Please wait...
IMAGINARY Train. NOT an ACTUAL running Train.
(Imaginary Trains are created by RailFans to explore various alternative Train Routes and TTs. Such trains are NOT ACTUALLY RUNNING on the tracks.)
IMG22304-2135848/♥♥Varanasi - Howrah Vande Bharat Express (via Patna)♥♥ वाराणसी - हावड़ा वंदे भारत एक्सप्रेस (पटना होकर)
Latest News (You need to double-check/verify this info yourself)
Pantry/Catering ✕ Pantry Car
✓ On-board Catering ✓ E-Catering
Practical - Can Easily be Introduced by IR
IMAGINARY Train.
Mastermind~ Updated: May 09 2023 (21:27)
Please Wait ...
RSA - Rake Sharing Single Dedicated Rake of Eastern Railway/Howrah Division
LHB Rake
Rake/Coach Position
The Shortest Route between Varanasi Jn and Howrah Jn is 80 km (11%) shorter. Travel Time: 8h 10m 3 halts Distance: 760 km Avg Speed: 93 km/hr Type: Vande Bharat
Rake Zone: ER/Eastern
Departs @ 15:00 Platform# --
BSB/Varanasi Jn Arrives @ 23:10 Platform# --
HWH/Howrah Jn
3 halts. 206 intermediate Stations between Varanasi Junction and Howrah Junction 3 halts. 206 intermediate Stations between Varanasi Junction and Howrah Junction
#
Trk
Code
Station Name
X/O
Note
Arrives
Avg
Departs
Avg
Halt
PF
Day#
Km
Speed
Elev
Zone
Address
1
/==/
-
15:00
-
--
1
0.0
43
77m
NR
Pin - 221002, Uttar Pradesh
5 intermediate stations
00:25
18.1
2
/==/
X
15:25
-
15:27
-
2m
--
1
18.1
99
79m
ECR
Distt. - Chandauli, Uttar Pradesh
51 intermediate stations
02:08
211.4
3
/==/
X O
17:35
-
17:38
-
3m
--
1
229.5
90
57m
ECR
District - Patna. Pin - 800001., Bihar
87 intermediate stations
03:42
331.3
4
/==/
21:20
-
21:22
-
2m
--
1
560.8
111
106m
ER
Dist - Paschim Bardhaman, West Bengal
60 intermediate stations
01:48
199.1
5
/==/
23:10
-
-
--
1
760.0
-
12m
ER
Dist - Howrah, West Bengal
Scroll to Top
Scroll to Bottom
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has
NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.