|
Post PNR | Post Blog | Advanced Search |
0 Follows Bedroll/Linen: Don't know change Pantry/Catering ✕ Pantry Car ✕ On-board Catering ✕ E-Catering | TRAIN IS CANCELLED
RSA - Rake Sharing PM @ NCJ. | Rating: NaN/5 (0 votes) cleanliness - n/a (0) punctuality - n/a (0) food - n/a (0) ticket avbl - n/a (0) u/r coach - n/a (0) railfanning - n/a (0) safety - n/a (0) | ||||
Loco | ||||||
LHB Rake Rake/Coach Position 0 L 1 EOG 2 UR 3 UR 4 S1 5 S2 6 S3 7 S4 8 S5 9 S6 10 PC 11 M1 12 M2 13 M3 14 B1 15 B2 16 B3 17 A1 18 A2 19 H1 20 UR 21 UR 22 SLR 🔹 Composition : First AC - 1, Second AC - 2, Third AC - 3 Third Economy - 3, Sleeper - 6, Pantry - 1, Unreserved - 4, LSLRD - 1 & EOG - 1. |