Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF/TrainSet:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Sun Sep 22 08:08:59 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

17304/Sindhanur - SSS Hubballi Express (UnReserved)
सिंधनुर - हुब्बल्लि एक्सप्रेस

GGVT/Gangavathi --> CKBK/Chikkabenakal

Latest News
(You need to double-check/verify this info yourself)
JCO 04.02.24 Is Fully Cancelled Due To Line Block For RCC Boxes Insertion At Koppal Yard.
Mon Jan 29, 2024 (08:46PM)
News History
Train No. 17304 Karatagi-SSS Hubballi Express journey commencing from 02.12.2023 to 11.12.2023 will originate from Gangavathi station instead of Karatagi. It will be partially cancelled between Karatagi and Gangavathi stations.
Mon Dec 04, 2023 (11:24AM)
Train No. 17304 Karatagi - SSS Hubballi Express Journey commencing from 22.11.2023 to 01.12.2023 will originate from Gangavathi instead of Karatagi station.
Sat Nov 18, 2023 (12:22AM)
Long cancellation
Thu Apr 29, 2021 (10:35PM)
0 Follows
Bedroll/Linen: NOT Available change
Inaugural Run
Mon Jun 03, 2019
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✕ E-Catering
Updated: Mar 18 (12:32) by Padmakant
Dep:
Arr:
Rating: 3.3/5 (6 votes)
cleanliness - average (1)
punctuality - good (1)
food - poor (1)
ticket avbl - good (1)
u/r coach - good (1)
railfanning - excellent (1)
safety - good (1)
Loco
ICF Rake

Rake/Coach Position

News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    12 blog entries  <<prev  
Info Update
274958 views
20

★★★
Jun 03 2019 (16:28)   17304/Sindhanur - SSS Hubballi Express (UnReserved) | GGVT/Gangavathi (3 PFs)
KhagariaJn^~
KhagariaJn^~   63504 blog posts
Entry# 4333931            Tags   Past Edits
Shri Karadi Sanganna, Hon'ble Member of Parliament, Koppal will be Flagging off of inaugural special from Gangavathi to Hubballi Express #today.
click here
Translate to English
Translate to Hindi

1 Posts

64371 views
1

Jun 04 2019 (23:31)
ssastronaut~
ssastronaut~   937 blog posts
Re# 4333931-2              
1st Express train flagged off after elections!
Translate to English
Translate to Hindi

More Posts
General Travel
35134 views
11

Jun 03 2019 (17:44)   17304/Sindhanur - SSS Hubballi Express (UnReserved) | GGVT/Gangavathi (3 PFs)
DeepakUlli~
DeepakUlli~   2929 blog posts
Entry# 4333974            Tags  
New GGVT - UBL -GGVT EXPRESS train time table ..as excepted RSA with same passengers train ..but TT looks same 4hrs no difference with exp & pass train s ..hope they speedup coming days
Translate to English
Translate to Hindi

1 Posts

11527 views
0

Jun 03 2019 (18:25)
APinSafeHands~
APinSafeHands~   5995 blog posts
Re# 4333974-2              
from ginigera to ggvt it takes 1hr 46mins for just 39kms with 22kmph...horrible
Translate to English
Translate to Hindi

11090 views
0

Jun 03 2019 (18:27)
psanga_sur^~
psanga_sur^~   5661 blog posts
Re# 4333974-3              
Hubli to Gadag section is doubled?
Translate to English
Translate to Hindi

11327 views
3

Jun 03 2019 (18:57)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   11304 blog posts
Re# 4333974-4              
Not fully. Binkadakatti-GDG-Harlapur(23km) is single. UBL-Binkadakatti is doubled.
Translate to English
Translate to Hindi

11286 views
2

Jun 04 2019 (19:56)
Irshad13~
Irshad13~   8109 blog posts
Re# 4333974-5              
No as per final TT it takes 55 min between Gangavati to Gingera jn of 38 km because the section is one train system only without signalling system so when the section gets Signalling system with proper loop lines at stations to do crossings then train takes just 35 to 40 min i hope initially and later speed can be upgraded once entire line get ready..
Translate to English
Translate to Hindi
Page#    12 blog entries  <<prev  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy