Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sun Oct 6 11:10:03 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

DADN/Dr. Ambedkar Nagar (Mhow) (4 PFs)
डाॅ.अम्बेडकर नगर (महू)
(ڈاکٹر امبیڈکر نگر (مہو

Track: Double Electric-Line

Updated: Oct 26 2023 (09:10) by Padmakant
Dr. Ambedkar Nagar (Mhow) railway station, also known as DADN, is located in the town of Mhow, Madhya Pradesh. It is a bustling station with 4 platforms, offering basic amenities like waiting rooms and refreshment stalls. The station is known for its historic significance, being the former headquarters of the British Army in India, and its close proximity to the famous Mhow Cantonment.

Tourism

Mhow Cantonment Church: A historic church with beautiful architecture.
Mhow Jain Temple: A peaceful Jain temple dedicated to Lord Mahavira.
Mhow Mosque: A beautiful mosque known for its intricate carvings.
Mhow War Memorial: A monument honoring the soldiers who fought in World War I.
Mhow Cantonment: The historic cantonment area offers a glimpse into the town's colonial past.

Food

Sagar Restaurant: A popular vegetarian restaurant serving delicious North Indian and South Indian dishes.
The Dhaba: A simple and budget-friendly eatery known for its flavorful vegetarian curries and snacks.
Amul: A popular chain restaurant offering a wide variety of vegetarian snacks and sweets.
Mhow Restaurant: A local eatery serving authentic Mhow-style vegetarian food.
The Veg Corner: A small and cozy restaurant specializing in vegetarian street food.

Station Address

Railway Station Rd, Mhow - Simrol - Khandwa Road, Davpuri Colony, Dr. Ambedkar Nagar, District - Indore. Pincode - 453441.
State: Madhya Pradesh

Elevation: 575 m above sea level
Type: Regular   Category: NSG-5
Zone: WR/Western   Division: Ratlam


No Recent News for DADN/Dr. Ambedkar Nagar (Mhow)
Nearby Stations in the News
Number of Platforms: 4
Number of Halting Trains: 0
Number of Originating Trains: 16
Number of Terminating Trains: 16
2 Follows
Rating: 4.2/5 (24 votes)
cleanliness - excellent (3)
porters/escalators - average (3)
food - good (3)
transportation - good (3)
lodging - good (3)
railfanning - excellent (3)
sightseeing - excellent (3)
safety - excellent (3)

Station News

Page#    Showing 121 to 140 of 499 News Items  <<prev  next>>
Jun 03 (13:02) Mhow-Patalpani Broad Gauge Railway Line Nears Completion, Heritage Train to Resume in July
Entry# 6084215   
  Past Edits
Jun 03 2024 (13:02)
Station Tag: Ratlam Junction/RTM added by AdittyaaSharma^~/1421836

Jun 03 2024 (13:02)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by AdittyaaSharma^~/1421836

Jun 03 2024 (13:02)
Station Tag: Kalakund/KKD added by AdittyaaSharma^~/1421836

Jun 03 2024 (13:02)
Station Tag: Patal Pani/PTP added by AdittyaaSharma^~/1421836
Patalpani Kalakund Heritage Train: हेरिटेज ट्रेन में सवार होने के लिए अब इंदौर से सीधे ट्रेन से पहुंच सकेंगे पातालपानी

The 4.5 km broad gauge railway line between Mhow and Patalpani is nearing completion and is expected to be ready by July. The line is part of the Ratlam division's project to convert the existing narrow gauge track to broad gauge. Once the line is operational, tourists will be able to...
more...
travel to Patalpani by train. The Commissioner of Railway Safety (CRS) will inspect the line, after which passenger trains will be allowed. A new ROB (Road Over Bridge) has been constructed, replacing a level crossing at Chaurdia. A new bridge has also been constructed before Patalpani station. The heritage train, which operates on this route, will also resume services in July, most likely coinciding with the onset of the monsoon. The Patalpani station will not be equipped with facilities for broad gauge operations as it will be part of the Mhow-Omkareshwar Road station and the line will diverge towards Khandwa, from the Badhia village.

Mhow aur Patalpani ke beech 4.5 km ki broad gauge rail line July tak ready ho jaayegi. Ye line Ratlam division ke project ka part hai jisme narrow gauge track ko broad gauge mein convert kiya ja raha hai. Line ready hone ke baad tourists train se Patalpani jaa sakeinge. Railway...
more...
Safety Commissioner (CRS) line ka inspection karenge, uske baad passenger trains chalaane ki permission milegi. Chaurdia par level crossing ki jagah ek naya ROB (Road Over Bridge) banaya gaya hai. Patalpani station se pahle ek naya bridge bhi banaya gaya hai. July tak is rail line ka CRS ho jaayega. Iske baad tourists broad gauge train se Patalpani station tak jaa sakeinge. Lekin Patalpani station par broad gauge line ke liye facility nahi hai, kyunki ye Mhow-Omkareshwar Road station ka part hai aur line Badhia village se Khandwa ki taraf diverge hogi. Heritage train, jo is route par chalti hai, woh July mein monsoon start hone ke saath saath chalna shuru kar degi.
Jun 01 (10:37) Indore-Mhow Rail Line Resumes Operations After 15-Day Mega Block
Entry# 6081482   
  Past Edits
Jun 01 2024 (10:37)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by AdittyaaSharma^~/1421836

Jun 01 2024 (10:37)
Station Tag: Indore Junction/INDB added by AdittyaaSharma^~/1421836
Indore Mhow Rail Line: यात्रियों के लिए बड़ी राहत, मेगा ब्लाक खत्म होते ही महू और इंदौर के बीच दौड़ने लगी ट्रेनें

The Indore-Mhow railway line has resumed operations after a 15-day mega block for the Rau-Mhow doubling project. The first train from Mhow to Ratlam-Bhilwara departed at 2:30 PM on Friday. However, the train was mostly empty due to lack of information regarding the resumption. The doubling project has created two tracks...
more...
on the Indore-Mhow line, with trains to Mhow utilizing the new track and trains from Mhow using the old one. The first train left at 2:30 PM after the construction department granted permission. All DEMU trains resumed operations on Friday, and long-distance trains from Mhow will resume on Saturday. Despite the resumption, passenger turnout was low due to lack of information. The Mhow-Rewa Express will now operate with LHB (Link Hoffman Bush) coaches, starting October 6th for the Rewa-Mhow Express (11703) and October 7th for the Mhow-Rewa Express (11704). The new track has been inspected by the CRS (Commissioner of Railway Safety) and is now approved for speeds of up to 90 km/h. All cancelled, short-terminated, and originated trains due to the mega block have also resumed their schedules.

Indore-Mhow rail line pe 15 din ka mega block, Rau-Mhow doubling project ke liye, khatam ho gaya hai. Friday ko, pehli train Mhow se Ratlam-Bhilwara ke liye 2:30 PM pe chali. Lekin, train me kam passengers the, kyunki resume hone ki jaankaari nahin thi. Doubling project se Indore-Mhow line pe...
more...
do tracks ban gaye hain. Indore se Mhow jaane wali trains new track pe chalengi, aur Mhow se Indore aaane wali trains old track pe. Construction department ne 1:30 PM pe permission di, aur pehli train 2:30 PM pe chali. Friday se, saare DEMU trains chalaane lage hain, aur Mhow se chalne wali long-distance trains Saturday se chalaane lage. Passengers kam the kyunki unko jaankaari nahin thi. Mhow-Rewa Express ab LHB (Link Hoffman Bush) coaches se chalegi, 6th October se Rewa-Mhow Express (11703) aur 7th October se Mhow-Rewa Express (11704) ke liye. CRS (Commissioner of Railway Safety) ne new track inspect kiya hai aur 90 km/h ki speed se trains chalane ki permission di hai. Mega block ki wajah se cancel, short-terminated, aur originated trains bhi apni schedule ke mutabiq chalne lage hain.
May 31 (19:56) Speed Trial Conducted for Double-Tracked Section between Rau and Mhow
Entry# 6080907   
  Past Edits
May 31 2024 (19:56)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by Exynos9611~/2099623

May 31 2024 (19:56)
Station Tag: Rau/RAU added by Exynos9611~/2099623
राऊ-महू रेल दोहरीकरण ट्रैक का स्पीड ट्रायल..:130 किमी की रफ्तार से चली ट्रेन, 9.5 किमी की दूरी 9 मिनट में तय की

On Thursday, a speed trial was conducted for the double-tracked section between Rau and Mhow, covering a distance of 9.5 kilometers. Railway officials inspected the newly constructed track and bridges using a trolley for eight hours. Later that night, a speed trial with a train was conducted at 130 kilometers per...
more...
hour. The double-tracking project will eliminate crossing issues and allow for more long-distance express trains to run through Mhow. Previously, trains had to be stopped at stations due to crossing conflicts.

Rau aur Mhow ke beech 9.5 kilometer ke hisse mein double-tracked section ka speed trial Thursday ko hua. CRS inspection ke pehle aath ghanto mein railway ke officers ne trolley ke zariye newly constructed track, pul-puliyaon ki jaanch ki. Fir raat mein newly constructed track per 130 km per hour speed...
more...
trial kiya gaya. Double-tracking ka fayda yeh hoga ki crossing ki problem khatam ho jayegi aur Mhow mein lambi doori ki express trains ki sankhya badhegi. Pehle trains ko station per rokna padta tha.
May 30 (22:26) Railway Safety Commissioner Inspects Newly Doubled Track Between Rau and Mhow, Conducts High-Speed Test Run
Entry# 6079999   
  Past Edits
May 30 2024 (22:26)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by AdittyaaSharma^~/1421836

May 30 2024 (22:26)
Station Tag: Rau/RAU added by AdittyaaSharma^~/1421836
Railway News: 130 किमी प्रतिघंटे की रफ्तार से 9 मिनट में तय किया राऊ-महू स्टेशन का 9.5 किमी का मार्ग

On Thursday, May 30th, the Commissioner of Railway Safety (CRS) for the Western Circle, Mumbai, R.K. Sharma, inspected the newly completed doubling work between Rau and Dr. Ambedkar Nagar (Mhow) railway stations. The inspection included a test run of a train at a speed of 130 km/h, covering the 9.5 km...
more...
distance in just 9 minutes. The CRS inspected the entire track, new buildings at Harniyakhedi and Mhow stations, platforms, and tracks. A 15-day mega block at Mhow station was enforced from May 15th to May 30th to complete the doubling work. The DEMU train service from platform number 1 at Mhow station is expected to start on June 1st or 2nd. The inspection also included the examination of 10 bridges and culverts along the 9.5 km stretch. The CRS inspected the facilities for disabled passengers at Harniyakhedi station and checked the lighting. At Mhow station, he inspected platforms 1-4, lighting, toilets, loco pilot rooms, guard rooms, TTE rooms, waiting rooms, announcement rooms, tracks, foot over bridge, station building, and other aspects. After the station inspection, a train with 8 coaches and 2 engines was used to inspect the track at normal speed. The CRS left Rau station at 7:44 PM for Mhow station, where the train arrived at 7:53 PM after covering the 9.5 km distance at a speed of 130 km/h.

Thursday, May 30th ko, Mumbai ke Western Circle ke Commissioner of Railway Safety (CRS), R.K. Sharma ne Rau aur Dr. Ambedkar Nagar (Mhow) railway stations ke beech mein hua doubling work ka inspection kiya. Is inspection mein 130 km/h ki speed se ek train ka test run bhi shamil tha, jisse...
more...
9.5 km ka safar sirf 9 minutes mein pura hua. CRS ne pura track, Harniyakhedi aur Mhow stations par bane naye building, platforms, aur tracks ka bhi inspection kiya. Doubling work ko complete karne ke liye Mhow station par 15 din ka mega block May 15th se May 30th tak laga tha. Mhow station ke platform number 1 se DEMU train service June 1st ya 2nd se start hone ki ummid hai. Inspection mein 9.5 km ke beech mein aane wale 10 bridges aur culverts ki jaanch bhi ki gayi. CRS ne Harniyakhedi station par disabled passengers ke liye facilities ka inspection kiya aur lighting bhi check ki. Mhow station par unhone platforms 1-4, lighting, toilets, loco pilot rooms, guard rooms, TTE rooms, waiting rooms, announcement rooms, tracks, foot over bridge, station building, aur doosre aspects ka bhi inspection kiya. Station ka inspection hone ke baad, 8 coaches aur 2 engines wali ek train se normal speed par track ka inspection kiya gaya. CRS Rau station se 7:44 PM par Mhow station ke liye nikle aur 130 km/h ki speed se train chalate hue 9.5 km ka safar 9 minutes mein pura karke 7:53 PM par Mhow station ke platform number 2 par pahunche.
May 29 (19:39) Indian Railways Completes Double-Tracking Project Between Mhow and Rau, Speed Trial Underway
Entry# 6079009   
  Past Edits
May 29 2024 (19:39)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by Exynos9611~/2099623

May 29 2024 (19:39)
Station Tag: Rau/RAU added by Exynos9611~/2099623
महू-राऊ रेलवे लाइन का दोहरीकरण कार्य पूरा:नए ट्रैक पर 130 किमी. की स्पीड से दौड़ा इंजन

Indian Railways has completed the 9.5 km double-tracking project between Mhow and Rau stations in Dr. Ambedkar Nagar. The new railway track is currently undergoing a safety inspection by the Commissioner of Railway Safety (CRS), which will last until May 30. This inspection involves a trolley inspection of the entire track...
more...
followed by a speed trial using an inspection engine at 130 km per hour. To ensure safety during the speed trial, the railway is taking precautions including announcements and additional security measures at railway crossings. The project, which began last year, included a large bridge at Kishanganj. The railway implemented a mega-block at Mhow station for 15 days to expedite the project, during which passenger trains were not operational.

Indian Railways ne Dr. Ambedkar Nagar ke Mhow station se Rau station tak 9.5 km ka double-tracking ka kaam pura kar liya hai. May 29 aur 30 tak, CRS (Commissioner of Railway Safety) by new track ka inspection kar raha hai. Isme, trolley se pure track ka inspection aur...
more...
130 km per hour speed se inspection engine chalake speed trial bhi ho raha hai. Speed trial ke liye, railway safety measures le raha hai, jaise announcements aur railway crossings par extra security. Last year se chalne wala project, Kishanganj mein bada bridge bhi include karta hai. Project ko jaldi karne ke liye, railway ne Mhow station par 15 din ke liye mega-block lagaya, jisme passenger trains nahi chali.
Page#    Showing 121 to 140 of 499 News Items  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy