Since,the terminal work at TBM is almost nearing completion,can we expect the TT Changes in TAAG 2016 to have more train stoppages at TBM?
Mostly by October end the terminal might start, the TT of the trains that start from here should be updated in TAAG2016 i guess,anybody have idea on this?
Yesterday,I had a look at the pit line work at the Bharatmata street side of TBM East,its almost complete;i could see total 4 lines with two pit-lines;electrification also completed;water tank is nearing completion; But the 2 new tracks towards...
more... TBM Sanatorium electrification is pending.poles are erected and cabling needs to be done;
very happy to see the beautification and remodeling of the east side entrance of the TBM station.