Status of Electrification at Rewari Jn. [NWR]
Important things to note :-
1. The lines going to the left side is for Alwar Bandikui Jaipur & Phulera.
2. The single line on the right side is also going towards phulera but via Narnaul, Ringas, Neem ka thana.
3....
more... Both lines splits from Rewari & again meet each other at Phulera.
4. The most intersting thing which i observed is the height of electric poles installed for single line (right side). U can clearly see that the height of the electric poles for Rewari-Ringas-Phulera line is higher as compared to Rewari-Alwar-Jaipur-Phulera line. The reason is :- The Rewari-Ringas-Pulera line will be used for DFC & IR is planning to run double stack container trains with electric loco through this route.
5. A view of Rewari Railway station (facing Delhi side) can be seen in the given pictures. Enjoy :-)