|
Post PNR | Post Blog | Advanced Search |
3 Follows Bedroll/Linen: AVAILABLE change Inaugural Run Fri Nov 01, 1957 Pantry/Catering ✕ Pantry Car ✓ On-board Catering ✓ E-Catering | Updated: May 13 (08:43) by Rf_Shanku^~
RSA - Rake Sharing No RSA., PM at Bilaspur | Rating: 3.8/5 (64 votes) cleanliness - good (11) punctuality - good (11) food - good (10) ticket avbl - good (11) u/r coach - good (6) railfanning - good (11) safety - good (10) | ||||
ICF Rake Rake/Coach Position 0 L 1 SLR 2 GS 3 GS 4 HA1 5 A1 6 B5 7 B4 8 B3 9 B2 10 B1 11 S11 12 S10 13 S9 14 S8 15 S7 16 S6 17 S5 18 S4 19 S3 20 S2 21 S1 22 GS 23 SLR UJN |