Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Fri Sep 20 20:11:10 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

DOT/Dhakia Tiwari (1 PFs)
धकिया तिवारी
دھاکیا تیواری

Track: Single Electric-Line

Dhakia Tiwari is a small railway station situated in the state of Uttar Pradesh. The station has a single platform and basic amenities like a waiting room and a ticket counter. It's a quiet location surrounded by greenery and offers a glimpse into rural India, making it a good stop for travelers seeking authentic experiences.

Tourism

A small temple dedicated to Lord Shiva, known for its peaceful ambiance.
A mosque located near the village, offering a glimpse into the local culture.
An ancient temple dedicated to the goddess Durga, revered by the local community.
A historical site with ruins of an ancient fort, offering a glimpse into the region's history.
A pilgrimage site frequented by devotees seeking blessings from the local deity.

Food

A popular local eatery serving delicious vegetarian thalis and snacks.
A roadside stall known for its flavorful street food and fresh samosas.
A small vegetarian restaurant offering a variety of traditional North Indian dishes.
A budget-friendly dhaba offering a range of vegetarian curries and breads.
A local sweet shop serving delectable sweets and snacks perfect for a quick bite.

Station Address

Dhakia Tiwari
State: Uttar Pradesh

Elevation: n/a
Type: Regular   Category: n/a
Zone: NER/North Eastern   Division: Izzatnagar


Number of Platforms: 1
Number of Halting Trains: 6
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station News

Page#    Showing 1 to 20 of 98 News Items  next>>
Yesterday (19:42) BEML Wins Contract for 210 Coaches for Chennai Metro Phase 2
Entry# 6194845   
  Past Edits
This is a new feature showing past edits to this News Post.
Stations:  Asnoti/AT   Dhakia Tiwari/DOT  
BEML bags 210-Coach Rolling Stock Contract for Chennai Metro Phase 2

BEML Ltd. has been awarded a contract by Chennai Metro Rail Ltd. (CMRL) to supply 210 coaches for Chennai Metro’s Phase 2 project, which includes Lines 3 and 5. The contract, ARE02A, covers 70 train sets of three cars each, along with a 15-year maintenance agreement. BEML emerged as the lowest...
more...
bidder after re-bidding, with their bid estimated at around Rs. 3087 crore. The upcoming trains will operate on the new 45.4 km Line-3 (Madhavaram – Siruseri SIPCOT) and 44.6 km Line-5 (Madhavaram – Sholinganallur) and will adhere to Grade of Automation-4 (GoA4) standards, enabling driverless operations. The contract scope includes design, manufacture, supply, testing, commissioning, training, and depot machinery maintenance. Meanwhile, Alstom is nearing the rollout of its first 3-coach train for Line-4. Another rolling stock contract for Line-3 and Line-5, under Package ARE04A, is currently under bid, with technical bid openings scheduled for October 19.

Chennai Metro Rail Ltd. (CMRL) ne Chennai Metro ke Phase 2 project ke liye 210 coaches supply karne ka contract BEML Ltd. ko diya hai. Yeh contract, ARE02A, 70 train sets, har set mein 3 coaches, aur 15 saal ka maintenance agreement include karta hai. BEML, re-bidding ke baad, sabse...
more...
kam bid denewala tha, unki bid lagabhag Rs. 3087 crore ki hai. Naye trains 45.4 km Line-3 (Madhavaram – Siruseri SIPCOT) aur 44.6 km Line-5 (Madhavaram – Sholinganallur) par chalenge aur Grade of Automation-4 (GoA4) standards follow karenge, jisse driverless operations possible honge. Contract mein design, manufacture, supply, testing, commissioning, training, aur depot machinery maintenance bhi include hai. Iske alawa, Alstom apna pehla 3-coach train Line-4 ke liye jaldi launch karne wala hai. Line-3 aur Line-5 ke liye, Package ARE04A ke under, ek aur rolling stock contract ke liye bidding chal rahi hai, jiska technical bid opening October 19 ko hoga.
Aug 30 (20:04) Agra Metro Phase 1 Records Major Tunnel Breakthroughs
5832 views
0

Entry# 6173646   
  Past Edits
This is a new feature showing past edits to this News Post.
Stations:  Asnoti/AT   Dhakia Tiwari/DOT  
Afcons-SAM India JV records two major Tunnel Breakthroughs for Agra Metro Phase 1

Afcons Infrastructure, in partnership with Sam India Consortium, has achieved significant progress in the Agra Metro Phase 1 project with two recent tunnel breakthroughs using Tunnel Boring Machines (TBMs) named Ganga and Shivaji. These breakthroughs are part of the 14.25 km Line-1 stretch from Sikandra to Taj East Gate. The Agra...
more...
Metro Phase 1 project includes the civil construction contract for underground Package AGCC-02, valued at Rs. 1,819.79 crore. The project is expected to be completed within 48 months. The successful tunneling operations demonstrate the project's progress towards enhancing urban transit infrastructure and connectivity in Agra.

