Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Fri Sep 6 22:47:04 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Medium; Night Pic; Side View; Small TB;
Entry# 5210031-0
Close-up; Night Pic; Side View; Small TB; Sleeper;
Entry# 5210031-0
Medium; Night Pic; Side View; Small TB; Sleeper;
Entry# 5210031-0

11112⇒22200/Sushasan Express
सुशासन एक्सप्रेस

LKO/Lucknow Charbagh NR --> MB/Moradabad Junction

Latest News
(You need to double-check/verify this info yourself)
J.C.O 4/7/2024 is cancelled from Balrampur
Sat Jun 29, 2024 (06:37PM)
News History
🔹Train no. 22200/Sushasan Express JCO 11/01/2024, 18/01/24, 25/01/24 and 01/02/2024 (Thursdays) will be fully cancelled.
Fri Dec 08, 2023 (10:26PM)
🔹JCO 22.12.2022 has been Rescheduled by 1 hours 40 minutes to leave Balrampur at New Departure Time 13.35 hrs instead of 11.55 hrs.
Thu Dec 22, 2022 (11:51AM)
06.01.2022 को शुरू होने वाली यात्रा लखनऊ चारबाग - कानपुर - गाजियाबाद रुट पर चलेगी.
Sun Jan 02, 2022 (02:17PM)
📢⚟ JCO 23/09/2021 Diverted Via LKO-CNB-GZB
Sat Sep 18, 2021 (04:33PM)
0 Follows
Bedroll/Linen: AVAILABLE change
Inaugural Run
Fri Dec 26, 2014
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
Updated: Dec 07 2023 (20:49) by Kirti^~
Dep:
Arr:
Rating: 2.7/5 (145 votes)
cleanliness - average (24)
punctuality - average (24)
food - average (23)
ticket avbl - good (26)
u/r coach - average (15)
railfanning - average (24)
safety - average (24)
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 GS
  3
 GS
  4
 GS
  5
 GS
  6
 S5
  7
 S4
  8
 S3
  9
 S2
 10
 S1
 11
 M1
 12
 B4
 13
 B3
 14
 B2
 15
 B1
 16
 A1
 17
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    213 blog entries  next>>
Rail News
48956 views
0

IR Affairs
SER/South Eastern
Jul 26 (07:56)   Train Services Disrupted in Bareilly Due to Roza Station Remodelling

AdittyaaSharma^~   72978 news posts
Entry# 6136580   News Entry# 562176         Tags   Past Edits
read full article... आज भी बरेली नहीं आएंगी कई ट्रेनें, रेल यात्रियों की दिक्कतें बढ़ीं

Due to ongoing remodelling work at Roza station in Bareilly, Uttar Pradesh, many train services have been affected. Several trains were canceled or rerouted on Thursday, July 25th. The affected trains included the Jannayak Express, Jansseva Express, Nauchandi Express, and others. This disruption is a result of inter-locking and non-inter-locking remodelling...
more...
work that began on July 7th. The work is expected to be completed by July 7th, 2024. The Divisional Railway Manager (DRM) visited the site on Thursday and instructed the engineering team to expedite the work. Several trains, including the Lohit Express, Shushasan Express, Garibrath Express, and Amarnath Express, experienced delays on Thursday, causing inconvenience to passengers.

Bareilly ke Roza station pe chal rahe remodelling work ki wajah se, bahut saari trains ka chalna affected ho raha hai. Kafi trains Thursday ko cancel ya divert ho gayi. Isme Jannayak Express, Jansseva Express, Nauchandi Express bhi shamil hain. Ye sab 7 July se chala a raha hai aur...
more...
7 July tak khatam hone wala hai. Thursday ko DRM sahab Roza station gaye aur unhone engineering team ko jaldi kaam pura karne ka kaha. Lohit Express, Shushasan Express, Garibrath Express, aur Amarnath Express, jaise bahut saari trains Thursday ko late thi, isse passengers ko dikkat hui.
Info Update
6380801 views
2

Dec 11 2023 (00:02)   15203/Barauni - Lucknow Jn. Express | BBK/Barabanki Junction (4 PFs)
Kumaon_Tiger^~
Kumaon_Tiger^~   42049 blog posts
Entry# 5907532            Tags   Past Edits
In order to upgrade the infrastructure, Northern Railway will undertake the Pre-Non-Interlocking and Non-Interlocking work for yard remodeling at Barabanki Railway Station and doubling work of Barabanki - Ayodhya Cantt. - Shahganj -Zafrabad section over Lucknow Division. ...
more...

Translate to English
Translate to Hindi
Rail News
156975 views
2

IR Affairs
NER/North Eastern
Apr 09 (09:56)   Indian Railways to Expand Train Routes and Increase Frequencies to Ease Congestion at Gorakhpur Junction

manishsinha   5 news posts
Entry# 6023885   News Entry# 547701         Tags   Past Edits
read full article... Railway News: अमरनाथ एक्सप्रेस का होगा मार्ग विस्तार, आसान होगी वैष्णो धाम की राह, जानिए पूरा शेड्यूल

The Indian Railways is expanding the routes of several trains and increasing the frequency of some others to improve connectivity and reduce congestion at Gorakhpur Junction. Notably, the Amarnath Express (12587/88) will now run to Shri Mata Vaishno Devi Katra, providing a direct rail link for pilgrims from Purvanchal and Bihar....
more...
Other train extensions include the 20103/04 LTT-Gorakhpur-LTT to Thawe, 13507/08 Asansol-Gorakhpur-Asansol to Barhni, 11037/38 Gorakhpur-Pune-Gorakhpur to Balrampur, and 11081/82 LTT-Gorakhpur-LTT to Balrampur. Additionally, the frequency of trains like 12597/98 Gorakhpur-CSMT-Gorakhpur and 22921/22 Bandra-Gorakhpur-Bandra Terminus will be increased to twice a week. This initiative aims to relieve congestion at Gorakhpur Junction and improve connectivity for people in the region, while also facilitating smoother train operations. The Indian Railways Time Table Committee will meet in Jaipur from April 10th to 12th to finalize these plans. The increased train frequency and extended routes are expected to come into effect soon after the committee's approval.

Indian Railways, Gorakhpur Junction pe traffic kam karne aur connectivity badhane ke liye kai train routes ko expand kar raha hai aur kuchh trains ki frequency bhi badha raha hai. Most importantly, Amarnath Express (12587/88) ab Shri Mata Vaishno Devi Katra tak jaayegi, jisse Purvanchal aur Bihar ke shraddhalu direct...
more...
rail link se Shri Mata Vaishno Devi Katra jaa payenge. Other train extensions mein 20103/04 LTT-Gorakhpur-LTT to Thawe, 13507/08 Asansol-Gorakhpur-Asansol to Barhni, 11037/38 Gorakhpur-Pune-Gorakhpur to Balrampur, and 11081/82 LTT-Gorakhpur-LTT to Balrampur shamil hain. Iske alawa, 12597/98 Gorakhpur-CSMT-Gorakhpur aur 22921/22 Bandra-Gorakhpur-Bandra Terminus jaisi trains ki frequency ko hafte mein do din kar diya jaayega. Yeh initiative Gorakhpur Junction pe congestion ko kam karega aur is area ke logon ke liye connectivity badhayega, saath hi train operations ko bhi smooth banaega. Indian Railways Time Table Committee 10th April se 12th April tak Jaipur mein meet karega, jahan yeh plans finalize kiye jayenge. Train frequency badhane aur route extend karne ka plan committee se approval milne ke baad jaldi hi implement kiya jaayega.
General Travel
663444 views
12

★★
Apr 28 2017 (11:26)   15273/Satyagrah Express (PT) | INDB/Indore Junction (6 PFs)
Ehtram Husain~
Ehtram Husain~   21953 blog posts
Entry# 2253979            Tags   Past Edits
Good news revision of traction from 1.5 17
Translate to English
Translate to Hindi

More Posts
Page#    213 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy