3 Passenger and 2 express trains from Mysore which hitherto were dealt on 2nd platform at Kengeri railway station (KGI) will henceforth arrive on 1st platform (One express train is Mysuru bagalkot Basava which I saw arriving on PF 1 on 7th when I was in Kengeri). This is good news both for Mysuru Kengeri and Kengeri SBC Passengers as earlier, Passengers from Mysore alighting at Kengeri with heavy luggage were required to use foot overbridge to reach 1st platform. The same is displayed at the station notice board.