Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Oct 18 19:55:34 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Close-up; Platform Pic; Large Station Board;
Entry# 3750466-0
Medium; Platform Pic; Large Station Board;
Entry# 3750466-0
Night Pic; Platform Pic; Small Station Board;
Entry# 3750466-0

TLO/Talandu (3 PFs)
तालाण्डु
তালাণ্ডু

Track: Triple Electric-Line

Updated: Mar 14 2023 (07:47) by Manoj851120~
Talanda Railway Station (TLO) is located on the Howrah-Bardhaman main line in Hooghly district, West Bengal. It's a small station with three platforms and basic amenities like waiting rooms and ticket counters. The station is known for its proximity to the scenic Talanda village, which boasts a number of traditional Bengali houses and temples.

Tourism

Kalighat Temple: A renowned Hindu temple dedicated to Goddess Kali, located in Kolkata.
Dakshineswar Kali Temple: Another famous temple dedicated to Goddess Kali, situated on the banks of the Ganges river.
Belur Math: A spiritual center and temple of the Ramakrishna Mission, located near Kolkata.
Tarakeswar Temple: A temple dedicated to Lord Shiva, known for its religious significance and unique architecture.
Chandannagar Church: A historic church built during the French colonial era, known for its beautiful architecture.

Food

Amul Restaurant: A popular spot for traditional Bengali vegetarian dishes.
The Dhaba: Offers a variety of vegetarian snacks and meals at affordable prices.
Bhojanalaya: A clean and hygienic vegetarian eatery with a wide selection of dishes.
Sagar Restaurant: Known for its delicious vegetarian thalis and south Indian snacks.
The Veggie Hut: A small stall serving fresh and flavorful vegetarian street food.

Station Address

Talandu - Sultangacha Road, Pin - 712148, Dist - Hooghly
State: West Bengal

Elevation: 27 m above sea level
Type: Regular   Category: SG-3
Zone: ER/Eastern   Division: Howrah


No Recent News for TLO/Talandu
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 2
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 1.9/5 (8 votes)
cleanliness - poor (1)
porters/escalators - poor (1)
food - poor (1)
transportation - poor (1)
lodging - poor (1)
railfanning - average (1)
sightseeing - excellent (1)
safety - poor (1)

Station Forum

Page#    Showing 1 to 5 of 13 blog entries  next>>
Info Update
272761 views
10

Sep 02 2020 (20:52)   MUG/Magra (5 PFs)
SAPTARSHI^~
SAPTARSHI^~   26796 blog posts
Entry# 4702783            Tags   Past Edits
CRS Inspection of "New 3rd line between Magra & Khanyan" of Howrah-Barddhaman Mainline section was conducted on 02.09.20 (Today)
• Power No.11545/HWH (at HWH end) + 37014/HWH (at DLI end) powered Safety Commissioner's train.
• Running image provided.
Translate to English
Translate to Hindi

More Posts
General Travel
198306 views
0

Feb 27 2020 (13:23)   13007/Udyan Abha Toofan Express (PT) | MUG/Magra (5 PFs)
guest
Entry# 4577955            Tags   Past Edits
#NI
Translate to English
Translate to Hindi
Info Update
1186222 views
1

Sep 01 2018 (13:13)   13106/Ballia - Sealdah Express | DBP/Debipur (3 PFs)
Anupam Enosh Sarkar^~
Anupam Enosh Sarkar^~   32882 blog posts
Entry# 3768898            Tags   Past Edits
Power & Traffic Block for Commissioning of 3rd Line in Howrah-Barddhaman Main
Translate to English
Translate to Hindi

More Posts
Info Update
150820 views
0

Sep 27 2018 (20:10)   15052/Purvanchal Express (Via Narkatiaganj) | TLO/Talandu (3 PFs)
AmishKumar^~
AmishKumar^~   12540 blog posts
Entry# 3846469            Tags   Past Edits
10 days regulations of train for development work
Translate to English
Translate to Hindi
General Travel
873191 views
21

★★★
Jun 28 2017 (11:37)   BWN/Barddhaman Junction (8 PFs)
Shoubhik~
Shoubhik~   9299 blog posts
Entry# 2335081            Tags   Past Edits
STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN

•> Between BANDEL and ADISAPTAGRAM - No work has been done
•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on
•>
...
more...
Between TALANDU and KHANYAN - Poles have been erected but no track has been laid
•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line
•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground is going on for the rest of the portion between these two stations.
•> Between BAGILA and MEMARI - Work has been hindered after Bagila due to a small river, a bridge is getting constructed on this river, no sign of Tripling is there just before and after Memari
•> Between MEMARI and PALSIT - Only fencing and levelling of ground at some places has been done but nowhere track has been laid
•> RASULPUR and PALSIT - No sign of Tripling can be seen in these two stations
•> NIMO - Work has recently started in this station
•> At some stations like BAINCHI, one more platform is under construction

Pic 1 to 3 - from adisaptagram to talandu
Pic 4 to 7 - from talandu to khanyan
Pic 8 to 11 - entering khanyan
Pic 12 to 14 - remodelling of station at Khanyan
Pic 15 to 18 - tripling along with electrification done after Khanyan
Pic 19 to 22 - remodelling of station at Simlagarh
Pic 23 - remodelling of station at Bainchigram
Pic 24 - entering Bainchi
Pic 25, 26 - new platform getting constructed at Bainchi
Pic 27 - after Bainchi
Pic 28 to 30 - after Debipur, electrification is done for a certain distance but no track has been laid
Pic 31,32 - levelling of ground going on between Debipur and Bagila
Pic 33, 34 - a bridge getting constructed after Bagila
Pic 35 - between Bagila and Memari
Pic 36 to 38 - No work has been done (except fencing aya some places) just before and after Memari
Pic 39 - Work has just started at NIMO halt
Pic 40 to 43 - fencing and levelling of ground going on between Nimo and Rasulpur
Pic 44, 45- no sign of tripling at Rasulpur
Pic 46, 47 - levelling of ground going on between Rasulpur and Palsit
Pic 48 - no sign of work at Palsit
Pic 49 to 51 - a view of HWH BWN chord line from HWH BWN main line

#SC17

Translate to English
Translate to Hindi

More Posts
Page#    Showing 1 to 5 of 13 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy