Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 01:04:45 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 1581168-0

VST/Vijay Sota (2 PFs)
विजय सोता

Track: Double Electric-Line

Vijay Sota Railway Station (VST) is located in Madhya Pradesh, situated on State Highway 10. The station boasts 2 platforms, offering basic amenities like waiting rooms and ticket counters. Visitors can explore the nearby countryside, known for its rolling hills and serene landscapes.

Tourism

**Shri Hanuman Temple:** A revered temple dedicated to Lord Hanuman, known for its peaceful atmosphere.
**Shiva Mandir:** An ancient Shiva temple with intricate carvings and a serene ambiance.
**Jain Temple:** A beautiful Jain temple with intricate architecture and a serene atmosphere.
**Ram Mandir:** A popular temple dedicated to Lord Rama, known for its religious significance.
**Durga Temple:** A vibrant temple dedicated to Goddess Durga, known for its annual festivals.

Food

**Shree Krishna Restaurant:** Famous for its delicious North Indian vegetarian dishes.
**Dosa King:** Offers a variety of South Indian snacks and meals.
**The Vegetarian Hut:** Serves flavorful vegetarian thalis and street food.
**Sagar Restaurant:** Known for its fresh and flavorful vegetarian curries.
**Bhojanam:** A popular eatery for authentic vegetarian snacks and meals.

Station Address

State Highway 10
State: Madhya Pradesh

Elevation: 360 m above sea level
Type: Regular   Category: n/a
Zone: WCR/West Central   Division: Jabalpur


No Recent News for VST/Vijay Sota
Nearby Stations in the News
Number of Platforms: 2
Number of Halting Trains: 6
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station Forum

Page#    Showing 1 to 5 of 22 blog entries  next>>
0
updating ...
4 wishes
Happy Journey HJ शुभ यात्रा Forever MPS
Trip To PURI ( श्री जगन्नाथ जी धाम) Via Kolkata..........

154 Posts

FmtBlog
5749 views
0

Jun 17 (17:58)
DreamTrip22503^~
DreamTrip22503^~   43464 blog posts
Re# 6096476-155            Tags  
@DMYA: Damoy 6 km <--> 4 km @VST: Vijay Sota   57km/h   9m late
@VST: Vijay Sota &60 km/h slowing down here
Translate to English
Translate to Hindi

FmtBlog
5590 views
0

Jun 17 (18:03)
DreamTrip22503^~
DreamTrip22503^~   43464 blog posts
Re# 6096476-156            Tags  
@VST: Vijay Sota   26km/h   9m late
@VST: Vijay Sota &28 km/h crawling & skipping now
Translate to English
Translate to Hindi

More Posts
Rail News
19208 views
0

IR Affairs
ECR/East Central
May 04 (17:59)   Katni-Singrauli Railway Doubling Project Nears Completion, Boosting Coal Transportation and Passenger Service

AdittyaaSharma^~   72978 news posts
Entry# 6052997   News Entry# 550955         Tags   Past Edits
read full article... सिंगरौली-कटनी रेल मार्ग के दोहरीकरण का कार्य लगभग पूरा

The Indian Railways administration is nearing completion of the 240 km long Katni-Singrauli railway line doubling project. Approximately 210 km of doubling work has been completed. In April of this fiscal year, the West Central Railway management successfully completed 30 km of doubling work on this Rs. 2445 crore...
more...
project. The Chief Public Relations Officer of West Central Railway stated that the doubling work is being completed expeditiously under the direction of the General Manager, Bandopadhyay. Though the project is targeted for completion by 2026, 30 km of doubling between Vijay Sota and Beohari on the Katni-Singrauli rail section was completed in April due to the high volume of coal traffic and passenger demand. This will expedite the movement of express trains and coal freight on this route. Doubling of this line has been a long-standing need, but was delayed due to various reasons. The completion of this project will greatly facilitate the faster movement of trains on this rail route and will also increase railway revenue from coal transportation. The lack of doubling on the Singrauli-Katni rail route has been causing difficulties in coal transportation. This resulted in losses for the railways and disruptions in coal supply for NCL. The impact on coal transportation also affected power projects. With the completion of the doubling of this rail route, there will be an increase in coal transportation, which will benefit the railways economically.

Indian Railways administration almost complete kar diya hai 240 km long Katni-Singrauli railway line doubling project. Almost 210 km doubling work complete ho gaya hai. April maah mein is Rs. 2445 crore project ka 30 km doubling work complete karne mein West Central Railway management ko bada success mila. ...
more...
West Central Railway ka Chief Public Relations Officer ne bataya ki General Manager, Bandopadhyay ke direction mein railway line ke doubling ka kaam tez se ho raha hai. Though project 2026 tak complete hone ka target hai, Vijay Sota se Beohari tak 30 km doubling April maah mein complete ho gaya hai, kyunki ye coal ka busy route hai aur passengers ki demand bhi bahut hai. Isse express trains aur coal freight ka movement tez hoga. Is route ka doubling kaam bahut time se chahiye tha, par kuchh reason se railway administration nahin kar paya. Ab is project almost complete hone se is rail route par trains ka movement tez hoga aur coal transportation se railway ko aamdani bhi badhegi. Singrauli-Katni rail route ka doubling nahin hone se coal transportation mein problem aa rahi thi. Isse railways ko nuksan ho raha tha aur NCL ko bhi coal supply mein problem aa rahi thi. Coal transportation par asar se power projects bhi affected ho rahi thi. Ab is rail route ka doubling complete ho jaane se coal transportation mein tez aaegi, jisse railways ko aarthik laabh bhi hoga.
Rail News
46679 views
2

IR Affairs
WCR/West Central
Apr 24 (12:02)   New Railway Lines in Jabalpur Division See Rapid Progress, Driven by Model Code of Conduct

rhythmsofrail^~   881 news posts
Entry# 6042004   News Entry# 549574         Tags   Past Edits
read full article... Jabalpur News : सीआरएम ने परखी पटरियों की गुणवत्ता, अब नए ट्रैक पर दौड़ेंगी ट्रेनें

The construction of new railway lines in the Jabalpur Railway Division is progressing rapidly. The enforcement of the Model Code of Conduct during the Lok Sabha elections has helped expedite the process, as it has prevented protests against the laying of tracks. The expansion of the second new railway line on...
more...
the Katni-Singrauli rail section is almost 80% complete, with a total of 270 km of new railway line being built. The Commissioner of Railway Safety (CRS), Manoj Arora, inspected the new railway line from Vijaysota to Beohari. The CRS special train, which departed from Jabalpur, reached Katni and then proceeded to inspect the new line on the Singrauli route. The new tracks will increase the speed of trains. In addition to the Katni-Singrauli second railway line, the Jabalpur division is also working on the Katni-Bina third railway line, the Satna to Rewa second new railway line, and a new line between Satna and Khajuraho-Lalitpur. The General Manager of West Central Railway is continuously reviewing the quality and pace of these projects, which has resulted in the completion of 211 km of new railway lines in 2023-24, including 60 km of new lines, 47 km of doubling, and 104 km of tripling. The commissioning work on the Katni-Singrauli rail section between Vijaysota and Beohari stations under the New Rail Line Doubling Project has been completed, and the CRS has granted permission for operation. The CRS, Manoj Arora, inspected the commissioning between Vijaysota and Beohari stations on the Katni-Singrauli rail section. He ran the CRS Special train at a maximum speed of 105 km/hour on the Vijaysota-Chhataini-Beohari section to test the quality of the track. He was satisfied with all the technical works and granted permission for the operation of trains on the new railway line. The total distance between Vijaysota-Chhataini-Beohari stations is 30.117 km. During the inspection, the Chief Administrative Officer (Construction) Manoj Kumar Agarwal from the PMRE headquarters, other officers from the headquarters, and the Divisional Railway Manager, Vivek Sheel, and the Senior Divisional Engineer, along with other officers from the Jabalpur division, were also present.

