|
Post PNR | Post Blog | Advanced Search |
4 Follows Bedroll/Linen: AVAILABLE change Inaugural Run Fri Apr 01, 1960 Pantry/Catering ✕ Pantry Car ✕ On-board Catering ✓ E-Catering E-Catering is available at RBL, LKO, SPN, BE & MB. | Updated: Oct 15 (08:23) by Prateek_BSB^~
RSA - Rake Sharing No RSA, 3 dedicated Rake PM at BSBS (NER) | Rating: 3.5/5 (18 votes) cleanliness - good (3) punctuality - good (3) food - average (3) ticket avbl - good (3) u/r coach - excellent (2) railfanning - good (3) safety - good (3) | ||||
LHB Rake Rake/Coach Position 0 L 1 SLR 2 UR 3 UR 4 S1 5 S2 6 S3 7 M1 8 M2 9 M3 10 M4 11 M5 12 M6 13 A1 14 A2 15 H1 16 EOG Revised Compostion w.e.f. 06 November 2024 will be SLR - 1, EOG - 1, GS - 4, SL - 3, AC 3E - 2, AC 3 - 2, AC 2 - 2, AC 1 - 1, Total 16 LHB Coaches. |