Please wait...
SUBR/Subhagpur (3 PFs)सुभागपुर
سوبھاگپور
Track: Single Electric-Line
Station Address NH 330, Gonda Balrampur Road, Distt.- Gonda, Pin - 271002 State: Uttar Pradesh
Elevation: n/a
Type:
Regular Category:
n/a Zone:
NER/North Eastern Division:
Lucknow NER Number of Platforms: 3 Number of Halting Trains: 4 Number of Originating Trains: 0 Number of Terminating Trains: 0
Rating: 2.8 /5 (8 votes)
cleanliness - excellent (1)
porters/escalators - poor (1)
transportation - average (1)
railfanning - excellent (1)
sightseeing - average (1)
Picture & Video Gallery
15069/Grkhpr Ashbgh BMJ/Brdgmngnj Bridgemanganj To Gonda Jn. Journey बृजमनगंज से गोंडा जंक्शन रेल सफर|...
05447Y/Grkhpr Gnd SUBR/Sbhgpr Gorakhpur- Gonda Express Special At Subhagpur Railway station..RSA With Varanasi- Gorakhpur...
SUBR/Sbhgpr Energization of Subhagpur (Gonda) - Anand Nagar rail line of (Ner...
GD/Gnd CRS Inspection of Gonda Jn-Subhagpur Rail Electrification has been done and...
SUBR/Sbhgpr रेल संरक्षा आयुक्त, उत्तर पूर्वी सर्किल द्वारा पूर्वोत्तर रेलवे के लखनऊ...
22199/Sshsn Exprss GD/Gnd E-Loco trial done successfully of Gonda-Subhagpur Electrification[1st Phase of Gonda-Gorakhpur Loopline...
15081/Grkhpr Gmt SUBR/Sbhgpr Electrification of 1st phase of Gonda-Gorakhpur Loop line(i.e Gonda Jn to...
GD/Gnd Construction of 2 new platform (PF-7&8) at old malgodam and 1...
14213/Vrns Bhrch GD/Gnd Two no. of washing pit 650-650m length and over head water...
75128/Gnd Grkhpr SUBR/Sbhgpr Approx all poles are straightened out and source says it is...
GD/Gnd Construction of 2 Nos. of Washing Pit and a Over Headed...
75128/Gnd Grkhpr GD/Gnd 1- Foundation of Rail Electrification of Gonda...
SUBR/Sbhgpr Subhagpur - Panchperwa the entire North Eastern Railway BG route is...
15322/Kplvst MG Exprss GD/Gnd Meter Gauge pictures from Gonda Junction - March 2010Video Link: click...
04200K/Sshsn SF Spcl BLP/Blrmpr Balrampur to Gonda Junction Latest Full Journey video ... Don't Miss...
GD/Gnd CRS Inspection of Gonda Jn-Subhagpur Rail Electrification has been done and...
SUBR/Sbhgpr रेल संरक्षा आयुक्त, उत्तर पूर्वी सर्किल द्वारा पूर्वोत्तर रेलवे के लखनऊ...
15081/Grkhpr Gmt SUBR/Sbhgpr Electrification of 1st phase of Gonda-Gorakhpur Loop line(i.e Gonda Jn to...
15706/Chmprn Hmsfr Exprss SUBR/Sbhgpr पहली बार स्लीपर कोच के साथ चली गाड़ी संख्या 15706 कटिहार...
GD/Gnd Construction of 2 new platform (PF-7&8) at old malgodam and 1...
14213/Vrns Bhrch GD/Gnd Two no. of washing pit 650-650m length and over head water...
75128/Gnd Grkhpr SUBR/Sbhgpr Approx all poles are straightened out and source says it is...
GD/Gnd Construction of 2 Nos. of Washing Pit and a Over Headed...
75128/Gnd Grkhpr GD/Gnd 1- Foundation of Rail Electrification of Gonda...
GD/Gnd Speed trial in Subhagpur Pachperwa section of Gonda Gorakhpur loop line...
