Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF/TrainSet:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Mon Oct 21 18:32:55 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

08097/Mustaphachak - Bankura MEMU Special
मोस्तफा चक - बांकुड़ा मेमू स्पेशल



MFCK/Mustaphachak --> BQA/Bankura Junction

Latest News
(You need to double-check/verify this info yourself)
▪️Will be short originating from Bowaichandi on 30.08.24
Fri Aug 30, 2024 (01:17PM)
News History
Due to Traffic-cum-Power Block in Bankura-Masagram section of Adra Division o­n 30.01.2022, 08097 Masagram – Bankura MEMU Special leaving Masagram o­n 30.01.2022 will short originate from Bowaichandi.
Fri Jan 28, 2022 (03:33PM)
Coach Composition : MC - 2 & TC - 6. Total = 8 Coaches
Wed Nov 03, 2021 (10:58PM)
0 Follows
Bedroll/Linen: NOT Available
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✕ E-Catering
Updated: Mar 01 (14:18) by Padmakant
Dep:
Arr:
RSA - Rake Sharing
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
u/r coach - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Loco
ICF Rake

Rake/Coach Position

News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    35 blog entries  next>>
General Travel
10227 views
0

Oct 16 (12:38)   08094/Bankura - Masagram MEMU Special | BZC/Beliatore (1 PFs)
Dutta2005
Dutta2005   52 blog posts
Entry# 6220647            Tags   Past Edits
Loop line and overbridge construction is in progress. Looks like it will take around one year to complete. After completion it becomes a crucial crossing station in the Bankura Masagram section

Pic:- Google Maps
Translate to English
Translate to Hindi
General Travel
14029 views
0

Sep 06 (08:52)   08097/Mustaphachak - Bankura MEMU Special | MSAE/Masagram (5 PFs)
KamalMolla
KamalMolla   0 blog posts
Entry# 6180423            Tags  
Anyone know about the 5 KM Masagram flyover. Which side will make this flyover. Burdwan side or Howrah side and any Y link project work is there.

I mean already both line connection work done almost 95%. Then why this flyover. Maybe future preparation....!
Translate to English
Translate to Hindi
General Travel
12120 views
0

Aug 29 (16:39)   08094/Bankura - Masagram MEMU Special | RNGR/Rainagar (1 PFs)
KamalMolla
KamalMolla   0 blog posts
Entry# 6172295            Tags  
Anyone know about the Rainagar loop crossing line is complete or not.

Because today one stone wagen train passed through Rainagar-Masagram. Almost 40+ wagen. I think the train was for RNGR crossing loop line.
Translate to English
Translate to Hindi

More Posts
General Travel
62264 views
3

Mar 01 (14:00)   08094/Bankura - Masagram MEMU Special | KMRL/Kumrul (1 PFs)
KamalMolla
KamalMolla   0 blog posts
Entry# 5983542            Tags  
Platform extension work started at Kumrul Station in Bankura Masagram Section.
150 feet platform will be increased in East side of the platform
Translate to English
Translate to Hindi

More Posts
General Travel
71581 views
8

Mar 18 (10:55)   08094/Bankura - Masagram MEMU Special | MSAE/Masagram (5 PFs)
KamalMolla
KamalMolla   0 blog posts
Entry# 6002045            Tags  
2 compliments
Great Useful
Yesterday at Masagram. SER & ER Line Connection work status.

Most probably line connection work complete within few weeks.
Translate to English
Translate to Hindi

More Posts
Page#    35 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy