More Posts
Rail News
48310 views
0

IR Affairs
NER/North Eastern
Jul 24 (11:50)   Northeast Railway Zone to Receive INR 600 Crore Boost for New Lines and Track Upgrades

AdittyaaSharma^~   73037 news posts
Entry# 6134816   News Entry# 561809         Tags   Past Edits
read full article... बढ़ेगा एनईआर का बजट, दो से तीन दिन में साफ हो जाएगी तस्वीर

The Indian Railways is expected to receive an additional INR 600 crore budget for the Northeast Railway (NER) zone. This will boost the total NER budget to around INR 600 crore, up from the INR 5813.20 crore allocated in the interim budget. This additional funding will support the construction of new...
more...
railway lines, including the Khalilabad-Shravasti-Balrampur line (55 km), the Sahjanwa-Dohrighat line (81 km), and the Anandnagar-Ghughli line. The NER has received INR 1057 crore for doubling and tripling tracks, which will accelerate the development of the Gorakhpur Cantt.-Valmikinagar, Bhatni-Aunrihar, and Kusmhi-Gorakhpur-Domingarh lines. The Khalilabad-Shravasti-Balrampur line will be constructed in three phases, with the first phase (Khalilabad-Bansi, 27 km) scheduled for completion in March 2025. The Sahjanwa-Dohrighat line, with trains designed to run at 160 km/h, will also be built in three phases, culminating in the completion of the final phase (Golabazar-New Dohrighat, 25.5 km) in March 2027.

Indian Railways ko Northeast Railway (NER) zone ke liye INR 600 crore ka additional budget milne ki ummeed hai. Isse NER ka total budget INR 600 crore tak badh jaayega, jo ki interim budget mein allocate kiya gaya INR 5813.20 crore se zyada hai. Is additional funding se new railway lines...
more...
ka construction hoga, jisme Khalilabad-Shravasti-Balrampur line (55 km), Sahjanwa-Dohrighat line (81 km), aur Anandnagar-Ghughli line bhi shamil hai. NER ko doubling aur tripling tracks ke liye INR 1057 crore mila hai, jisse Gorakhpur Cantt.-Valmikinagar, Bhatni-Aunrihar, aur Kusmhi-Gorakhpur-Domingarh lines ka development fast hoga. Khalilabad-Shravasti-Balrampur line teen phases mein banaye jaayegi, pehla phase (Khalilabad-Bansi, 27 km) March 2025 mein complete hone wala hai. Sahjanwa-Dohrighat line, jisme trains 160 km/h ki speed se chalengi, bhi teen phases mein banaye jaayengi, jiska final phase (Golabazar-New Dohrighat, 25.5 km) March 2027 mein complete hoga.
Rail News
45540 views
0

IR Affairs
NER/North Eastern
May 02 (12:05)   Gorakhpur Railway Bypass: 945 Crore Project to Ease Train Congestion

AdittyaaSharma^~   73037 news posts
Entry# 6050745   News Entry# 550678         Tags   Past Edits
read full article... सरदानगर-खजनी तक बनेगा रेल बाईपास, सहजनवा-दोहरीघाट लाइन में मिलेगी

To alleviate the growing pressure of trains at Gorakhpur Junction, the Indian Railways is constructing a bypass line between Sardarnagar and Khajni. This 34.67 km bypass line, costing an estimated 945 crores, has already completed its preliminary survey. The bypass will connect to the under-construction Sahjanwa-Dohrighat line near Khajni. It will...
more...
allow freight trains to bypass Gorakhpur, reducing congestion and improving passenger train movement. The project will cost 945 crore rupees and is expected to save an estimated 43 crore rupees annually. The bypass will accommodate 32 freight trains, which currently cause line blocks at Gorakhpur. It will also include 12 bridges (including one major bridge), 13 underpasses, and electrification. This will reduce congestion at Gorakhpur Junction, which currently experiences a 50% overload of trains.

Gorakhpur Junction pe train ka bahut load hai, isse tackle karne ke liye, Railway Sardarnagar se Khajni tak bypass line bana raha hai. Yeh bypass line 34.67 km lamba hai, aur ispe 945 crore rupees ka kharcha aayega. Preliminary survey complete ho gaya hai, aur final survey ke liye permission maangi...
more...
gayi hai. Yeh bypass under-construction Sahjanwa-Dohrighat line se connect hoga, aur isse Gorakhpur se freight trains bypass ho jayengi, jisse passenger trains ki movement smoothly ho payegi. Is project se har saal 43 crore rupees ki saving hogi, aur 32 freight trains bypass honge, jo currently Gorakhpur Junction pe line block karti hai. Bypass line me 12 bridges (ek major bridge), 13 underpasses aur electrification bhi include hoga.

More Posts
General Travel
22129 views
0

Apr 23 (13:45)   05478/Mau - Dohrighat MEMU Special | DIT/Dohrighat (1 PFs)
SATYAMGUPTADDU~
SATYAMGUPTADDU~   4014 blog posts
Entry# 6040908            Tags  
05478/ मेमू स्पेशल || मऊ - दोहरीघाट !!!
Translate to English
Translate to Hindi
Page#    Showing 1 to 5 of 108 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy