This train runs with coaches manufactured in 90s, 2000s. Charging points in SLB available only in coaches manufactured after 2010-11 which means this train likely will not have any SL coaches with charging points there. You will find only near the doors. Its RSA partner is very well maintained but since the rake comes to MAS and has a turn around time of only 3 hours, only sweeping of coaches will be done. Do not expect the toilets to be clean.