Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 09:41:19 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

KHM/Kusmhi (2 PFs)
कुसम्ही
کوسمہی

Track: Triple Electric-Line

Updated: Jan 13 2023 (20:44) by RailCraze^~
Kusmhi Railway Station (KHM) is located on the Gorakhpur-Varanasi line, with 2 platforms. The station offers basic amenities like waiting rooms and water facilities. It is well-connected to nearby villages and towns by auto-rickshaws and local buses, making it an important transportation hub for the region.

Tourism

**Ramnagar Kajraha Temple** - A revered Hindu temple dedicated to Lord Ram.
**Kusmhi Masjid** - A historical mosque with intricate architecture.
**Gorakhpur Hanuman Temple** - A famous temple dedicated to Lord Hanuman, located in Gorakhpur.
**Gorakhpur Mahakaleshwar Temple** - An ancient Shiva temple known for its religious significance.
**Gorakhpur Gurdwara** - A Sikh gurdwara located in Gorakhpur.

Food

**Shree Krishna Restaurant** - Offers a variety of vegetarian thalis and snacks.
**Jain Bhojanalaya** - A pure vegetarian restaurant with a wide range of dishes.
**Aahar Restaurant** - Popular for its vegetarian street food and snacks.
**Sagar Restaurant** - Serves delicious vegetarian curries and rice dishes.
**Govind Bhojanalaya** - A budget-friendly vegetarian eatery with a variety of options.

Station Address

Station Road, Kusmahi, Ramnagar Kajraha, Gorakhpur Bypass, Gorakhpur, 273202
State: Uttar Pradesh

Elevation: 84 m above sea level
Type: Regular   Category: NSG-6
Zone: NER/North Eastern   Division: Varanasi


No Recent News for KHM/Kusmhi
Nearby Stations in the News
Number of Platforms: 2
Number of Halting Trains: 7
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 2.5/5 (16 votes)
cleanliness - average (2)
porters/escalators - poor (2)
food - poor (2)
transportation - good (2)
lodging - good (2)
railfanning - excellent (2)
sightseeing - poor (2)
safety - poor (2)

Station Forum

Page#    Showing 1 to 5 of 104 blog entries  next>>
General Travel
12807 views
4

Sep 01 (17:09)   GKP/Gorakhpur Junction (10 PFs)
Ehtram Husain~
Ehtram Husain~   21953 blog posts
Entry# 6175439            Tags   Past Edits
2 compliments
Great Great
Automatic Block Signalling Section of Ner ...(commissioned)
Gorakhpur Cantt -Cahuri Chaura .
Jagatbela - Maghar ...
Translate to English
Translate to Hindi

More Posts
Rail News
47617 views
0

IR Affairs
NER/North Eastern
Jul 24 (11:50)   Northeast Railway Zone to Receive INR 600 Crore Boost for New Lines and Track Upgrades

AdittyaaSharma^~   73037 news posts
Entry# 6134816   News Entry# 561809         Tags   Past Edits
read full article... बढ़ेगा एनईआर का बजट, दो से तीन दिन में साफ हो जाएगी तस्वीर

The Indian Railways is expected to receive an additional INR 600 crore budget for the Northeast Railway (NER) zone. This will boost the total NER budget to around INR 600 crore, up from the INR 5813.20 crore allocated in the interim budget. This additional funding will support the construction of new...
more...
railway lines, including the Khalilabad-Shravasti-Balrampur line (55 km), the Sahjanwa-Dohrighat line (81 km), and the Anandnagar-Ghughli line. The NER has received INR 1057 crore for doubling and tripling tracks, which will accelerate the development of the Gorakhpur Cantt.-Valmikinagar, Bhatni-Aunrihar, and Kusmhi-Gorakhpur-Domingarh lines. The Khalilabad-Shravasti-Balrampur line will be constructed in three phases, with the first phase (Khalilabad-Bansi, 27 km) scheduled for completion in March 2025. The Sahjanwa-Dohrighat line, with trains designed to run at 160 km/h, will also be built in three phases, culminating in the completion of the final phase (Golabazar-New Dohrighat, 25.5 km) in March 2027.

Indian Railways ko Northeast Railway (NER) zone ke liye INR 600 crore ka additional budget milne ki ummeed hai. Isse NER ka total budget INR 600 crore tak badh jaayega, jo ki interim budget mein allocate kiya gaya INR 5813.20 crore se zyada hai. Is additional funding se new railway lines...
more...
ka construction hoga, jisme Khalilabad-Shravasti-Balrampur line (55 km), Sahjanwa-Dohrighat line (81 km), aur Anandnagar-Ghughli line bhi shamil hai. NER ko doubling aur tripling tracks ke liye INR 1057 crore mila hai, jisse Gorakhpur Cantt.-Valmikinagar, Bhatni-Aunrihar, aur Kusmhi-Gorakhpur-Domingarh lines ka development fast hoga. Khalilabad-Shravasti-Balrampur line teen phases mein banaye jaayegi, pehla phase (Khalilabad-Bansi, 27 km) March 2025 mein complete hone wala hai. Sahjanwa-Dohrighat line, jisme trains 160 km/h ki speed se chalengi, bhi teen phases mein banaye jaayengi, jiska final phase (Golabazar-New Dohrighat, 25.5 km) March 2027 mein complete hoga.
Rail News
16375 views
0

IR Affairs
NER/North Eastern
Jul 05 (12:06)   Design Flaw Found in Gorakhpur's New Satellite Station: Track Spacing Too Narrow

AdittyaaSharma^~   73037 news posts
Entry# 6115056   News Entry# 559005         Tags   Past Edits
read full article... कैंट में मानक से कम है ट्रैक के बीच का गैप

A newly constructed satellite station in Gorakhpur, known as Cantt Satellite Station, has been found to have a crucial design flaw. The distance between tracks 6-7 and 8-9 is less than the required 5.3 meters, measuring 4.59 meters and 4.43 meters respectively. This shortfall prevents the installation of water hydrants (coach...
more...
water filling machines) between the tracks. The problem arose because these tracks existed before the station became a satellite, so hydrants were not considered necessary at the time. The station, completed this year, has been instrumental in reducing the load on Gorakhpur Junction and improving train punctuality. However, the track spacing issue may require underground piping for water supply to coaches. The station handles roughly 200 trains daily, including 150 passenger trains.

Gorakhpur mein, Cantt Satellite Station, jo ki ek nayi banayi gayi station hai, usmein ek bada design ka flaw mila hai. Track 6-7 aur 8-9 ke beech ka distance, required 5.3 meter se kam hai. Yeh distance 4.59 meter aur 4.43 meter hai. Isse track ke beech mein water hydrant (coach...
more...
water filling machine) lagne mein problem aa rahi hai. Yeh problem isliye aayi kyuki yeh track station ke satellite banne se pehle se hi the, to hydrant ki jarurat nahi maani gayi thi. Yeh station, is saal complete hua, aur isne Gorakhpur Junction ka load kam karne aur train ki punctuality badhane mein madad ki hai. Lekin track spacing ka issue se water supply to coaches ke liye underground piping ki jarurat pad sakti hai. Station per har din around 200 train aati hai, jisme 150 passenger trains shamil hai.
Rail News
45998 views
0

IR Affairs
NER/North Eastern
Jun 28 (12:24)   Domingarh Station to Become Halt to Improve Train Efficiency in Gorakhpur

AdittyaaSharma^~   73037 news posts
Entry# 6108100   News Entry# 558019         Tags   Past Edits
read full article... डोमिनगढ़ स्टेशन का बदलेगा स्वरूप, हाल्ट बनाने की तैयारी

The Domingarh railway station in Gorakhpur is set to be converted into a halt, meaning no trains will stop there. This change is being implemented to improve train efficiency as the station's limited space hinders the construction of new tracks. The move will be implemented after the completion of the third...
more...
line between Gorakhpur and Barabanki. To accommodate the change, trains will stop at Jagatbela instead of Domingarh. The construction of the third line is progressing, with sections between various stations already being built and trial runs completed. A feasibility study for a new 85-km long third line between Khalilabad and Baitalpur is underway, with a budget of 1.20 crores already allocated. The third line will allow for increased train speed and frequency, eliminating unnecessary stops at Outer, Domingarh, Nakaha, and Cantt stations for passenger trains traveling between Lucknow, Gorakhpur, and Bihar. This will improve the overall efficiency of the Barabanki-Gorakhpur-Chhapra rail route, which is currently operating with 1.5 times its capacity, causing delays and hindering the operation of new trains.

Gorakhpur mein Domingarh station ko halt banaane ki plan hai. Yeh change Gorakhpur se Barabanki tak ki third line banne ke baad implement hoga. Domingarh mein space kam hone ki wajah se new tracks nahi ban pa rahe hai. Isliye station ko halt banaaya ja raha hai, jisse train ki efficiency...
more...
badhegi. Trains ab Domingarh mein nahi rukengi, aur Jagatbela station pe rukengi. Third line ka construction chal raha hai aur kuchh sections pe work complete ho gaya hai. Khalilabad se Baitalpur tak 85km long third line banane ke liye feasibility study chal rahi hai, jiske liye 1.20 crore ka budget bhi approve ho gaya hai. Third line se train ki speed aur frequency badhegi, aur Lucknow, Gorakhpur aur Bihar ke beech chalne wali passenger trains Outer, Domingarh, Nakaha aur Cantt stations pe rukenge nahi. Yeh change Barabanki-Gorakhpur-Chhapra rail route ki efficiency badhayega, jisko abhi 1.5 times its capacity pe run kiya ja raha hai. Is wajah se trains late chal rahi hain aur new trains bhi start nahi ho pa rahi hain.
Rail News
34647 views
1

IR Affairs
NER/North Eastern
Jun 21 (00:08)   Barhni to Become New Train Hub in Gorakhpur Region, Reducing Load on Gorakhpur Junction

AdittyaaSharma^~   73037 news posts
Entry# 6101543   News Entry# 557041         Tags   Past Edits
read full article... बढ़नी से चार जुलाई से चलेंगी ट्रेनें

Starting July 4th, trains will operate from Barhni station, beginning with the Gorakhpur-Narkatiaganj passenger train (train number 05040). This is aimed at reducing the load on Gorakhpur Junction, which currently handles 160 trains and 50 freight trains daily. The pressure on Gorakhpur Junction has been exacerbated by special trains, leading to...
more...
delays and overcrowding. Barhni has been chosen as an Amrit Bharat station and is undergoing redevelopment with a 15.05 crore rupees allocation. The Dadar Express, currently operating from Gorakhpur, is also proposed to run from Barhni.

4 July se Barhni station se trains chalna start ho jaayega. Pehli train hogi Gorakhpur-Narkatiaganj passenger (train number 05040). Ye Gorakhpur Junction ka load kam karne ke liye hai, jahan roz 160 trains aur 50 freight trains chalti hai. Gorakhpur Junction pe special trains ki wajah se bahut pressure hai, isse...
more...
delays aur overcrowding ho raha hai. Barhni ko Amrit Bharat station banaya ja raha hai aur iske redevelopment ke liye 15.05 crore rupees allocate kiya gaya hai. Gorakhpur se chalne wali Dadar Express ko bhi Barhni se chalane ka proposal hai.
Page#    Showing 1 to 5 of 104 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy