Translation in Gist
Inspection in 39 Km Vridachalam - Tiruvennainallur Second Electrified Track in Viluppuram - Dindigul line done by CRS Sh. SK Mittal. Yesterday, he inspected the second track, engineering works, ballast stone foundation, bridge strength, signalling, etc... Southern Rly GM Mishra, RVNL Chief Project Mgr Pradeep Kaur, TPJ Division Rly Mgr Agarwal were with him inspecting the track in 9 trolleys ... Today (22/09/2015) at 1430 hrs, High Speed Trial would be done ...