Google maps are not up to date Sir. Especially in India, its about a year or 2 older. Check out these pics in taken in Diguvametta.
/blog/post/1968968Nallapadu to Diguvametta poles are done. Nallapadu to pagidipalli works to be started. Guntakal to Raichur electrification trial run was already done I think.