Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Aug 3 04:12:51 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

SDLP/Sadulpur Junction (5 PFs)
Local Name: Rajgarh
सादुलपुर जंक्शन


Track: Single Electric-Line

Updated: Jan 12 2023 (16:11) by HaryanaExpress~
Show ALL Trains
National Highway 709, Tehsil - Rajgarh, District- Churu, PIN- 331023
State: Rajasthan

Elevation: n/a
Type: Junction   Category: NSG-5
Zone: NWR/North Western   Division: Bikaner


No Recent News for SDLP/Sadulpur Junction
Nearby Stations in the News
Number of Platforms: 5
Number of Halting Trains: 70
Number of Originating Trains: 3
Number of Terminating Trains: 3
0 Follows
Rating: 3.8/5 (33 votes)
cleanliness - good (4)
porters/escalators - good (4)
food - good (4)
transportation - good (4)
lodging - good (4)
railfanning - good (4)
sightseeing - good (4)
safety - good (5)
Show ALL Trains

Station Forum

Page#    Showing 1 to 5 of 330 blog entries  next>>
Info Update
6522 views
0

Yesterday (13:23)   14717/Bikaner - Haridwar Express | BKN/Bikaner Junction (6 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   521 blog posts
Entry# 6143766            Tags   Past Edits
Railways should make rsa or rake sharing arrangements between 14707/08 Lalgarh (Bikaner) Dadar Western Ranakpur express and 14717/18 Bikaner Haridwar gita ganga express and should also give 2 lhb rakes to 14717/18 to make it daily between Bikaner and Haridwar and after doing rake sharing arrangements or rsa of both trains railways should do primary maintenance of 5 lhb rakes (3 lhb rakes of 14707/08 and 2 lhb rakes of 14717/18) at Lalgarh jn and rsa pattern of both trains should be like this 14717-14718-14708-14707 then primary maintenance at Lalgarh jn. And for speeded up time table of both trains please refer to these blogs -

...
more...
(6031458 , 6031428) ranakpur express, (6023738, 6023737) gita ganga express. Or refer to the links given below.

/train/224818

/train/224820

/train/225349

/train/225346

Translate to English
Translate to Hindi
Info Update
53367 views
1

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   521 blog posts
Entry# 6143019            Tags   Past Edits
1 compliments
Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that i can save my post from getting archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can get see that whether this coach composition for train sets will become a successful idea or will become waste idea.

Translate to English
Translate to Hindi

More Posts
Info Update
103851 views
0

Jul 06 (18:09)   22482/Delhi Sarai Rohilla - Jodhpur SF Express | JU/Jodhpur (6 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   521 blog posts
Entry# 6116443            Tags   Past Edits
Railways should extend 22481/82 Jodhpur Delhi Sarai Rohilla express upto Haridwar via Meerut Tapri Roorkee and should also change the time table of this train and for further information refer to these blogs - 6023859, 6023875 or refer to the links given below -

/train/224836

...
more...

Translate to English
Translate to Hindi
General Travel
208764 views
4

Apr 25 (17:08)   07055/Kacheguda - Hisar Special Fare Summer Special | KCG/Kacheguda (5 PFs)
Riyaj_Ali
Riyaj_Ali   44 blog posts
Entry# 6043558            Tags   Past Edits
"काचीगुड़ा - हिसार- काचीगुड़ा" के मध्य विशेष ट्रेन वाया: नांदेड-पुर्णा-वसमत-हिंगोली-वाशिम-अकोला-भुसावल-सुरत-अहमदाबाद-मारवाड-जोधपुर-बिकानेर-चुरू।
Translate to English
Translate to Hindi
Info Update
97175 views
1

Jun 30 (11:36)   12468/Leelan SF Express | BKN/Bikaner Junction (6 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   521 blog posts
Entry# 6109761            Tags   Past Edits
In my opinion railways should do rake sharing arrangements or rsa between 12467/68 Jaipur Jaisalmer Leelan express and 14717/18 Bikaner Haridwar express and should also give 1 more icf rake to Bikaner Haridwar express to make it daily between Bikaner and Haridwar and after doing rsa between both trains railways should do primary maintenance of these trains at Lalgarh jn and rake sharing pattern should be like this -

14717-14718-14704-12467-12468-14703 then primary maintenance at Lalgarh jn of total 3 rakes of 12467/68 and 14703/04 + and 2 rakes of
...
more...
14717/18 = total 5 icf rakes.

And should also change the timings of 14717/18 or further information refer to these blogs 6023738 and 6023737 or refer to below given links -

/train/224818

/train/224820

/train/225349

/train/225346

Translate to English
Translate to Hindi
Page#    Showing 1 to 5 of 330 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy