Some bad news for GC section. reply of my Grievance regarding connectivity issue betwwn MGS-Gaya-DHN
************************************************** ...
more...
Registration Number : MORLY/E/2017/XXXXX
Name Of Complainant: Ajay Singh
Date of Receipt : 05 Mar 2017
Received by : Ministry of Railways, ( Railway Board)
Forwarded to : East Central Railway
Contact Address: OFFICE OF THE GENERAL MANAGER
EAST CENTRAL RAILWAY
HAJIPUR (VAISHALI) -
-------------------------------------------------- -------------------------------------------------- -------------------------------------------------- ------------------------------------------
Grievance Description
--------------------------
Sir/Madam My concern is about MGS_Gaya_DHN section in which passengers have to face lots of problem as there were no daily train after 12802 Purushottam Express to travel from BSB/MGS to Gaya-DHN. After Purushottam express there are 2 trains 13010 and 12308 but the punctuality of this train is very poor. The avg delay is about 3-4 hrs daily. Therefore people of SSM-DOS-Gaya-Dhn have to suffer a lot. Some time it took 12-15 hrs to travel from Bsb to Gaya and dhn. I saw people how they begging for train at DOS stn. Because of late running of DOS-GAYA pass, Daily passengrs from SSM DOS have to manage late night run.
.....................
My suggestion-
1. In every 2-3 hrs gap there should be a MEMU between Gaya AND MGS/BSB.
2. DHN GAYA Intercity should be extended upto MGS.
3. 12308 and 13010 should be speeded up so that it can reach gaya before 9 pm.
4. Train running timing should be revised according to need of the passengers. Sometime there is regular train here but sometime its blank for hours. .
5.Lack of FOB near Gaya Jn, too danger for the people , they are bound to cross the railway lines as there is no other way to cross it.
\\
Thankyou sir/madam
\\
Current Status: CASE CLOSED
************************************************** ************************************************** ************
Date of Action: 17 Mar 2017
----------------------------------
Details :The suggestions has been examined which are as under:
\\
1. Additional trains like MEMU requires additional rakes and maintenance facility which is not available near Gaya at present. Path is also not available in GC for introduction of new trains.
2. Extension of DHN-Gaya-DOS upto MGS is not possible at present due to path not available and MGS is already congested.
3. Timings of long distance trains are being made as per suitability of long distance passengers and not as per local passengers.
4. The delay in train running is only due to fog and maintenance works is recent months. Now punctuality of local trains is improved and being monitored on daily basis.
************************************************** ************************************************** *************
Your suggestions for additional trains is noted for discussion on the same in next time tabling meeting regarding feasibility or alteration.
Thanking you for upcoming suggestions.