Yes. something has happened to SWR, the pace of work at TK was very fast. In the hour I was waiting they completed at least 100 m of PF2 edge-wall by installing cement blocks with JCB, filling the gaps with cement and levelling the PF.
-
At new line too the entire PF 2 main line was topped-up by crushed stones by the 2 trucks in half-hour. They were waiting for ballast packing machine to come back from Thippasandra to finish the work on PF2 by evening.