Do any others have a say in these meetings. Does common man ever participate?
-
1. None seem to have asked for a train to Bengaluru from HPT-BAY, BGM.
2. Nothing about HPT-KTY section opening for passenger trains.
3....
more... When Gangavati station is opened, any train to Bengaluru?
4. There was news that Foundation stone would be laid for TK-DVG new line in March-April by RM, nothing about that. No funds from IR, though state has handed some land over to IR, and acquiring the rest at a fast pace.
5. Talks of Foundation stone laying between Talaguppa-Siddapura in Jan, still nothing.
6. Nothing about when Alnavar-Ambewadi will be open for passenger trains.
-
Atlas Monitors: As per this news DWR- KBI and SVTN-LD has been doubled. Could you please modify IRI atlas for the same.
-
22139/40 if and when extended, will it be daily?
-