Jabalpur Rail Mandal mein nayi rail line bichaane ka kaam bahut tez chal raha hai. Lok Sabha chunav ki aachar sanhita se bhi is kaam ko pura karne mein madad mil rahi hai. Jahan jahan rail line bichaane ka virodh ho raha tha, aachar sanhita ki wajah se ab virodh...
more...
nahin ho raha, isse line bichaane ka kaam aur tez ho gaya hai. Katni-Singrauli rail khand mein doosri nayi rail line ka vistaar lagbhag 80% pura ho chuka hai. Isme 270 km lambi nayi rail line banayi ja rahi hai. Is rail khand mein Vijaysota-Byauhari section tak bichayi gayi doosri nayi rail line ka nirdeshan karne CRM yaani Rail Suraksha Ayukt Manoj Arora pahunche. Jabalpur se CRM special train ravana hui thi, jo Katni pahuchi aur fir yahan se Singrauli route par nayi doosri line ke nirdeshan ka kaam shuru hua. Nayi patariyon se trains ki raftaar badhegi. Jabalpur Rail Mandal mein in dinon Katni-Singrauli doosri rail line, Katni-Bina teesri rail line aur Satna se Rewa doosri nayi rail line ka kaam chal raha hai. Wahin Satna se Khajuraho, Lalitpur ke beech bhi nayi rail line ka kaam tez chal raha hai. Is kaam ki gunvatta aur raftaar dono ki mahaprabhandak lagatar samikhya kar rahi hain, jiska asar yeh hua hai ki 2023-24 mein nayi line 60 km, doharikaran 47 km aur tiharikaran 104 km sahit kul 211 km lambi rail line bichayi gayi. Idhar New Rail Line Dohrikaran Pariyojana ke antargat Katni-Singrauli railkhand par Vijaysota se Byauhari stations ke beech commissioning kaam pura karke Rail Suraksha Ayukt dwara parichalan ke liye anumati mil gayi hai. Rail Suraksha Ayukt Manoj Arora ne Katni-Singrauli railkhand par Vijaysota se Byauhari stations ke beech commissioning ka nirdeshan kiya. Unhone Vijaysota-Chhataini-Byauhari section mein adhiktam 105 km/ghante ki gati se CRM special train chalayi aur track ki gunvatta parakhi. Jach ke dauraan ve sabhi takniki karyon se santusht hue aur unhone nayi rail line par trains ke parichalan ke liye anumati de di. Vijaysota-Chhataini-Byauhari stations ke beech kul 30.117 km ki duri hai. Nirdeshan ke dauraan PMRE mukhyaalay se mukhya prashasanik adhikari (nirman) Manoj Kumar Agarwal ke saath mukhyaalay ke anya adhikarigan aur Jabalpur mandal se mandal rail prabandhak shri Vivek Sheel aur varishth mandal engineer sahit anya mandal ke suraksha ke adhikari bhi maujud rahe.
Rail News
53114 views
0

IR Affairs
ECR/East Central
Apr 08 (11:07)   Train Cancellations and Special Train Operations in Dhanbad Due to Non-Interlocking Work

AdittyaaSharma^~   72978 news posts
Entry# 6023017   News Entry# 547593         Tags   Past Edits
read full article... कोलकाता-मदार, हावड़ा-भोपाल व कोलकाता-अहमदाबाद एक्स. रद्द रहेगी

Due to non-interlocking work at Chhattani, Byohari, Duwari Kalan, and Vijaysota stations in the Jabalpur Division, several trains passing through Dhanbad station have been canceled. These cancellations include the Kolkata-Madar, Howrah-Bhopal, and Kolkata-Ahmedabad trains in both directions, on various dates. Specifically, the 19608 Madar-Kolkata Express (April 8th and 15th),...
more...
19607 Kolkata-Madar Express (April 10th and 17th), 13025 Howrah-Bhopal Express (April 8th and 15th), 13026 Bhopal-Howrah Express (April 10th and 17th), 19413 Ahmedabad-Kolkata Express (April 10th to 17th), and 19414 Kolkata-Ahmedabad Express (April 12th and 19th) have been canceled. However, the railways have announced the operation of a special pair of trains between Madar and Howrah to accommodate passengers. Train number 09609 Madar-Howrah Special will operate from April 14th to 21st, while train number 09610 Howrah-Madar Special will operate from April 16th to 23rd. The 09609 Madar-Howrah Special will depart Madar station at 8:30 AM on April 14th and 21st, reaching Howrah station at 6:00 PM the next day, passing through Jaipur, Agra Fort, Kanpur, Prayagraj, and Pt. Deen Dayal Upadhyaya stations. The train will arrive at Koderma station at 10:15 AM and depart at 10:17 AM, reaching Dhanbad station at 12:30 PM and departing at 12:35 PM. The same schedule applies to the 09610 Howrah-Madar Special.

