Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 15:18:09 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 1505079-0

KRSL/Krishnashilla (1 PFs)
कृष्ण शिला
کرشن شیلا

Track: Double Electric-Line

Updated: Nov 01 2020 (20:32) by Nawaaz
Krishnashilla Railway Station (KRSL) is a small station situated in the Bina project area on NH 75 in Sonebhadra district, Uttar Pradesh. The station features a single platform and basic amenities. While the station itself is modest, it offers a glimpse into rural Indian life and provides access to nearby attractions.

Tourism

Maa Kali Temple: A popular temple dedicated to the Hindu goddess Kali.
Shiva Temple: A serene temple dedicated to Lord Shiva, offering peaceful surroundings.
Hanuman Temple: A temple dedicated to Lord Hanuman, known for its vibrant atmosphere.
Ram Mandir: A temple dedicated to Lord Rama, attracting devotees and tourists.
Jain Temple: A peaceful Jain temple with intricate architecture and beautiful idols.

Food

Annapurna: Famous for its delicious vegetarian thalis and street food.
Shanti Sagar: Offers a wide variety of vegetarian dishes, including South Indian specialties.
Sai Bhojanalaya: Known for its simple and flavorful vegetarian snacks and meals.
Govind Sweets: A popular spot for vegetarian sweets and snacks.
The Veggie Hut: Offers a contemporary vegetarian menu with a focus on healthy options.

Station Address

Bina project, NH 75,Sonebhadra
State: Uttar Pradesh

Elevation: 280 m above sea level
Type: Regular   Category: n/a
Zone: ECR/East Central   Division: Dhanbad


No Recent News for KRSL/Krishnashilla
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 2
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 2.2/5 (8 votes)
cleanliness - average (1)
porters/escalators - poor (1)
food - poor (1)
transportation - average (1)
lodging - poor (1)
railfanning - good (1)
sightseeing - average (1)
safety - average (1)

Station Forum

Page#    Showing 1 to 5 of 89 blog entries  next>>
Rail News
4859 views
0

Crime/Accidents
ECR/East Central
Jun 18 (17:59)   Mutilated Body of Trailer Driver Found on Railway Track Near Krishnashilla

AdittyaaSharma^~   73037 news posts
Entry# 6099113   News Entry# 556640         Tags   Past Edits
read full article... ट्रेलर चालक का रेल ट्रैक पर मिला क्षत-विक्षत शव

On Tuesday morning, the mutilated body of a trailer driver was found on the railway track in front of the Krishnashilla General Manager's office in the Bina Chowki area. The deceased has been identified as 30-year-old Manish Rawat, a resident of Semaria, Ramgarh, Madhya Pradesh. Local residents alerted the police, who...
more...
took possession of the body and initiated an investigation. A pant belonging to the deceased was found near the railway track, containing a trailer key, a mobile phone, and some cash. The police have seized these items and are investigating. Local residents reported that the deceased's mobile phone records show calls to Dial 112 and other numbers around 1 am. A relative of the deceased, who resides in the CHP Basti area of Bina, confirmed that Manish worked as a driver for a transporter and lived in his trailer. The Bina Chowki in-charge, Sanjay Singh, is investigating the case by gathering information from locals and relatives. A post-mortem examination has been ordered.

Mangalwar subah, Bina Chowki area mein, Krishnashilla General Manager office ke saamne, railway track pe, ek trailer driver ka body mila, jo ki bahut kharab halat mein tha. 30 saal ka Manish Rawat, Semaria, Ramgarh, Madhya Pradesh ka rahne wala tha, aur woh ek trailer chalaata tha. Local logon ne police...
more...
ko bataya aur police ne body ko leke jaanch shuru ki. Track ke paas, Manish ka pant mila jisme trailer ki chaabi, mobile, aur kuchh paise the. Police ne yeh sab cheezein leke jaanch karni shuru kar di. Logon ne bataya ki Manish ka mobile 1 am ke aaspas Dial 112 aur aur bhi number pe call kar raha tha. Bina ke CHP Basti area mein rehne wala Manish ka rishtedar ne bataya ki Manish ek transporter ka trailer chalaata tha aur woh trailer mein hi rehta tha. Bina Chowki ke in-charge, Sanjay Singh, logon aur rishtedaron se jaankari leke jaanch kar rahe hain. Body ka post-mortem karne ke liye Duddi CHC mein bhej diya gaya hai.
Rail News
41284 views
0

Commentary/Human Interest
ECR/East Central
Feb 07 (21:33)   Commissioner of Railway Safety Inspects Newly-Doubled Rail Sections in Dhanbad

rhythmsofrail^~   881 news posts
Entry# 5963857   News Entry# 540485         Tags   Past Edits
read full article... रेल संरक्षा आयुक्त ने किया नए दोहरीकृत रेलखंड का निरीक्षण

The Commissioner of Railway Safety (CRS) for the Eastern Circle, Kolkata, Suvomoy Mitra, inspected two newly-doubled rail sections in Dhanbad division on Tuesday. The sections inspected were the 12 km long Mahuaria-Duddhinagar section, part of the Ramna-Singrauli doubling project, and the 5.56 km long Krishnashilla-Anpara Road section, part of the Karaila...
more...
Road-Shaktinagar doubling project. The CRS also conducted speed trials on both sections. Once the CRS approves, train operations will commence on these sections. The 160 km long Ramna-Singrauli doubling project has 132 km completed and the Mahuaria-Duddhinagar inspection brings the total completed to 144 km. Only the 10 km long Renukut-Jogidih section and 6 km long Obra-Fafrakund section remain to be completed. Similarly, the 32 km long Karaila Road-Shaktinagar doubling project has 20 km completed and the Krishnashilla-Anpara Road inspection brings the total completed to approximately 26 km. Only the section from Anpara Road to Anpara remains to be completed.

Kolkata ke Eastern Circle ke Commissioner of Railway Safety (CRS), Suvomoy Mitra, ne Mangalwar ko Dhanbad division mein do naye double kiye gaye rail sections ka inspection kiya. Jin sections ka inspection kiya gaya, woh hain 12 km lamba Mahuaria-Duddhinagar section, jo ki Ramna-Singrauli doubling project ka hissa hai, aur 5.56...
more...
km lamba Krishnashilla-Anpara Road section, jo ki Karaila Road-Shaktinagar doubling project ka hissa hai. CRS ne dono sections pe speed trials bhi kiye. CRS ki approval milne ke baad, in sections pe train operations shuru ho jayenge. 160 km lamba Ramna-Singrauli doubling project mein se 132 km ka kaam pehle hi complete ho chuka hai aur Mahuaria-Duddhinagar inspection se ab tak complete kaam 144 km ho gaya hai. Sirf 10 km lamba Renukut-Jogidih section aur 6 km lamba Obra-Fafrakund section complete hone baaki hai. Issi tarah, 32 km lamba Karaila Road-Shaktinagar doubling project mein se 20 km ka kaam pehle hi complete ho chuka hai aur Krishnashilla-Anpara Road inspection se ab tak complete kaam takreeban 26 km ho gaya hai. Sirf Anpara Road se Anpara tak ka section complete hone baaki hai.
Rail News
23926 views
0

IR Affairs
ECR/East Central
Feb 06 (18:16)   Railway Safety Commissioner to Inspect Shaktinagar-Karaila Road Doubling Project

AdittyaaSharma^~   73037 news posts
Entry# 5962940   News Entry# 540272         Tags   Past Edits
read full article... कृष्णशीला-अनपरा रोड दोहरीकरण की जांच आज

The Commissioner of Railway Safety (CRS) will inspect the remaining 10 kilometers of the Shaktinagar-Karaila Road railway line doubling project on Wednesday. The inspection will start from Krishnashilla railway station and end at the newly built Point Halt station, Anpara Road. The CRS, along with the Divisional Railway Manager of East...
more...
Central Railway, Dhanbad, Kamal Kishore Sinha, will inspect the railway track and give the green signal for the completion of the project. The doubling project is currently stalled due to a dispute regarding compensation for displaced residents near the Bajrang Nagar area. However, the CRS is expected to approve the doubling of 5 kilometers of the project. The doubling of the railway line between Karaila Road and Anpara was approved by the CRS a year ago. The Commissioner of Railway Safety will also inspect the doubling work between Mahuriya and Dudhinagar before the Shaktinagar-Karaila Road project. The construction of the Bajrang Nagar bridge, which had been halted for a long time due to protests by displaced residents, has resumed on Tuesday after an agreement was reached between the residents and railway officials in the presence of the Sub-Divisional Magistrate, Dudhi.

CRS Wednesday ko Shaktinagar-Karaila Road railway line doubling project ka bacha hua 10 kilometers ka inspection karega. Inspection Krishnashilla railway station se start hoga aur newly built Point Halt station, Anpara Road par end hoga. CRS, East Central Railway, Dhanbad ke Divisional Railway Manager, Kamal Kishore Sinha ke saath, railway track...
more...
ka inspection karega aur project ke completion ke liye green signal dega. Doubling project Bajrang Nagar area mein displaced residents ko compensation de ne ke baare mein dispute ki wajah se stalled hai. Lekin, CRS 5 kilometers ke doubling project ko approve kar sakta hai. Karaila Road aur Anpara ke beech railway line ka doubling project CRS ne ek saal pehle approve kar diya tha. Commissioner of Railway Safety Shaktinagar-Karaila Road project se pehle Mahuriya aur Dudhinagar ke beech doubling work ka bhi inspection karega. Bajrang Nagar bridge ka construction, jo ki displaced residents ke protests ki wajah se lamba time se rukha hua tha, Sub-Divisional Magistrate, Dudhi ki maujoodgi mein residents aur railway officials ke beech agreement hone ke baad Mangalwar se start ho gaya hai.
Rail News
35001 views
2

IR Affairs
ECR/East Central
Jan 28 (17:56)   New Anpara Road Railway Station Opens to Facilitate Coal Rake Movement

AdittyaaSharma^~   73037 news posts
Entry# 5954767   News Entry# 539022         Tags   Past Edits
1 compliments
Useful
read full article... अनपरा रोड बना नया रेलवे स्टेशन

A new railway station, Anpara Road, has been opened in Anpara, under the jurisdiction of East Central Railway. It is located near Kahuwanaala, between the existing stations of Krishnashilla and Anpara, which are roughly ten kilometers apart. Although the station is temporary, housed in a makeshift building, it does not offer...
more...
any amenities for passengers. The construction of a bridge near Anpara is stalled due to court orders regarding land acquisition for displaced people, hindering the doubling of the 30 km railway line between Shaktinagar and Karaila. The Anpara Road station, only five kilometers from the original Anpara station, acts as a temporary halt to enable the doubling of the remaining five km and facilitate the movement of coal rakes. Currently, three to four coal rakes face delays due to the incomplete doubling project, and this temporary station will allow for increased train movements.

East Central Railway ke Anpara me ek aur naya railway station, Anpara Road, start ho gaya hai. Ye Krishnashilla aur Anpara stations ke beech me, jo ki lagभग दस kilometers दूर हैं, Kahuwanaala ke paas temporary building me hai. Passengers ke liye koi सुविधा nahi hai. Anpara ke paas ek bridge...
more...
banne ka काम court mein land acquisition ke case ki wajah se रुक गया hai, jiske karan Shaktinagar aur Karaila ke beech ki 30 km line ka double karne ka काम bhi रुक गया है. Anpara Road station, jo ki Anpara station se 5 kilometers दूर है, temporary halt ke तौर पर बनाया गया है. Ye باقی 5 km line को double karne में मदद करेगा और coal rakes ko आने जाने में आसानी होगी. Abhi, तीन से चार coal rakes, line double nahi hone की वजह से delay ho rahe हैं, aur इस temporary station से ये delay कम होगा.

More Posts
Rail News
39422 views
0

IR Affairs
ECR/East Central
Jan 29 (08:24)   Doubling of Katni-Garhwa Railway Line Over 80% Complete, Facing Challenges

AdittyaaSharma^~   73037 news posts
Entry# 5955129   News Entry# 539094         Tags   Past Edits
read full article... यात्री ट्रेन सुविधाओं में शीघ्र इजाफे की उम्मीद

The doubling of the 465 km railway line between Katni and Garhwa, started in 2016-17, is over 80% complete (358 km). Railway officials anticipate completion of the remaining work within six months. The electrification and doubling will benefit the region by providing more passenger train services. Doubling efforts...
more...
are facing challenges. The 78 km doubling in the Singrauli-Katni section is delayed due to the Sanjay Tiger Reserve. The National Board of Wildlife is yet to approve the required forest clearance. Railway Board has completed a final location survey for an alternative alignment. The project's DPR is being prepared for speedy completion. Of the 261 km doubling in the region, 211.36 km is complete. West Central Railway's Chief Public Relations Officer confirmed that 11.90 km between Khanna Banjari and Mahroi, 28.65 km between Niwas Road and Saraiagram, and 19.10 km between Mahroi and Vijay Sotan were completed by December. The 63 km doubling between Singrauli and Chopan is stalled due to the construction of a bridge at the Rihand railway bridge near the Obra Dam. Out of the 141 km between Chopan and Garhwa Road, 23 km has been impacted by the need to build bridges, with completion expected by March. The 32 km doubling between Shaktinagar and Karaila Road is almost complete. However, the 10 km doubling between Anpara and Krishnashilla is stalled in court due to compensation issues for those displaced near the Anpara bridge.

Katni aur Garhwa ke beech 465 km railway line ka doubling 2016-17 mein shuru hua tha aur 80% (358 km) se zyada kaam pura ho chuka hai. Rail officers ka kehna hai ki baki kaam bhi chhe mahine mein pura ho jayega. Electricified doubling se yaha ke logo ko bahut saare...
more...
important passenger train services milenge. Doubling mein kuchh problems bhi aa rahi hain. Singrauli-Katni section mein 78 km ka doubling Sanjay Tiger Reserve ki wajah se ruk gaya hai. National Board of Wildlife se forest clearance ka maamla pendinge hai. Railway Board ne ek alternative alignment ka final location survey complete kar liya hai. Project ka DPR banaya ja raha hai aur kaam jaldi complete karne ki koshish ki ja rahi hai. Is region mein 261 km doubling mein se 211.36 km pura ho chuka hai. West Central Railway ke Chief Public Relations Officer ne confirm kiya hai ki Khanna Banjari aur Mahroi ke beech 11.90 km, Niwas Road aur Saraiagram ke beech 28.65 km aur Mahroi aur Vijay Sotan ke beech 19.10 km ka kaam December tak pura ho chuka tha. Singrauli aur Chopan ke beech 63 km doubling Obra Dam ke paas Rihand railway bridge par bridge banane ki wajah se ruk gaya hai. Chopan aur Garhwa Road ke beech 141 km mein se 23 km mein kuchh bridges banane hain aur officers ka kehna hai ki ye kaam March tak pura ho jayega. Shaktinagar aur Karaila Road ke beech 32 km doubling almost complete ho chuka hai. Lekin Anpara aur Krishnashilla ke beech 10 km doubling Anpara bridge ke paas displacement ki wajah se court mein pendinge hai.
Page#    Showing 1 to 5 of 89 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy