Blog Entry# 3154528
Posted: Feb 28 2018 (07:37)
2 Responses
Last Response: Oct 07 2018 (09:21)
Tweets by DRM SBP
Arand station commissioned with 4 line, Electronic Interlocking- the latest technology, MACLS. In this process SBP Div has done away with another semaphore signalling system. Double line btn ARN-MSMD opened.
.
Mahasamund station commissioned with Signalling system n Electronic Interlocking while opening double line between MSMD-BLSN n MSMD-ARN.
....
more...
1st train to roll on track was 12844 adi puri sf
This is 8 month old news.