Even removal of 2 gen coaches in overnight train should have been done with augmentation of general coaches in other convenient train. Removing 2 SLR coaches also in addition to those is really too much, I wonder how many gen coaches remain in the LHBfied train??
LHB Fication is a costly affair for IR as well as causing inconvenience to paxs. IR has really messed up the two good resources it possess i.e. LHB coaches and ACDD coaches.
Pl see related post Re# 2037357-3 dated 27.10.16