Agra Metro Phase 1 project mein Afcons Infrastructure aur Sam India Consortium ne do tunnel breakthroughs ke saath aage badh ke kaam kiya hai. Ye breakthroughs Line-1 stretch par hue hain, jo Sikandra se Taj East Gate tak 14.25 km lamba hai. Do TBMs, Ganga aur Shivaji, ne ye kaam kiya...
more...
hai. Agra Metro Phase 1 project mein Package AGCC-02 ka civil construction contract hai, jiska cost Rs. 1,819.79 crore hai. Project 48 months mein khatam hone wala hai. TBMs ka kaam sahi chal raha hai aur ye Agra mein urban transit infrastructure aur connectivity ko behtar banane ki taraf badh raha hai.
Aug 30 (19:55) Chennai Metro Rail Achieves Milestone in Phase II Expansion with TBM Breakthrough
Entry# 6173621   
  Past Edits
This is a new feature showing past edits to this News Post.
Stations:  Asnoti/AT   Dhakia Tiwari/DOT  
TBM Kolli records tunnel breakthrough at Otteri Shaft for Chennai Metro Phase 2 Project

Chennai Metro Rail Limited (CMRL) has successfully completed a significant milestone in its Phase II expansion project. The Tunnel Boring Machine (TBM) Kolli (S 81) broke through at the Otteri shaft, marking a crucial step in the development of three new metro corridors. This TBM was deployed by Tata Projects and...
more...
covered a bored tunnel length of 903 meters. The expansion project, encompassing three corridors, will add a total of 116.1 kilometers to Chennai's metro system, improving connectivity and providing a more efficient public transportation network.

Chennai Metro Rail Limited (CMRL) ka Phase II expansion project mein ek bada milestone pura ho gaya hai. Tunnel Boring Machine (TBM) Kolli (S 81) Otteri shaft pe breakthrough kar gaya, yeh Chennai mein teen new metro corridors ke development mein ek important step hai. Tata Projects ne yeh TBM deploy...
more...
kiya tha aur isne 903 meter lamba tunnel bore kiya. Yeh expansion project, jisme teen corridors hai, Chennai ke metro system mein 116.1 kilometers aur add karega, jisse connectivity improve hogi aur ek efficient public transport network mil payega.
Aug 28 (20:12) Orbital Rail Project to Enhance NCR Connectivity, Boost Economic Activity
5923 views
0

Entry# 6171423   
  Past Edits
This is a new feature showing past edits to this News Post.
Stations:  Dhakia Tiwari/DOT   Asnoti/AT  
UP Govt plans orbital rail corridor to connect Ghaziabad, Baghpat, Noida and Greater Noida

The Uttar Pradesh government has appointed the Ghaziabad Development Authority (GDA) to oversee the construction of the Orbital Rail Project, a new railway corridor linking major cities in the National Capital Region (NCR). This 270 km long rail line will intersect the rapid rail corridor near Duhai, offering convenient passenger and...
more...
freight transportation. The orbital rail will have stations every 5 kilometers, unlike the bypass expressways, connecting areas not served by those expressways. The GDA has already made an initial payment to the Haryana Rail Infrastructure Development Corporation (HRIDC) for a feasibility report, expected to be completed within 6 months. The project is expected to significantly enhance connectivity, boost logistics, and support the NCR's economic growth by integrating with existing and future transportation infrastructure. The project is aligned with the NCR Planning Board's vision of creating five major urban clusters by 2032, and the successful completion of the orbital rail will play a crucial role in connecting these clusters.

Uttar Pradesh government ne National Capital Region (NCR) mein connectivity badhane aur economic activity ko boost karne ke liye, Ghaziabad Development Authority (GDA) ko Orbital Rail Project ka nodal agency bana diya hai. Ye 270 kilometer ka rail network NCR ke different cities ko link karega aur Duhai ke paas rapid...
more...
rail corridor se intersect karega, jisse passengers aur freight ka efficient movement possible hoga. Orbital rail mein har 5 kilometer par station honge, unlike bypass expressways, aur yeh expressways ke pass nahi jane wale areas ko bhi connect karega. GDA ne project ke feasibility report ke liye Haryana Rail Infrastructure Development Corporation (HRIDC) ko paise de diye hain, aur report next 6 months mein complete hone ki ummid hai. Project se connectivity badhne, logistics ko boost milne, aur NCR ke economic growth ko support milne ki ummid hai, kyunki yeh existing and future transportation infrastructure se integrate hoga. Project NCR Planning Board ke vision ke sath aligned hai, jisme 2032 tak five major urban clusters banaane ka lakshya hai, aur Orbital Rail in clusters ko connect karne mein important role khelega.
Aug 26 (19:58) Pune Metro Phase 1A Extension: Bids Announced for Four Elevated Stations
Entry# 6169315   
  Past Edits
This is a new feature showing past edits to this News Post.
Stations:  Dhakia Tiwari/DOT   Asnoti/AT  
Tender launched for Construction of Elevated Stations of Pune Metro Phase 1A

The Maharashtra Metro Rail Corporation (Maha-Metro) has announced bids for the construction of four elevated stations under the Pune Metro Phase 1A extension project, which extends the Purple Line by 4.519 kilometers. The new stations will be located along the eastern service road of Old Mumbai Road and include Chinchwad, Akurdi,...
more...
Nigdi, and Bhakti Shakti. The design of these stations was completed by LKT Engineering. This extension is a crucial part of Pune’s metro network, aiming to enhance connectivity and reduce traffic congestion. The call for bids reflects ongoing progress in the project.

Pune Metro Phase 1A extension project mein, Maha-Metro ne 4 elevated stations ke construction ke liye bids announce kiye hain. Ye extension Purple Line ko 4.519 kilometers tak extend karega aur PCMC ko Nigdi ke Bhakti Shakti se connect karega. New stations Old Mumbai Road ke eastern service road par honge...
more...
aur Chinchwad, Akurdi, Nigdi, aur Bhakti Shakti ko include karenge. In stations ka design LKT Engineering ne complete kiya hai. Ye extension Pune ke metro network ka ek important part hai, jiska aim connectivity badhana aur traffic congestion ko kam karna hai. Bids announce hone se project mein ongoing progress reflect ho raha hai.
Page#    Showing 1 to 20 of 98 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy