Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Tue Jul 30 07:59:46 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Medium; Side View; Small TB; Outside of Train; Standing at Station;
Entry# 4288812-0
Large TB;
Entry# 5330322-0


15058/Anand Vihar Terminal - Gorakhpur Weekly Express
आनंद विहार टर्मिनल - गोरखपुर साप्ताहिक एक्सप्रेस

ANVT/Anand Vihar Terminal --> GKP/Gorakhpur Junction

Latest News
(You need to double-check/verify this info yourself)
🔹 Revised Compostion w.e.f. 13 November 2024 will be SLR - 1, EOG - 1, GS - 4, SL - 5, AC 3E - 2, AC 3 - 6, AC 2 - 2, HA - 1. Total 22 LHB Coaches.
Sun Jul 14, 2024 (02:37AM)
News History
🔹Train no. 15058/Anand Vihar Terminal - Gorakhpur Weekly Express JCO 06/12/2023 to 28/02/2024 (Every Wednesdays and 13 trips) will be fully cancelled due to foggy weather.
Tue Nov 14, 2023 (05:44PM)
• JCO 22.02.2023 will remain cancelled due to Non- Interlocking work at Kheta Sarai and Shahganj stations o­n Barabanki –Ayodhya Cantt - Akbarpur - Zafarabad section of Lucknow Division over NR.
Sat Feb 18, 2023 (08:31AM)
Revised Coach Composition W.E.F 14/09/2022 ex ANVT - AC 1 cum AC 2 Tier (HA) - 1, AC 2 Tier (2A) - 2, AC 3 Tier (3A) - 8, Sleeper (SL) - 5, General (GS) - 4, EOG -1, SLRD -1.
Tue Aug 02, 2022 (10:24AM)
◉ JCF 08.12.21 to 23.02.22 will remain cancelled because of operational difficulties due to dense foggy conditions.
Fri Oct 08, 2021 (08:10PM)
0 Follows
Bedroll/Linen: AVAILABLE change
Inaugural Run
Wed Mar 25, 2015
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is available at ANVT, GZB & MB.
Updated: Apr 18 (19:41) by Kumaon_Tiger^~
Dep:
Arr:
Rating: 3.8/5 (58 votes)
cleanliness - good (10)
punctuality - excellent (10)
food - average (9)
ticket avbl - good (10)
u/r coach - good (8)
railfanning - good (9)
safety - good (10)
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
HA1
  3
 A1
  4
 A2
  5
 B1
  6
 B2
  7
 B3
  8
 B4
  9
 B5
 10
 B6
 11
 B7
 12
 B8
 13
 S1
 14
 S2
 15
 S3
 16
 S4
 17
 S5
 18
 UR
 19
 UR
 20
 UR
 21
 UR
 22
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    79 blog entries  <<prev  next>>
Spotting/Trip
27589 views
4

Journey Date: Wed Jun 05
Entry# 4335719     
Number of Members on this Trip: 1
Yogesh 
ANVT/Anand Vihar Terminal --> GKP/Gorakhpur Junction
Departure: Wed Jun 05 2019 @ 17:10
4 wishes
शुभ यात्रा Happy Journey शुभ यात्रा Happy Journey
Train Status: 13m late
Last Update: LBH/Dilkusha Cabin 3.1 km<--->5.9 km ML/Malhaur @ Jun 06 2019 (02:30)

Translate to English
Translate to Hindi

10516 views
0

Jun 05 2019 (19:10)
Yogesh   671 blog posts
Re# 4335719-1              
Trip Start Date: Today
.

1 Posts

11509 views
0

Jun 05 2019 (19:16)
Sandyrockers~
Sandyrockers~   2279 blog posts
Re# 4335719-3              
loco link kya hai

2 Posts

12143 views
0

Jun 05 2019 (22:17)
Yogesh   671 blog posts
Re# 4335719-6              
TKD WAP 7

More Posts
Rail Fanning
17110 views
5

May 31 2019 (11:35)   15057/Gorakhpur - Anand Vihar Terminal Weekly Express | GD/WAP-4/22571
Pintoo^~
Pintoo^~   28994 blog posts
Entry# 4330769            Tags   Past Edits
15057 Gorakhpur Anand Vihar Terminal Express with Gonda WAP4 22571.
Today's pic.
Translate to English
Translate to Hindi

8505 views
1

May 31 2019 (19:23)
Piyush~
Piyush~   7026 blog posts
Re# 4330769-1              
Nice clicks 👍
Translate to English
Translate to Hindi
General Travel
13865 views
4

Nov 12 2018 (21:52)   15057/Gorakhpur - Anand Vihar Terminal Weekly Express | MB/Moradabad Junction (7 PFs) | ROZA/WDG-4G
AdityaImmortal^~
AdityaImmortal^~   4708 blog posts
Entry# 3998792            Tags   Past Edits
Video Link - click here
MORADABAD Junction Arrival | Crossing Ramganga River & Spotting HatimSarai DEMU + GE WDG4G ! Gkp Anvt Exp.
Video Link - click here
Translate to English
Translate to Hindi
General Travel
10782 views
5

Apr 27 2019 (18:34)   15057/Gorakhpur - Anand Vihar Terminal Weekly Express | BNY/Barhni (3 PFs)
Balgobind Mishra~
Balgobind Mishra~   1859 blog posts
Entry# 4303261            Tags  
It is very unfortunate Why 15705 Champaran Hamsafar Running in BNY Loop Line While GKP Humsafar Already running in 4 Days...
IR must Reroute 15705 Via BST Main Line & Speed up btwn GKP-DLI...
In same Slot NER need to Start GKP-ANVT Bi-weekly SF Via BNY,GD,SCC. TT Would be :
GKP : 20:55
ANDN
...
more...
: 21:35
NUH : 22:00
BNY : 22:30
BLP : 23:30
GD :00:15
SCC : 03:45
BE : 06:20
MB : 07:50
ANVT : 10:30

Translate to English
Translate to Hindi

8246 views
1

Apr 27 2019 (18:35)
F Ahmad^~   2997 blog posts
Re# 4303261-1              
Ek baar kisi ko service dekar wapas lena bahut mushkil hai
Translate to English
Translate to Hindi

8175 views
1

Apr 27 2019 (18:36)
FraudsterConman
FraudsterConman   7670 blog posts
Re# 4303261-2              
no. 15705/06 reruoting is okay
Translate to English
Translate to Hindi

8084 views
3

Apr 27 2019 (20:38)
Balgobind Mishra~   1859 blog posts
Re# 4303261-3              
I Agree But Actually BNY is lucky that Loop line has 4 Days GKP Hamsafar...
Actually 15705 Champaran Humsafar is Slowest Humsafar just bcoz Running in 2 Loop Line
MFP-NKE-GKP
GKP-BNY-GD
Due to
...
more...
that train taken more time than normal Express.

Translate to English
Translate to Hindi

8259 views
1

Apr 27 2019 (20:52)
Balgobind Mishra~   1859 blog posts
Re# 4303261-4              
It is Economically wrong Decision hai...Aaj MFP-NKE-GKP Electrified ho gaya hai....Agar ye Via BST jayegi to DLI-SPJ tak Eloco se chalegi...But agar Via BNY jaati hai to...Per Trip pe ₹ 1.10 Lac Diesel consumption hota hai...
584 KM ×4 Ltd (Mieleg of Dloco) = 163520/-
Running with ELoco = 1/3 of Diesel Cost Hence
Net Loss = 163520÷3×2 = ₹ 1.10 Lac
Translate to English
Translate to Hindi

7828 views
0

Apr 30 2019 (23:00)
Balasirinfinity   23 blog posts
Re# 4303261-5               Past Edits
Kya ye Official Mielege hai Jo aap de rahe hain..
Agar haan to ye Behad sharmnak hai ki Diesel Loco run karke Paiso ki barbadi kar rahe hain...
Translate to English
Translate to Hindi
Pic Upload
12875 views
2

Apr 20 2019 (17:17)   15057/Gorakhpur - Anand Vihar Terminal Weekly Express
Pintoo^~
Pintoo^~   28994 blog posts
Entry# 4296568            Tags  
#TB
Translate to English
Translate to Hindi
Page#    79 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy