Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Tue Sep 10 03:28:16 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

16216/Chamundi Express
चामुंडि एक्सप्रेस

SBC/KSR Bengaluru City Junction (Bangalore) --> CPT/Channapatna

Latest News
(You need to double-check/verify this info yourself)
D3 and D4 are considered as general coaches and as reserved coaches for other trains which has RSA with this train.
Sat May 18, 2019 (03:53PM)
News History
1 Follows
Bedroll/Linen: NOT Available change
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is Only Available at SBC, KGI & MYS.
Updated: Nov 25 2023 (16:16) by Padmakant
Dep:
Arr:
Rating: 3.3/5 (88 votes)
cleanliness - average (16)
punctuality - good (16)
food - average (15)
ticket avbl - good (15)
u/r coach - average (8)
railfanning - good (14)
safety - good (12)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
GEN
  3
GEN
  4
GEN
  5
GEN
  6
GEN
  7
GEN
  8
GEN
  9
GEN
 10
GEN
 11
GEN
 12
GEN
 13
GEN
 14
 D4
 15
 D3
 16
 D2
 17
 D1
 18
 C1
 19
GEN
 20
GEN
 21
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train News

Page#    42 News Items  next>>
Feb 18 (21:46) Rishikesh-Karnprayag Rail Project: Tunnel Excavation Complete, Track Laying Begins Soon
IR Affairs
7738 views
1

News Entry# 541882   
  Past Edits
This is a new feature showing past edits to this News Post.
Trains:  Chamundi Express/16216  
कर्णप्रयाग रेल परियोजना पर जल्द शुरू होगा ट्रैक का निर्माण, इसी माह आवंटित होंगे टेंडर; 71 प्रतिशत सुरंगों की हो चुकी खोदाई

The Rishikesh-Karnprayag Rail Project, a dream project of Prime Minister Narendra Modi, is being built at a cost of ₹16216 crore. Over ₹10748.29 crore has been spent on the project so far. The project is 71% complete in terms of tunnel excavation. The 125 km long project between Rishikesh and Karnprayag...
more...
will have 104 km of rail line passing through 17 tunnels. In addition to these 17 tunnels, the project also includes 12 exit tunnels, as well as adits and cross passages, making the total tunnel length 213 km. So far, 150.809 km of tunnel excavation has been completed out of a total of 213.277 km. The Rail Vikas Nigam Limited (RVNL), the executing agency, is also progressing with the final lining of the tunnels as the excavation work is completed. The RVNL has now invited bids for the laying of the railway track on the Karnprayag rail project. The bids will be awarded on February 24th and the construction of the rail track is expected to begin a month later. The railway track will be a blastless track, similar to those used in metro rail systems or railway stations, instead of the traditional blasted track made with stone ballast. This is due to the fact that 104 km of the rail line will pass through tunnels. While the track within the tunnels will be blastless, the section of the track outside the tunnels will be built using the traditional blasted technique. The total track length will be 133 km blastless and 42 km blasted. Blastless tracks are more robust and require less maintenance.

Rishikesh-Karnprayag Rail Project, PM Modi ka ek dream project hai, ₹16216 crore ke budget mein ban raha hai. Abhi tak ₹10748.29 crore se zyada kharch ho chuka hai. Project mein tunnel excavation 71% complete ho chuka hai. Rishikesh se Karnprayag tak ka 125 km long project mein 104 km rail line...
more...
17 tunnels se hoke guzarega. In 17 tunnels ke alawa, project mein 12 exit tunnels, adits aur cross passages bhi hain, jo ki total tunnel length 213 km banate hain. Abhi tak, 213.277 km tunnel mein se 150.809 km ki excavation complete ho chuki hai. Rail Vikas Nigam Limited (RVNL), jo ki project ko execute kar raha hai, tunnel excavation ke saath saath final lining ka kaam bhi kar raha hai. RVNL ne ab Karnprayag rail project par railway track ke liye bids invite ki hain. Bids 24 February ko award ki jaengi aur rail track ka construction ek month baad start hone ki umeed hai. Railway track blastless track hoga, jaise ki metro rail systems ya railway stations mein use kiya jata hai, traditional blasted track, jismein stone ballast use hota hai, ki jagah. Ye isliye hai ki 104 km rail line tunnels se hoke guzaregi. Tunnel ke andar track blastless hoga, lekin tunnel ke bahar ka track traditional blasted technique se banaya jayega. Total track length 133 km blastless aur 42 km blasted hoga. Blastless tracks zyada strong aur safe hote hain aur unki maintenance bhi kam chahiye.
Rishikesh-Karnprayag Rail Project देश की सबसे लंबी डबल ट्यूब रेल सुरंग के निर्माण में टनल बोरिंग मशीन की मदद ली जा रही है। यह मशीन जर्मनी...
Rishikesh-Karnprayag Rail Project : यहां बन रही देश की सबसे लंबी डबल ट्यूब रेल सुरंग, जर्मनी से आई मशीन

Rail News
23813 views
0

Aug 05 2022 (15:03)
SmallTownTraveller^~
SmallTownTraveller^~   11026 blog posts
Re# 5437540-1              
vikas ki ganga se kahi kudrat na naraj ho jaaye
Translate to English
Translate to Hindi
May 25 2021 (21:05) Karnprayag Rail Project: कोरोना की चुनौती के बीच भी जारी परियोजना का काम, तैयार हुई 7.28 किलोमीटर सुरंग
Commentary/Human Interest
NR/Northern
35783 views
6

News Entry# 452606   
  Past Edits
May 25 2021 (21:05)
Station Tag: Dehradun Terminal/DDN added by ⭐ ⭐ ⭐ Telangana Express Oops AP Express ⭐ ⭐ ⭐/1366147
Trains:  Chamundi Express/16216  
Stations:  Dehradun/DDN  
कोराना महामारी की दूसरी लहर में भी ऋषिकेश-कर्णप्रयाग रेल परियोजना का काम लगातार जारी है। कोविड कर्फ्यू व संक्रमण के खतरे के बीच विषम परिस्थितियों ने...
Karnprayag Rail Project: कोरोना की चुनौती के बीच भी जारी परियोजना का काम, तैयार हुई 7.28 किलोमीटर सुरंग

Rail News
26154 views
2

May 25 2021 (21:25)
Rang De Basanti^   60108 blog posts
Re# 4969601-1              
Shouldn't RVNL develop it as double electrified line from day 1?
Translate to English
Translate to Hindi

25046 views
1

May 25 2021 (21:28)
Harsh12345ER~   21389 blog posts
Re# 4969601-2              
Yes
Baad mein jab traffic bash Jayega tab dikkat Hoga
Important structures ko toh important karna hi Chahiye
Same with nfr new lines
Translate to English
Translate to Hindi

22215 views
0

May 26 2021 (11:00)
AniJu~
AniJu~   4707 blog posts
Re# 4969601-3              
I think doubling k hisab se hi kaam ho raha hai... Jaisa chinab bridge ka hua hai kashmeer me
Translate to English
Translate to Hindi

21482 views
0

May 26 2021 (14:28)
ETWAP7~
ETWAP7~   3090 blog posts
Re# 4969601-4              
Toh Katra se Banihal ki line double electrified bn rhi h kya?
Translate to English
Translate to Hindi

19976 views
1

May 26 2021 (14:57)
AniJu~
AniJu~   4707 blog posts
Re# 4969601-5              
Bridge or tunnels us hisab se hi ban rahe hain
Translate to English
Translate to Hindi
Feb 18 2021 (06:33) कर्णप्रयाग रेल परियोजना पर हुआ पांच किमी टनल का निर्माण
Commentary/Human Interest
NR/Northern
14587 views
0

News Entry# 439694   
  Past Edits
Feb 18 2021 (06:33)
Station Tag: Yog Nagari Rishikesh/YNRK added by Anupam Enosh Sarkar/401739
Trains:  Chamundi Express/16216  
Stations:  Yog Nagari Rishikesh/YNRK  
जागरण संवाददाता, ऋषिकेश : ऋषिकेश-कर्णप्रयाग रेल परियोजना पर रेल विकास निगम अब तक पांच किलोमीटर टनल का निर्माण पूरा कर चुका है। जिसमें मुख्य टनल के...
कर्णप्रयाग रेल परियोजना पर हुआ पांच किमी टनल का निर्माण
Page#    42 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy