The timings could be fixed in such a way that it arrives at bellandur, carmelaram around 9-9:30, making it a convenient option for people coming for work.
Likewise the return time could also be around 6-6:30. But i guess the congestion and path availability could be a an issue in the already congested single line stretch. But if a suitable time is set, it can surely be a huge boost for people working in outer ring road, bellandur, sarjapur stretch