Jabalpur Division mein Chhattani, Byohari, Duwari Kalan aur Vijaysota stations par non-interlocking kaam hone ki wajah se Dhanbad station se jaane wali kaafi trains cancel kar di gayi hain. Railway ne yeh announcement kiya hai ki different dates par Kolkata-Madar, Howrah-Bhopal aur Kolkata-Ahmedabad trains dono taraf se cancel kar di gayi...
more...
hain. Specifically, 19608 Madar-Kolkata Express (April 8th aur 15th), 19607 Kolkata-Madar Express (April 10th aur 17th), 13025 Howrah-Bhopal Express (April 8th aur 15th), 13026 Bhopal-Howrah Express (April 10th aur 17th), 19413 Ahmedabad-Kolkata Express (April 10th se 17th tak), aur 19414 Kolkata-Ahmedabad Express (April 12th aur 19th) cancel rahegi. Par, passengers ki convenience ke liye, railways ne Madar aur Howrah ke beech special train pair chalane ka announcement kiya hai. Train number 09609 Madar-Howrah Special April 14th se 21st tak chalega aur train number 09610 Howrah-Madar Special April 16th se 23rd tak chalega. 09609 Madar-Howrah Special April 14th aur 21st ko Madar station se 8:30 AM par khulega aur Jaipur, Agra Fort, Kanpur, Prayagraj, aur Pt. Deen Dayal Upadhyaya stations se hota hua, next day sham 6:00 PM par Howrah station par pahunchega. Train Koderma station par 10:15 AM par pahunchega aur 10:17 AM par chalta hai, Dhanbad station par 12:30 PM par pahunchega aur 12:35 PM par chalta hai. Same schedule 09610 Howrah-Madar Special ke liye bhi hai.
Rail News
45488 views
0

IR Affairs
ECR/East Central
Apr 08 (06:28)   Weekly Trains Canceled Due to Non-Interlocking Work in Jabalpur Division

AdittyaaSharma^~   72978 news posts
Entry# 6022840   News Entry# 547574         Tags   Past Edits
read full article... अहमदाबाद, भोपाल व मदार की साप्ताहिक ट्रेनें 19 अप्रैल तक रद्द

Due to planned non-interlocking work at Byohari, Dubri Kalan, and Vijay Sota stations in the Jabalpur division, weekly trains running via Dhanbad, Barkakana, and Garhwa Road routes from Bhopal, Ahmedabad, and Madar will be canceled until April 19th. Affected trains include the 19608 Madar-Kolkata Express (April 8th and 15th), 19607 Kolkata-Madar...
more...
Express (April 11th and 18th), 13025 Howrah-Bhopal Express (April 8th and 15th), 13026 Bhopal-Howrah Express (April 10th and 17th), 19413 Ahmedabad-Kolkata Express (April 10th and 17th), 19414 Kolkata-Ahmedabad Express (April 12th and 19th), 18009 Santragachi-Ajmer Express (April 12th and 19th), and 18010 Ajmer-Santragachi Express (April 13th and 20th). The sudden cancellation of these trains during the wedding season may cause significant inconvenience to passengers.

Jabalpur division ke Byohari, Dubri Kalan, aur Vijay Sota stations pe non-interlocking ka kaam chal raha hai. Is wajah se Dhanbad, Barkakana, aur Garhwa Road route se chalne wali Bhopal, Ahmedabad, aur Madar ki saaptahkik trains 19 April tak cancel rahenge. Isme 19608 Madar-Kolkata Express (8 aur 15 April), 19607 Kolkata-Madar...
more...
Express (11 aur 18 April), 13025 Howrah-Bhopal Express (8 aur 15 April), 13026 Bhopal-Howrah Express (10 aur 17 April), 19413 Ahmedabad-Kolkata Express (10 aur 17 April), 19414 Kolkata-Ahmedabad Express (12 aur 19 April), 18009 Santragachi-Ajmer Express (12 aur 19 April), aur 18010 Ajmer-Santragachi Express (13 aur 20 April) trains bhi cancel hai. Shaadi season me achanak train cancel hone se passengers ko bahut pareshani ho rahi hai.
Page#    Showing 1 to 5 of 22 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy