also confirmed that two of the train's coaches have been sent to SR as it was "in need of it"
"Once we get the 10 coaches after the POH, in say two to three months, we will operate the double decker train on the Mumbai-Goa KR route. The two coaches given to SR will also be returned to us by then. Even if we do not get back those two coaches, we can very well run the double decker train with 10 coaches," Sood said