15068/Bndr Trmns GD/Gnd Gonda Diesel Shed to Basti | Full Train Journey VlogVideo Link:...
SUBR/Sbhgpr subhagpur
GD/Gnd CRS Inspection of Gonda Jn-Subhagpur Rail Electrification has been done and...
SUBR/Sbhgpr रेल संरक्षा आयुक्त, उत्तर पूर्वी सर्किल द्वारा पूर्वोत्तर रेलवे के लखनऊ...
15081/Grkhpr Gmt SUBR/Sbhgpr Electrification of 1st phase of Gonda-Gorakhpur Loop line(i.e Gonda Jn to...
GD/Gnd Construction of 2 new platform (PF-7&8) at old malgodam and 1...
GD/Gnd Construction of 2 new platform (PF-7&8) at old malgodam and 1...
14214/Bhrch Vrns GD/Gnd Construction of rake handling platform at Old Malgodam(New Terminal Station) of...
75128/Gnd Grkhpr SUBR/Sbhgpr Approx all poles are straightened out and source says it is...
GD/Gnd Construction of 2 Nos. of Washing Pit and a Over Headed...
05447Y/Grkhpr Gnd SUBR/Sbhgpr Gorakhpur- Gonda Express Special At Subhagpur Railway station..RSA With Varanasi- Gorakhpur...
05448Y/Gnd Grkhpr BLP/Blrmpr LATEST UPDATE Of Gonda -Gorakhpur LOOP LINE ELECTRIFICATION ,BALRAMPUR to JHARKANDI,BALRAMPUR...
SUBR/Sbhgpr subhagpur
GD/Gnd CRS Inspection of Gonda Jn-Subhagpur Rail Electrification has been done and...
BRK/Bhrch Media release by NER regarding electrification. ...
15081/Grkhpr Gmt SUBR/Sbhgpr Electrification of 1st phase of Gonda-Gorakhpur Loop line(i.e Gonda Jn to...
GD/Gnd Construction of 2 new platform (PF-7&8) at old malgodam and 1...
14213/Vrns Bhrch GD/Gnd Two no. of washing pit 650-650m length and over head water...
14214/Bhrch Vrns GD/Gnd Construction of rake handling platform at Old Malgodam(New Terminal Station) of...
75128/Gnd Grkhpr SUBR/Sbhgpr Approx all poles are straightened out and source says it is...
GD/Gnd Construction of 2 Nos. of Washing Pit and a Over Headed...
05447Y/Grkhpr Gnd SUBR/Sbhgpr Gorakhpur- Gonda Express Special At Subhagpur Railway station..RSA With Varanasi- Gorakhpur...
11079/Mmb LTT BNY/Brhn Nepal Border station Train arrival, departure at Barhni Railway stationVideo link:...
GD/Gnd Enjoy the video of CRS Inspection of Gonda Jn-Subhagpur Rail Electrification.click...
SUBR/Sbhgpr रेल संरक्षा आयुक्त, उत्तर पूर्वी सर्किल द्वारा पूर्वोत्तर रेलवे के लखनऊ...
GD/Gnd CRS Inspection of Gonda Jn-Subhagpur(6KM) Rail Electrification will be held on...
15081/Grkhpr Gmt SUBR/Sbhgpr Electrification of 1st phase of Gonda-Gorakhpur Loop line(i.e Gonda Jn to...
GD/Gnd Construction of 2 new platform (PF-7&8) at old malgodam and 1...
14213/Vrns Bhrch GD/Gnd Two no. of washing pit 650-650m length and over head water...
75128/Gnd Grkhpr SUBR/Sbhgpr Approx all poles are straightened out and source says it is...
75128/Gnd Grkhpr SUBR/Sbhgpr Approx all poles are straightened out and source says it is...
75128/Gnd Grkhpr GD/Gnd 1- Foundation of Rail Electrification of Gonda...
Scroll to Top
Scroll to Bottom
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has
NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.